Formula for Determining the Construction Workers Productivity Including Environmental Factors
Formula for Determining the Construction Workers Productivity Including Environmental Factors
Malara, Jarosław;Plebankiewicz, Edyta;Juszczyk, Michał
2019-11-26 00:00:00
buildings Article Formula for Determining the Construction Workers Productivity Including Environmental Factors Jarosław Malara, Edyta Plebankiewicz * and Michał Juszczyk Faculty of Civil Engineering, Cracow University of Technology, Warszawska 24, 31-155 Kraków, Poland; jmalara@l7.pk.edu.pl (J.M.); mjuszczyk@l7.pk.edu.pl (M.J.) * Correspondence: eplebank@l7.pk.edu.pl; Tel.: +48-12-628-23-30 Received: 31 October 2019; Accepted: 23 November 2019; Published: 26 November 2019 Abstract: The aim of this study is to build a mathematical model of the productivity of construction workers. It does so by selecting 17 factors that influence the productivity of construction workers and categorising them into five groups. For the mathematical description of the factors, fuzzy logic was used. A formula for calculating the work productivity of construction workers is proposed. The novelty of the approach proposed by the authors is rooted in the consideration of various factors that have the potential to influence the productivity of construction workers. To present the way the formula operates, a single assessment of ceiling formwork was undertaken. The verification of a model confirmed its capability of analyzing, evaluating, and predicting the productivity of construction workers with satisfying accuracy. Keywords: workers productivity; construction; fuzzy logic; environmental factors; labour 1. Introduction The construction of buildings is related to the execution of various types of tasks, which require dierent material expenditures and eorts from workers, who should possess a variety of skills. The type of construction work performed, and the characteristics of the workers strongly influence the time spent on performing a particular task. An additional problem is the interaction of the environment and various other factors characterized by instability (e.g., changing weather conditions). In terms of environmental factors, the authors consider all identifiable elements in the environment, e.g., physical, economic, technological etc., that aect the productivity of construction workers. Construction labour is one of the main resources, so labour productivity, as well as completeness and correctness of the executive project, plays a key role in predicting the time and cost of construction activities [1–3]. In the literature on the subject, the term “productivity” is defined in dierent ways. In construction, productivity is usually taken to mean labour productivity [4]. Most researchers defined labour productivity as a relationship between human hours and work accomplished [5]. Hwang and Soh [6] as well as Yi and Chan [7] defined labor productivity as the relationship between the output produced and the inputs used during the production process period. Moselhi and Khan [5] as well as Nguyen and Nguyen [8] defined labor productivity as a ratio of output to input while producing a product. In economic science, the ratio is usually expressed as a percentage, e.g., 100% productivity means that the person is working as per the standard, while a higher score means that he or she is working more eciently, that is, producing more units than those specified in the standard. This definition will be used in the model proposed. The aim of this paper is to report the results of studies on the development of a mathematical model capable of analyzing, evaluating, and predicting the productivity of construction workers. The novelty of the approach proposed by the authors roots in taking into account various factors that have the potential to influence productivity of construction workers. The goal was to develop a Buildings 2019, 9, 240; doi:10.3390/buildings9120240 www.mdpi.com/journal/buildings Buildings 2019, 9, 240 2 of 14 model that binds together a number of multidisciplinary factors as the input, with productivity of a worker, or a gang of workers, assigned to a specific construction work as the output. Other studies, in comparison, usually focus on groups of factors that derive from one or at least two disciplines. In the course of the research, various factors aecting the productivity of construction workers have been analyzed and introduced to the model. As a tool, which was implemented for the formal description of relationships between values of dierent factors and productivity of workers, fuzzy logic was used. The studies resulted in the formulation of a mathematical relationship, which is a core of a developed model. Verification of the model confirmed its capability of analyzing, evaluating, and predicting productivity of construction workers with satisfying accuracy. 