Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods

Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods J. Inst. Eng. India Ser. A https://doi.org/10.1007/s40030-018-0353-0 ORIGINAL CONTRIBUTION Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods 1 1 2 • • Manvinder Singh Debasis Sarkar Divyarajsinh Vara Received: 22 March 2018 / Accepted: 17 December 2018 The Institution of Engineers (India) 2019 Abstract This paper is an attempt to develop and compare modified expected value method works well for up to 25 the risk indices developed by various methods of project activities and fuzzy analytic hierarchy process works well risk analysis like modified expected value method, fuzzy for up to 20 activities. expected value method and fuzzy analytic hierarchy pro- cess for an elevated metro rail corridor construction project Keywords Risk index  Elevated corridor  Metro rail in Bangalore, India. Risk management is increasingly a Modified expected value method (MEVM)  Fuzzy AHP critical success factor for major infrastructure projects. It helps to identify, analyse, mitigate and control the risks associated with project cost, schedule and scope. Infras- Introduction tructure projects are usually faced by different types of risks associated with different types of activities which Project management issues like cost overrun and time finally lead to cost and time overrun. The main http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of The Institution of Engineers (India): Series A Springer Journals

Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods

Loading next page...
 
/lp/springer-journals/comparative-study-of-risk-indices-for-infrastructure-transportation-OTUGV3pNh3
Publisher
Springer Journals
Copyright
Copyright © 2019 by The Institution of Engineers (India)
Subject
Engineering; Civil Engineering
ISSN
2250-2149
eISSN
2250-2157
DOI
10.1007/s40030-018-0353-0
Publisher site
See Article on Publisher Site

Abstract

J. Inst. Eng. India Ser. A https://doi.org/10.1007/s40030-018-0353-0 ORIGINAL CONTRIBUTION Comparative Study of Risk Indices for Infrastructure Transportation Project Using Different Methods 1 1 2 • • Manvinder Singh Debasis Sarkar Divyarajsinh Vara Received: 22 March 2018 / Accepted: 17 December 2018 The Institution of Engineers (India) 2019 Abstract This paper is an attempt to develop and compare modified expected value method works well for up to 25 the risk indices developed by various methods of project activities and fuzzy analytic hierarchy process works well risk analysis like modified expected value method, fuzzy for up to 20 activities. expected value method and fuzzy analytic hierarchy pro- cess for an elevated metro rail corridor construction project Keywords Risk index  Elevated corridor  Metro rail in Bangalore, India. Risk management is increasingly a Modified expected value method (MEVM)  Fuzzy AHP critical success factor for major infrastructure projects. It helps to identify, analyse, mitigate and control the risks associated with project cost, schedule and scope. Infras- Introduction tructure projects are usually faced by different types of risks associated with different types of activities which Project management issues like cost overrun and time finally lead to cost and time overrun. The main

Journal

Journal of The Institution of Engineers (India): Series ASpringer Journals

Published: Jan 25, 2019