Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Multi-objective optimal allocation strategy for the energy internet in Huangpu District, Guangzhou, China

Multi-objective optimal allocation strategy for the energy internet in Huangpu District,... To improve the overall efficiency of the energy system, the basic structure for the energy internet of coordination and optimization of “generation-grid-load-storage” of Huangpu District, Guangzhou, China is designed, while the arrangement for the output of centralized and distributed energy module and energy storage are proposed. Taking economic benefit maximization, environmental benefit maximization and energy efficiency maximization as sub-objectives, the mathematical model of multi-objective optimal allocation and operation strategy of the energy internet is established considering supply-demand balance constraints, equipment characteristic constraints, operation mode constraints, and energy conditions constraints. The calculation results show that without considering the outsourced electricity, the balanced strategy, the economic development strategy, the environmental protection strategy, and the energy efficiency strategy are obtained by calculation, which are all superior to the traditional energy supply strategy. Moreover, considering the outsourced electricity, the proportion of outsourced electricity to total electricity is 19.8%, which is the system optimization of the energy internet under certain power demand. Compared with other strategies without outsourced electricity, the outsourced electricity strategy can have a certain emission reduction effect, but at the same time reduce the economic benefit. Furthermore, the huge difference in demand for thermal and cooling load between industrial and commercial areas results in the installed capacity of gas distributed energy stations in industrial areas being nearly twice as large as that in commercial areas. The distributed photovoltaic power generation is allocated according to the proportion of the installed roof areas of photovoltaic power generation system in residential, industrial, and commercial areas. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png "Frontiers in Energy" Springer Journals

Multi-objective optimal allocation strategy for the energy internet in Huangpu District, Guangzhou, China

Loading next page...
 
/lp/springer-journals/multi-objective-optimal-allocation-strategy-for-the-energy-internet-in-q87xts7IqX

References (29)

Publisher
Springer Journals
Copyright
Copyright © Higher Education Press and Springer-Verlag GmbH Germany, part of Springer Nature 2020
ISSN
2095-1701
eISSN
2095-1698
DOI
10.1007/s11708-020-0660-9
Publisher site
See Article on Publisher Site

Abstract

To improve the overall efficiency of the energy system, the basic structure for the energy internet of coordination and optimization of “generation-grid-load-storage” of Huangpu District, Guangzhou, China is designed, while the arrangement for the output of centralized and distributed energy module and energy storage are proposed. Taking economic benefit maximization, environmental benefit maximization and energy efficiency maximization as sub-objectives, the mathematical model of multi-objective optimal allocation and operation strategy of the energy internet is established considering supply-demand balance constraints, equipment characteristic constraints, operation mode constraints, and energy conditions constraints. The calculation results show that without considering the outsourced electricity, the balanced strategy, the economic development strategy, the environmental protection strategy, and the energy efficiency strategy are obtained by calculation, which are all superior to the traditional energy supply strategy. Moreover, considering the outsourced electricity, the proportion of outsourced electricity to total electricity is 19.8%, which is the system optimization of the energy internet under certain power demand. Compared with other strategies without outsourced electricity, the outsourced electricity strategy can have a certain emission reduction effect, but at the same time reduce the economic benefit. Furthermore, the huge difference in demand for thermal and cooling load between industrial and commercial areas results in the installed capacity of gas distributed energy stations in industrial areas being nearly twice as large as that in commercial areas. The distributed photovoltaic power generation is allocated according to the proportion of the installed roof areas of photovoltaic power generation system in residential, industrial, and commercial areas.

Journal

"Frontiers in Energy"Springer Journals

Published: Jun 30, 2020

There are no references for this article.