2. Literature Review Numerous researchers have attempted to develop models for predicting construction labour productivity. Methodologies that exist in construction labour productivity research area can be categorised as follows: (1) qualitative research methods, (2) quantitative research methods and (3) mixed method approaches, which involve a combination of qualitative and quantitative approaches [9]. Another classification of construction labour productivity is based on the research focus of each study, which can be: (1) archival study, (2) empirical research, and (3) simulation methodology. Many models apply advanced mathematical methods. These modeling techniques encompass statistical and regression models, expert systems, artificial intelligence, and simulation. Regression-based models have been used to study earthmoving productivity [10], masonry productivity [11,12] and pile construction productivity [13]. Examples of employing expert systems for productivity modeling include the system developed by Fayek and Oduba [14] as well as El- Rayes and Mosehli [15]. Such techniques as the artificial neural network have also been involved [13,16,17]. Choy and Ruwanpura [18] applied situation-based simulation models for predicting construction productivity. Hanna et al. [19] applied stepwise regression model to estimate the impact of changes on labor productivity in mechanical projects. Graham and Smith [20] gathered past productivity data regarding concrete supply and onsite delivery to create a predictive model by applying case-based reasoning (CBR) principles. Huang et al. [21] used the CYCLONE modeling methodology to estimate the productivity of formwork operations. Despite the development of a considerable number of models, many of them reveal certain drawbacks which hinder the correct assessment of labour productivity under particular conditions. The models are usually developed and verified for the selected scope of construction works. Moreover, they include only a few selected factors aecting the productivity level. Also, the complicated mathematical methods used in a number of models often discourage potential users in applying the models in practice. Another issue that contributes to the complexity of productivity estimation is the existence of numerous productivity-influencing factors. Productivity rates can fluctuate considerably due to the influence of these factors. Over the years, there has been a significant shift towards a study of working time and productivity of workers. Ergonomics and interruptions at work were the key areas of workplace organization science. Over time, issues such as the importance of employee wages began to be noticed. Contemporary research on working time in construction tends to pay increasing attention to areas not directly related to professional activity. Many studies conducted around the world have concentrated on the development of a model of rest time [22]. The results show the positive impact of adequate time spent at home on the eciency of the work of construction workers. Excessive time spent with family, as well as a dearth of it, results in reduced productivity. Very similar conclusions can be drawn from the Australian work-life-balance (WLB) model, which aims to balance the time spent working with the private life of construction workers [23]. Another approach analyzing the impact of absenteeism on performance is presented by the model of Ahn et al. [24] who take into account the social problems of workers. Buildings 2019, 9, 240 3 of 14 Weather conditions have a huge impact on construction activities. Many studies have modelled the influence of temperature and air humidity, as well as that of extreme weather conditions, on the productivity of construction workers [25,26]. Among the factors related to the psychophysical condition of employees, those related to their state of health are considered important [27]. Another aspect is the proper replenishment of bodily energy, as well as the regeneration of strength during physical work in the construction industry [28]. It turns out that the appropriate length of rest time increases the performance of the workforce. Researchers in South Africa have determined the importance of stress on performance [29]. Unsurprisingly, the results show that stress negatively aects work productivity; thus, this study focused on determining the specific values of the impact. Workplaces should also provide acoustic comfort, because high noise levels are tiring and can, in addition, cause hearing loss, which leads to reduced productivity. Supervision of the construction site also depends on the length of the work shift [30]. Performance can be increased by setting the appropriate wage, as well as by providing bonuses and rewards. According to research [31], financial consideration plays the biggest role in motivating employees to increase performance. The day of the week is not without significance for the eect on productivity as it was found there is a dip in the productivity of constructions on Mondays, Fridays, and Saturdays [30]. Previous research presents various classifications of factors influencing the labour productivity of construction workers [32,33]. However, these studies do not take into account a large number of factors aecting the working time of construction workers and are primarily limited to factors involved in performance-related scheduling [34–37]. 