Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Guest Editorial

Guest Editorial vehicle-bridge coupling system during two trains The past few years have witnessed rapid progress in the passing by. The paper “Earthquake response analysis development of high-speed and intercity railways in with travelling-wave for a long-span steel truss-arch China. A large number of high-speed rail lines and railway bridge” by Wang and Xu presents the seismic urban metro projects have been launched or opened to response analysis of a long-span steel truss-arch the public in recent years, for example, the Beijing- railway bridge by considering the travelling wave effect Shanghai High-Speed Rail, the world’s longest high- of earthquake. speed rail line opening to the public in June 2011. The subsequent seven papers focus on the research Aiming at providing a platform for academic scholars pertaining to railway tunnels. The paper “Structural and practicing engineers to share knowledge and responses of secondary lining of high-speed railway experience, to promote collaboration, and to strengthen tunnel excavated in loess ground” by Zhang et al. R&D activities related to railway engineering, the 1st investigates the structural responses of the secondary International Workshop on High-speed and Intercity lining of a high-speed rail tunnel excavated in loess Railways (IWHIR 2011) was held in Shenzhen and ground. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Advances in Structural Engineering SAGE

Loading next page...
 
/lp/sage/guest-editorial-qB4eotC4HU
Publisher
SAGE
Copyright
© 2013 SAGE Publications
ISSN
1369-4332
eISSN
2048-4011
DOI
10.1260/1369-4332.16.8.i
Publisher site
See Article on Publisher Site

Abstract

vehicle-bridge coupling system during two trains The past few years have witnessed rapid progress in the passing by. The paper “Earthquake response analysis development of high-speed and intercity railways in with travelling-wave for a long-span steel truss-arch China. A large number of high-speed rail lines and railway bridge” by Wang and Xu presents the seismic urban metro projects have been launched or opened to response analysis of a long-span steel truss-arch the public in recent years, for example, the Beijing- railway bridge by considering the travelling wave effect Shanghai High-Speed Rail, the world’s longest high- of earthquake. speed rail line opening to the public in June 2011. The subsequent seven papers focus on the research Aiming at providing a platform for academic scholars pertaining to railway tunnels. The paper “Structural and practicing engineers to share knowledge and responses of secondary lining of high-speed railway experience, to promote collaboration, and to strengthen tunnel excavated in loess ground” by Zhang et al. R&D activities related to railway engineering, the 1st investigates the structural responses of the secondary International Workshop on High-speed and Intercity lining of a high-speed rail tunnel excavated in loess Railways (IWHIR 2011) was held in Shenzhen and ground.

Journal

Advances in Structural EngineeringSAGE

Published: Aug 1, 2013

There are no references for this article.