Access the full text.
Sign up today, get DeepDyve free for 14 days.
G. Dantzig (2004)
Linear Programming Under UncertaintyManag. Sci., 50
Ertunga Özelkan, M. Çakanyıldırım (2007)
Resource downgradingEur. J. Oper. Res., 177
R. Lucas, E. Prescott (1971)
Investment Under UncertaintyEconometrica, 39
Chuen-Shiuan Liou, T. Lin, B. Tu, A. Chang (2005)
Capacity forecast model for control and dummy wafersISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005.
Muh-Cherng Wu, Chen-Fu Chien, K. Lu (2005)
Downgrade decision for control/dummy wafers in a fabThe International Journal of Advanced Manufacturing Technology, 26
S. Chung, He-Yau Kang, W. Pearn (2005)
A service level model for the control wafers safety inventory problemThe International Journal of Advanced Manufacturing Technology, 26
E. Beale (1955)
ON MINIMIZING A CONVEX FUNCTION SUBJECT TO LINEAR INEQUALITIESJournal of the royal statistical society series b-methodological, 17
R. Wets (1984)
Large Scale Linear Programming Techniques in Stochastic Programming
C. Wong, S. Hood (1994)
Impact of process monitoring in semiconductor manufacturingProceedings of 16th IEEE/CPMT International Electronic Manufacturing Technology Symposium
S. Chung, W. Pearn, He-Yau Kang (2005)
A linear programming model for the control wafers downgrading problemThe International Journal of Advanced Manufacturing Technology, 25
S.B. Popovich, S. Chilton, B. Kilgore (1997)
Implementation of a test wafer inventory tracking system to increase efficiency in monitor wafer usage1997 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop ASMC 97 Proceedings
B. Foster, D. Meyersdorf, J. Padillo, R. Brenner (1998)
Simulation of test wafer consumption in a semiconductor facilityIEEE/SEMI 1998 IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop (Cat. No.98CH36168)
D. Benavides, J. Duley, B. Johnson (1999)
As good as it gets: optimal fab design and deployment, 12
R. Wets (1989)
Stochastic programmingOptimization
Lin Lin, Chang Chang, Chou Chou (2005)
Application of stochastic programming to tool portfolio planning in semiconductor manufacturingJournal of Management and Systems, 12
The subject of this paper is to study a realistic planning environment in wafer fabrication for the control or dummy (C/D) wafers problem with uncertain demand. The demand of each product is assumed with a geometric Brownian motion and approximated by a finite discrete set of scenarios. A two‐stage stochastic programming model is developed based on scenarios and solved by a deterministic equivalent large linear programming model. The model explicitly considers the objective to minimize the total cost of C/D wafers. A real‐world example is given to illustrate the practicality of a stochastic approach. The results are better in comparison with deterministic linear programming by using expectation instead of stochastic demands. The model improved the performance of control and dummy wafers management and the flexibility of determining the downgrading policy. Copyright © 2008 John Wiley & Sons, Ltd.
Applied Stochastic Models in Business and Industry – Wiley
Published: May 1, 2009
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.