3. Materials and Methods 3.1. Factors Aecting Labour Productivity To construct a model to measure the productivity of construction workers, on the basis of an analysis of the literature, 17 factors were selected and categorized into five groups (Table 1). These factors are most often cited in the literature [5,16,22,23,25,26,28] as having a fundamental impact on the productivity of construction workers. They are also characterized by universality, i.e., they have an impact in all types of construction work and are not characteristic only for a selected group of works. The main reason for choosing these factors was the possibility to examine them in the current research. Table 1. Classification of the factors aecting labour productivity. Factor Group Factors Study worker ’s absence Hsie (2009) [22]; Ahn et al. (2013) [24] Time spent outside work time spent with the family (WLB) Townsend (2012) [23] air temperature Moselhi and Khan (2012) [5]; Lee et al. wind Weather conditions (2009) [25]; Zhao et al. (2009) [26] precipitation stress Bowen et al. (2013) [29] fatigue Bowen et al. (2013) [29] Psychophysical conditions health Helmer (1996) [27] age Helmer (1996) [27] recovery Chan et al. (2012) [28] ergonomics noise Organization and Malara (2014) [30]; Plebankiewicz et al. duration of work shift management of the worker (2015) [31] salary organization of work and workstations day of the week Remaining factors adaptation to new operating conditions Malara (2014) [30] or a new technology Buildings 2019, 9, 240 4 of 14 When analysing the factors in Table 1, it should be noted that some of them belong to the group of “Human Resources” (time spent outside work, psychophysical conditions), while the others belong to the group which can be called “Project Condition”. As a result, all these factors can be used to determine only the productivity of an individual worker. When determining the productivity of the entire team, factors from the “human resource” group cannot be considered. The factor to which attention should be paid and which was not included in Table 1 is experience. This issue is exceedingly complex, because it includes many so-called soft skills that are acquired with age and life experience. This means that the factor “employee’s age” also includes aspects related to experience, and therefore it has not been subjected to a separate analysis in this work. 3.2. Parameterization of the Factors One of the problems in constructing a mathematical model depicting the dependence of the productivity of construction workers on various factors is the number and variety of units by which these factors can be determined. Having reviewed solutions for similar mathematical depictions, fuzzy set theory proved the most eective, as it is a frequently used tool in these types of problems [38,39]. Fuzzy sets eectively allow one to change the values of variables with dierent units into numerical parameters belonging to the range <0, 1>. Taking into account the descriptions of the factors available in the literature, membership functions were proposed for each of them. Each of the factors was analyzed separately and the eect was to develop a membership function, which in the near way reflects its impact on productivity. The method of analyzing individual factors can be found in [30]. To illustrate the course of the analysis, this paper presents its details regarding only one factor, which is the age of the worker. Studies [40,41] prove that the best working age is 26–27 years due to the optimal physical conditions (biologically the best age). However, one cannot approach this data uncritically and treat this age as the most conducive to achieving the highest productivity. The same research also shows that, in the European Union, the employment of 26-year-olds is at a similar level as 45-year-olds and in this age frame is permanent. It is only over 45 years of age that employers are reluctant to hire workers due to their lower productivity. It should be noted that there exists a large amount of help from the European Union countries in the activation of employees in the pre-retirement age. In individual countries (including Poland), the costs of hiring older employees are reduced, and there is the possibility of subsidies and reimbursement of training costs for these employees. However, according to employers, this does not compensate for the declining productivity of workers. The range of 45–55 years is assumed as the age of a strong decrease in employee productivity. After reaching the upper value of the range, no clear decreases in physical activity until the employee reaches retirement age are observed. The