This paper proposes an innovative key-segment closing method for partially earth-anchored cable-stayed bridges erected using free cantilever construction method, and examines its feasibility by performing a construction sequence analysis. The proposed method is based on the thermal prestressing technique, which gives an artificial heat to the girder in a cantilever state, in order to introduce the closing force required for connecting the key-segment to the adjacent segment by means of thermal expansion. The new method not only provides a feasible closing method for partially earth-anchored cable-stayed bridges, but also has a significant effect in reducing the axial force in the girders. A construction sequence analysis of an example bridge shows that the axial forces in the girders and the uplift forces at the bearings are reduced by a considerable amount due to application of the thermal prestressing method, whereas the member forces of cables and pylons are slightly changed. Therefore, it is verified from this study that the structural capacities of the girders and the bearings of the partially earth-anchored cable-stayed bridges can be effectively enhanced by application of the proposed method.
Advances in Structural Engineering – SAGE
Published: Oct 1, 2008
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.