Access the full text.
Sign up today, get DeepDyve free for 14 days.
M. Ghobadi, A. Mazroi, M. Ghassemieh (2009)
Cyclic response characteristics of retrofitted moment resisting connectionsJournal of Constructional Steel Research, 65
(2002)
Experimental evaluation of platereinforced steel moment-resisting connections”, Journal of Structural Engineering, ASCE, Vol
(1995)
Interim Guidelines: Evaluation, Repair, Modification and Design of Welded Steel Moment Frame Structures, Report No
Taejin Kim, A. Whittaker, A. Gilani, V. Bertero, S. Takhirov (2002)
Experimental Evaluation of Plate-Reinforced Steel Moment-Resisting ConnectionsJournal of Structural Engineering-asce, 128
(2008)
Fatigue of steel structures preface”, International Journal of Steel Structures, Editorial material, Vol
J. Zhang, P. Dong (2000)
Residual Stresses in Welded Moment Frames and Implications for Structural PerformanceJournal of Structural Engineering-asce, 126
(2001)
Analytical modeling and seismic design of steel moment connections with welded straight haunch”, Journal of Structural Engineering, ASCE, Vol
Wang Yuan-qing (2007)
ANALYTICAL MODEL OF COVER-PLATE RETROFITTED STEEL MOMENT CONNECTION WITH INITIAL LOADINGEngineering mechanics
(2000)
Seismic rehabilitation
M. Engelhardt, T. Sabol (1998)
Reinforcing of steel moment connections with cover plates: benefits and limitationsEngineering Structures, 20
Cheng-Chih Chen, Shuang Chen, Ming-Dar Chung, Ming-Chih Lin (2005)
Cyclic behaviour of unreinforced and rib-reinforced moment connectionsJournal of Constructional Steel Research, 61
J. Rodgers, S. Mahin, M. Çelebi (2007)
Proposed Approaches to Fracture Damage Detection for Sparsely Instrumented Steel Moment-framed Buildings
(2000)
State of the Art Report on Connection Performance, Rep
(1998)
Repair/Upgrade Procedures for Welded Beam to Column Connections, Report No
R. Bjorhovde (2005)
Realistic Performance Requirements for Steel in StructuresAdvances in Structural Engineering, 8
J. Anderson, Yan Xiao, Jean Duan (2002)
REPAIR/UPGRADE OF STEEL MOMENT FRAMES IN LOW RISE BUILDINGS
Cheol-Ho Lee, C. Uang (2001)
Analytical Modeling and Seismic Design of Steel Moment Connections with Welded Straight HaunchJournal of Structural Engineering-asce, 127
(2000)
Modeling the effects
(2000)
Cover-Plate and Flange-Plate Reinforced Steel Moment-Resisting Connections, Report No
C. Matos, R. Dodds (2000)
Modeling the effects of residual stresses on defects in welds of steel frame connectionsEngineering Structures, 22
Taejin Kim, A. Whittaker, A. Gilani, V. Bertero, S. Takhirov (2002)
Cover-Plate and Flange-Plate Steel Moment-Resisting ConnectionsJournal of Structural Engineering-asce, 128
Brandon Chi, C. Uang, Albert Chen (2006)
Seismic rehabilitation of pre-Northridge steel moment connections: A case studyJournal of Constructional Steel Research, 62
L. Hollaway, L. Zhang, N. Photiou, J. Teng, S. Zhang (2006)
Advances in Adhesive Joining of Carbon Fibre/Polymer Composites to Steel Members for Repair and Rehabilitation of Bridge StructuresAdvances in Structural Engineering, 9
P. Bogaert, W. Corte (2007)
Improvements to the analysis of floorbeams with additional web cutouts for orthotropic plated decks with closed continuous ribsSteel and Composite Structures, 7
Q. Yu, C. Uang, J. Gross (2000)
SEISMIC REHABILITATION DESIGN OF STEEL MOMENT CONNECTION WITH WELDED HAUNCHJournal of Structural Engineering-asce, 126
A. Whittaker, A. Gilani, S. Takhirov, C. Ostertag (2002)
Forensic studies of a large cover‐plate steel moment‐resisting connectionStructural Design of Tall Buildings, 11
(1998)
Reinforcing of steel
Rehabilitated steel moment connections differentiate from newly erected and strengthened ones in that the connections are subject to initial loading during the rehabilitation process. In this circumstance, significant stress redistribution will take place. Therefore, the design method for a newly erected and strengthened connection is not applicable. This paper investigates cover-plate rehabilitation. Finite element analysis was conducted to simulate the rehabilitation process with initial loading. The moment distributions between the cover plates and the original connections take the different initial loading into account. A revised design procedure for rehabilitation process using cover plates is proposed.
Advances in Structural Engineering – SAGE
Published: Oct 1, 2011
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.