relatively constant productivity of worker aged 26–45 depends on the gradual replacement of physical strength by experience. In the case of manual work conducted by construction workers, the accepted limit terminating optimal performance at the age of 45 is justified. The above analysis concerns manual workers, because in the case of administrative or mental tasks lower physical fitness does not play such a significant role. The above description of the worker ’s age factor is best illustrated by the trapezoidal function of belonging to the high productivity sets (Figure 1), with the values of characteristic parameters: a = 16 years of age (the lower limit of employability of workers allowed by the Polish law), b = 26 years, c = 45 years and d = 55 years. Thus, the full formula of the membership function for the factor takes the form of Equation (1). 0 dla x 16 and x 55 > x 16 f or 16 < x < 26 (x) = (1) 55 x f or 45 < x < 55 1 f or 16 x 45 Figure 1 depicts its graphic interpretation. Buildings 2019, 9, x FOR PEER REVIEW 5 of 14 45 years and d = 55 years. Thus, the full formula of the membership function for the factor takes the form of Equation (1). 0 𝑑𝑙𝑎 𝑥 ≤ 16 𝑖 𝑥 ≥ 55 𝑥 − 16 𝑑𝑙𝑎 16 < 𝑥 < 26 ( ) μ x = (1) 55 − 𝑥 𝑑𝑙𝑎 45 < 𝑥 < 55 1 𝑑𝑙𝑎 16 ≤ 𝑥 ≤ 45 Buildings 2019, 9, 240 5 of 14 Figure 1 depicts its graphic interpretation. 0.8 0.6 0.4 0.2 0 16 26 45 55 70 Figure 1. Graphic interpretation of the fuzzy value of the membership function to the high productivity Figure 1. Graphic interpretation of the fuzzy value of the membership function to the high sets for the worker ’s age factor. productivity sets for the worker’s age factor. The membership functions of the following factors are captured as linguistic values: ergonomics • The membership functions of the following factors are captured as linguistic values: ergonomics of equipment and tools; wage; organization of work and work stations; stress; fatigue of the of equipment and tools; wage; organization of work and work stations; stress; fatigue of the employee; and health. The membership function is: employee; and health. The membership function is: Very good (0.8; 0.9; 1.0; 1.0); Very good (0.8; 0.9; 1.0; 1.0); Good (0.6; 0.7; 0.8; 0.9) Good (0.6; 0.7; 0.8; 0.9) Average (0.3; 0.4; 0.6; 0.7); Average (0.3; 0.4; 0.6; 0.7); Weak (0.1; 0.2; 0.3; 0.4) Weak (0.1; 0.2; 0.3; 0.4) Bad (0.0; 0.0; 0.1; 0.2) Bad (0.0; 0.0; 0.1; 0.2) For the factor: noise, the membership function is described in Equation (2). • For the factor: noise, the membership function is described in Equation 2. 1 f or x 52dB 1 for x 52dB 85dB x (x) = f or 52dB < x < 85dB (2) 85 > dB 33− dBx (x) = for52dB x 85dB A (2) 0 f or x 85dB 33dB 0 for x 85dB where dB stands for decibels. For the factor: duration of work shift, the membership function is described in Equation (3). where dB stands for decibels. • For the factor: duration of work shift, the membership function is described in Equation 3. 0 f or x 6h and x 12h > x 6h f or 6h < x < 7.5h 0 for x 6hi x 12h 1.5h (x) = > (3) > 12h x > f or 9h < x < 12h >x− 6h 3h > for 6h x 7,5h 1 f or 7.5h x 9h 1,5h (x) = (3) 12h− x for9h x 12h where h is hours worked. 3h For the factor: regeneration of strength, the membership function is described in Equation (4). 1 for 7,5h x 9h where h is hours worked. > 0 f or T 6% and T 30% f o/T f o/T > T 6% f o/T • For the factor: regeneration of strength, the membership function is described in Equation (4). f or 6% < T < 14% f o/T 8% (T ) = (4) A f o/T 30% T f o/T > f or 20% < T < 30% f o/T 1 f or 14% T 20% f o/T f o where: T is time available; T is time to rest; and T = 100% fo f o/T For the factor: precipitation, the membership function is described in Equation (5). 1 f or x = 0mm 10 x (x) = f or 0mm < x < 10mm (5) > 10 0 f or 10mm x Buildings 2019, 9, 240 6 of 14 For the factor: wind, the membership function is described in Equation (6). > 1 f or x = 0m/s 10 x (x) = > f or 0m/s < x < 10m/s (6) > 10 0 f or 10m/s x For the factor: air temperature, the membership function is described in Equation (7). 0 f or x 4 C x 4 C > f or 4 C < x < 16 C 12 C (x) = 1 f or x = 16 C (7) > 28 C x f or 16 C < x < 28 C > 12 C 0 f or 28 C x For the factor ‘worker ’s absence,’ the membership function is described in Equation (8). > 0 f or x = 0r d (x) = f or 1r d < x < 5r d (8) > 5 1 f or x 5r d where: r d represents workdays. For the factor: adaptation to new working conditions, the membership function is described in Equation (9). > 0 f or x = 1r d x 1 (x) = > f or 2r d x 15r d (9) > 15 1 f or x 16r d The shape of the membership function is presented in Figure 2. Buildings 2019, 9, x FOR PEER REVIEW 7 of 14 (a) (b) (c) (d) (e) (f) (g) (h) (i) Figure 2. Shapes of the membership functions for factors: (a) with the membership functions Figure 2. Shapes of the membership functions for factors: (a) with the membership functions described described as linguistic values; (b) noise; (c) duration of the work shift; (d) regeneration of strength; as linguistic values; (b) noise; (c) duration of the work shift; (d) regeneration of strength; (e) precipitation; (e) precipitation; (f) wind; (g) air temperature; (h) worker’s absence; (i) adaptation to new working (f) wind; (g) air temperature; (h) worker ’s absence; (i) adaptation to new working conditions. conditions. • For the factor ‘time spent with family,’ the membership function is described in Equation (10). 