Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Assessment of Replacement Bridge using Proof Load Test

Assessment of Replacement Bridge using Proof Load Test This work begins with an overview of the condition assessment of old bridge and explained reasons for demolishing of the bridge. Briefly presented flexural analysis of two stage post-tensioned prestressed concrete girder, which will be replace the old (new bridge). Construction of I-girder and composite girder at first stage and second stage prestressing respectively is explained with figures. Assessment of the load-caring capacity of the one span of the replacement bridge with simple supports using proof load test is presented which is mandatory according to Indian standards. Weighted sand bags were used to load the bridge up to a predetermined service load with impact factor. Deflections of the I-girders of the bridge were measured at selected locations along and across the bridge span and compared with computed values. Linear response was observed during loading and unloading. Considering the load test results, theoretical estimation and criteria as stipulated in codes of practice, it can be inferred that prestressed concrete I-girder bridge span has adequate capacity to carry the loads and hence, deemed to have passed the test. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of The Institution of Engineers (India): Series A Springer Journals

Assessment of Replacement Bridge using Proof Load Test

Loading next page...
 
/lp/springer-journals/assessment-of-replacement-bridge-using-proof-load-test-5AfbHKBit0
Publisher
Springer Journals
Copyright
Copyright © 2017 by The Institution of Engineers (India)
Subject
Engineering; Civil Engineering
ISSN
2250-2149
eISSN
2250-2157
DOI
10.1007/s40030-017-0259-2
Publisher site
See Article on Publisher Site

Abstract

This work begins with an overview of the condition assessment of old bridge and explained reasons for demolishing of the bridge. Briefly presented flexural analysis of two stage post-tensioned prestressed concrete girder, which will be replace the old (new bridge). Construction of I-girder and composite girder at first stage and second stage prestressing respectively is explained with figures. Assessment of the load-caring capacity of the one span of the replacement bridge with simple supports using proof load test is presented which is mandatory according to Indian standards. Weighted sand bags were used to load the bridge up to a predetermined service load with impact factor. Deflections of the I-girders of the bridge were measured at selected locations along and across the bridge span and compared with computed values. Linear response was observed during loading and unloading. Considering the load test results, theoretical estimation and criteria as stipulated in codes of practice, it can be inferred that prestressed concrete I-girder bridge span has adequate capacity to carry the loads and hence, deemed to have passed the test.

Journal

Journal of The Institution of Engineers (India): Series ASpringer Journals

Published: Nov 29, 2017

References