Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Cost Analysis Case Study of Grid Integration of Larger Wind Farms

Cost Analysis Case Study of Grid Integration of Larger Wind Farms This paper assesses the connection of a large wind farm to a regional power system with a weak link to the main transmission grid. The study demonstrates that utilization of modern wind turbine technology and automatic generation control schemes allow operation of large wind farms in weak grids. In the case study considered of a regional power system, the viable wind farm capacity may be increased from 50 to 200 MW. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Wind Engineering SAGE

Cost Analysis Case Study of Grid Integration of Larger Wind Farms

Wind Engineering , Volume 28 (3): 9 – May 1, 2004

Loading next page...
 
/lp/sage/cost-analysis-case-study-of-grid-integration-of-larger-wind-farms-JDGb0RKgWs

References (3)

Publisher
SAGE
Copyright
© 2004 SAGE Publications
ISSN
0309-524X
eISSN
2048-402X
DOI
10.1260/0309524041590116
Publisher site
See Article on Publisher Site

Abstract

This paper assesses the connection of a large wind farm to a regional power system with a weak link to the main transmission grid. The study demonstrates that utilization of modern wind turbine technology and automatic generation control schemes allow operation of large wind farms in weak grids. In the case study considered of a regional power system, the viable wind farm capacity may be increased from 50 to 200 MW.

Journal

Wind EngineeringSAGE

Published: May 1, 2004

There are no references for this article.