1 for x 5r− d / week (x) = (10) A 0 for x 6r− d / week • For the factor ‘day of the week,’ the membership function is described in Equation (11). 0,38 for x ="Monday" 0,87 for x ="Tuesday" 1 for x ="Wednesday" (x) = (11) A 0,88 for x ="Thursday" 0,84 for x ="Friday" 0 for x ="Saturday" More on the characterization of the factors and the justification of their proposed membership functions can be found in [30,31]. 3.3. Impact of Identified Factors on Work Productivity of Construction Workers The next step in the study was to determine the impact of the identified factors on worker productivity. The results of the survey were used to determine this. The survey covered a total of 142 respondents, comprising both supervisors (66 people) and construction workers (76 people). A survey for supervisory staff was available on the website of the Institute of Construction Management of the Faculty of Civil Engineering, Cracow University of Technology from April 16, 2014, to June 30, 2014. The largest group of respondents included construction engineers, craftsmen, and masters, while the smallest group involved contract managers, directors, board members, and construction company owners. Most of the subjects had worked in their current positions for 3–6 years, but it is difficult to indicate their employment timespan clearly. The greatest number of Buildings 2019, 9, 240 7 of 14 For the factor ‘time spent with family,’ the membership function is described in Equation (10). 1 f or x 5r d/week (x) = (10) 0 f or x 6r d/week For the factor ‘day of the week,’ the membership function is described in Equation (11). 0.38 f or x = “Monday” 0.87 f or x = “Tuesday” 1 f or x = “Wednesday” (x) = (11) 0.88 f or x = “Thursday” > 0.84 f or x = “Friday” 0 f or x = “Saturday” More on the characterization of the factors and the justification of their proposed membership functions can be found in [30,31]. 3.3. Impact of Identified Factors on Work Productivity of Construction Workers The next step in the study was to determine the impact of the identified factors on worker productivity. The results of the survey were used to determine this. The survey covered a total of 142 respondents, comprising both supervisors (66 people) and construction workers (76 people). A survey for supervisory sta was available on the website of the Institute of Construction Management of the Faculty of Civil Engineering, Cracow University of Technology from April 16, 2014, to June 30, 2014. The largest group of respondents included construction engineers, craftsmen, and masters, while the smallest group involved contract managers, directors, board members, and construction company owners. Most of the subjects had worked in their current positions for 3–6 years, but it is dicult to indicate their employment timespan clearly. The greatest number of respondents worked in companies employing 10–249 workers; however, when workers for subcontracting companies were included, the dominant group was the one with 100–499 people. The most represented groups were small and medium-sized companies. As part of the follow-up survey, surveys were also conducted among construction workers; 76 anonymous paper-based questionnaires were collected. The research was conducted in the second half of 2014. The workers, who were employed at several construction sites in Cracow, worked as specialists in a variety of tasks, ranging from earthworks to finishing. The largest group was specialists, which included carpenters, reinforcers, and bricklayers. The respondents had typically worked in their positions for 3–6 years. Most of them declared a work experience of 3–7 years in the construction sector. By determining the average number of the employed workers in the company, excluding subcontractors, the largest group was one with up to nine employees. If subcontractors were included, most responses had a range from 20 to 99 employees. In the survey, the respondents evaluated the degree of influence of each of 15 factors on a 1–5 scale. Ratings are assigned numeric values by the following key: 1—insignificant factor; 2—factor of small significance; 3—factor of average significance; 4—significant factor; and 5—strongly significant factor. After aggregating all the surveys, it was found that for none of the factors was the mean score of the responses less than three, indicating the generally average significance of the factors; therefore, the respondents confirmed that all the factors included in the survey had influence on construction workers’ productivity. The results are presented in Table 2. Buildings 2019, 9, 240 8 of 14 Table 2. Assigning average survey values to the factors identified. Factor Number Factor Name Average Value c Ergonomics 4.01 c Noise 3.65 c Duration of work shift 3.20 c Salary 4.51 c Organization of the workstations 4.17 c Stress 3.38 c Fatigue 4.18 c Health 4.27 c Age of the worker 3.83 c Recovery of strength 3.09 c Precipitation 3.49 c Air temperature 3.49 c Wind 3.49 c Time spent with the family 3.16 c Worker ’s absence 3.16 c Day of the week 3.65 c Adaptation to new operating conditions 3.73 Such an assignment becomes the basis for further inference concerning the degree of influence that individual factors have on the productivity of construction workers. As the collected survey results proved statistically significant, a basic set of degree of influence coecients was created. The analysis of responses allowed four characteristic groups to be specified. Of all the factors, the lowest mean evaluation was given to c , c , c , and c . Their values are 3 10 14 15 included in the range <3.09, ::: , 3.20>. Due to the small dierences between the means for these factors, they were categorized into one group: those with the lowest influence on the construction workers’ productivity. The next group included the factors c , c , c , c , c , c , c , and c , whose 2 6 9 11 12 13 16 17 means fit the range <3.38, ::: , 3.83>. This group comprises factors described as having an average influence on the productivity of construction workers. Yet another group was based on mean values of responses in the range <4.01, ::: , 4.27>, and included the factors c , c , c , and c . These were called 1 5 7 8 factors that had a large degree of influence on construction workers’ productivity. The last factor, c , was assigned to the group with a very high degree of influence on the productivity of construction workers, as the mean value of the responses was the highest. All the values were assigned on the basis of the assumptions of the Likert scale. The results of the survey were such that the set of factors having a very small degree of influence on workers’ productivity remained empty. The next step, aimed at the simplification of the work productivity model, involved the assignment of weight coecients to the particular groups. This was conducted on the basis of fuzzy set theory. The singleton sharpened form of the Likert scale was used, which allowed the assigning of values from the set <0, 0.25, 0.5, 0.75, 1> to individual groups of factors. Since there were no factors with a very small degree of influence on workers’ productivity, the subsequent analysis excluded this group. A full assignment is presented in Table 3. Buildings 2019, 9, 240 9 of 14 Table 3. The division of the degree of factor influence on individual groups. Group Name—Influence Very High (Very on Work Performance of Low Average High (Important) Important) Construction Workers c , c , c , c , 2 6 9 11 Factors assigned c , c , c , c c , c , c , c c 3 10 14 15 1 5 7 8 4 c , c , c , c 12 13 16 17 Weight coecient 0.25 0.5 0.75 1 The analysis of factors influencing construction workers revealed that four of them required a separate approach: ergonomics, air temperature, wind, and precipitation. 3.4. Formula for Determining the Productivity of Construction Workers by Considering the Influencing Factors To obtain a formula capturing the productivity of construction workers, each factor labelled c , c , 1 2 ::: , c was described using two variables. According to Table 2, each of the factors was assigned a function (c), where c2<c , c , ::: , c > and the function value of (c)2<0,1>. The other variable A 1 2 17 A was the weight coecient w, for which the values w(c)2<0.25,0.5,0.75,1> are predefined in Table 4, where c2<c , c , ::: , c >. Summing up, all the factors were described in terms of pairs of numbers, 1 2 17 which are the results of the previously specified functions and w(c). A formula for calculating the work productivity of construction workers, as defined by the Wp function in formula (12), was proposed. (c ) w(c ) A i i i=1 Wp = [( ) + 0.5] (12) w(c ) i=1 where: Wp refers to labour productivity; (c ) refers to the value of the membership function of the A i set of high productivities for the i-th factor; w(c ) refers to the value of the function of the degree of the impact of the i-th factor on labour productivity, and the y–coecient correcting the interval width of the possible occurrences of the Wp function values. In formula (12), the value of the quotient of the sum in each case is in the interval <0, ::: , 1>; hence, the necessity arises to move the center of the interval by 0.5 so that for the average quotient value, interpreted as average productivity, the result obtained is equal to 1, implying 100% productivity, or the accomplishment of the assumed standard. The exponential form of the function is related to the possibility of adjusting the width of the interval of possible results. Example intervals <z , ::: , z >, 1 2 depending on the value of the power of y, are presented in Table 4. Value z is the minimum theoretical value of the function Wp, while z is the maximum. Table 4. Examples of interval values dependent on exponent y. y 0 0.25 0.5 0.75 1 2 3 4 5 z 1 0.84 0.71 0.59 0.5 0.25 0.13 0.06 0.03 z 1 1.11 1.22 1.36 1.5 2.25 3.38 5.06 7.59 For the power exponent in the formula for Wp, accepting the value of 0 does not make sense, due to the previously known results of the value of the function. Seeking a range for y > 5 is also illogical, due to the extremely large dispersion of results; for y = 5, the theoretical possible performance at high values of (c ) can exceed 700%, which is doubtful, if not impossible. Choosing the width of A i the productivity range depends on the nature of the worker ’s activity and his or her sensitivity to the changing factors. Simple and repetitive tasks have less sensitivity to the variability of factors, while complicated and atypical tasks are less predictable. Therefore, determining the appropriate value of the exponent y is vital for obtaining reliable results. It is proposed that its value should be determined Buildings 2019, 9, 240 10 of 14 by using the standard deviation of the test sample. This assumption is based primarily on the lack of sensitivity of the model to the change of exponent y. The basic assumption is the alignment of the standard deviation of the actual results with the theoretical results. It is therefore possible to present the assumption using formula (13): = ( ) (13) w t where: —standard deviation of the actual results; —standard deviation of the theoretical results, w t y—expected exponent of formula (1). To find the expected exponent, formula (14) is used, taking the natural logarithms of the values: ln y = (14) ln The coecient y calculated by Equations (13) and (14) will result in a very good scaling of the theoretical results for empirical research but will not result in any change in the way the model operates. Thus, in the previously described Equation (12), it is possible to scale the results by adjusting the width of the range of productivity results of construction workers by changing the exponent y. The proposed formula assumes that the impact of all identified factors is taken into account. It is possible to use fewer factors, but it should be remembered that a reduction in the number of factors will result in lower accuracy of the result obtained. 3.5. Example of Formula Usage To present the way the formula operates, a single assessment of ceiling formwork was undertaken on October 14, 2015. In this example, based on measurements and observations, all 17 identified factors were analyzed. The results, together with the calculation of the values of the function (c ), A i are presented in Table 5. The data in the column “measurement result” come from observations and membership functions were determined on the basis of graphs (Figures 1 and 2). Table 5. Results of calculation of function values. Factor Symbol Factor Name Measurement Result Function (c ) Value A i c Ergonomics good 0.75 c Noise approx. 78 dB 0.2 c Duration of work shift 9 h 1 c Salary good 0.8 c Organization of the workstations good 0.8 c Stress low 0.8 c Fatigue high 0.25 c Health average 0.5 c Age of the worker approx. 42 years 1 c Recovery of strength 8% 0.28 c Precipitation N/A 1 c Air temperature 8 C 0.33 c Wind 5 m/s 0.5 c Time spent with the family 2 days 1 c Worker ’s absence 1 workday 0.2 c Day of the week Thursday 0.88 c Adaptation to new operating conditions 2nd day 0.07 17 Buildings 2019, 9, 240 11 of 14 For further calculations, coecients of the degree of influence of individual factors on productivity, that is, w(c ), were used. All the necessary values for calculating Wp were determined. The calculations proceeded as follows: 0.75 0.75 + 0.2 0.5 + 1 0.25 + ::: + 0.2 0.25 + 0.88 0.5 + 0.07 0.5 W = (15) 0.75 + 0.5 + 0.25 + ::: + 0.25 + 0.5 + 0.5 giving the final result Wp = 1.04. The standard working time retrieved from the available directories, taking into account average working conditions, is 0.769 m /w-h. Therefore, taking into account the conditions determined in Table 5, the productivity of the worker should be 0.800 m /w-h. The correctness of the mathematical model of productivity of construction workers was supported by a statistical comparative analysis between empirical and theoretical results. For this purpose, 236 measurements were made on various construction sites. The research was conducted for a dozen or so dierent works for several groups of construction works: reinforcement works (ceilings, walls), carpentry works (walls, ceilings, poles), bricklaying work, finishing works (laying of cladding of steps, filling flat surfaces, laying linings of landings and corridors, assembly of plinths). All results of empirical studies were subjected to the Shapiro-Wilk normality test in order to check the data for approximation to the normal distribution. Then, basing on the result obtained which determined the logical value of the null hypothesis about the normality of data, Spearman’s rank correlation coecient (rejected null hypothesis) or Pearson’s coecient (the null hypothesis not rejected). Correlation studies between the empirical results and the results obtained through the model operation indicate the existence of strong links between them using the base values of the coecients of factor influence on the productivity of construction workers. Of the listed works, only for one was an (at least) moderate correlation not specified. The results of statistical activities confirmed the correctness of the model’s operation. 4. Discussion In the literature we can find a considerable number of mathematical models capable of predicting productivity of construction workers. However, the models are usually developed and verified for the selected scope of construction works and include only a few selected factors aecting the productivity level. The complicated mathematical methods used in models often discourage users in applying the models in practice. The novelty of the approach proposed by the authors is rooted in taking into account various factors that have the potential to influence the productivity of construction workers. On the basis of an analysis of the literature, 17 factors having a fundamental impact on the productivity of construction workers were selected, analyzed and introduced to the model. The study has developed a formula for determining the productivity of construction workers, which can be used for a variety of construction works. The eect of the calculations is: to predict the amount of work done by the workers; to evaluate the ability to complete the task within the time limit set in advance; to indicate the factors that negatively aect the productivity for verification purposes; and to improve and enable the use of the results in establishing bonus systems and wage dierentiations. The development of the mathematical model requires more work. The present model needs more empirical tests on the construction site. Testing the model for construction of various sizes, scope and specificity of construction works will allow it to adapt to various conditions, while increasing its universality. Building a database of coecients of the degree of influence on the productivity of construction workers, depending on the type of work, is planned in future research. It will be developed on the basis of one of the existing classifications of construction tasks. Creating an application supporting personnel decision making on construction sites related to the employed construction workers is Buildings 2019, 9, 240 12 of 14 being considered, along with the possibility of using the elements of building information modeling technology to describe labor inputs. 5. Conclusions The aim of this study was to build a mathematical model of the productivity of construction workers. It does so by selecting 17 factors that influence the productivity of construction workers and categorising them into five groups. For the mathematical description of the factors, fuzzy logic was used. Each of the factors was analyzed separately and the eect was to develop a membership function, which in the near way reflects its impact on productivity. To illustrate the course of the analysis, this paper presents its details regarding only one factor, which is the age of the worker. The next step in the study was to determine the impact of the identified factors on worker productivity. The results of the survey were used to determine this. The survey covered a total of 142 respondents, comprising both supervisors (66 people) and construction workers (76 people). Such an assignment becomes the basis for further inference concerning the degree of influence that individual factors have on the productivity of construction workers. As the collected survey results proved statistically significant, a basic set of degree of influence coecients was created. The analysis of responses allowed four characteristic groups to be specified. The next step, aimed at the simplification of the work productivity model, involved the assignment of weight coecients to the particular group of factors. This was conducted on the basis of fuzzy set theory. The singleton sharpened form of the Likert scale was used, which allowed the assigning of values from the set <0, 0.25, 0.5, 0.75, 1> to individual groups of factors. Since there were no factors with a very small degree of influence on workers’ productivity, the subsequent analysis excluded this group. A formula for calculating the work productivity of construction workers is proposed. Verification of the model confirmed its capability of analyzing, evaluating, and predicting the productivity of construction workers with satisfying accuracy. Author Contributions: The individual contribution and responsibilities of the authors were as follows: J.M.: conceptualization, methodology, data curation; E.P.: conceptualization, literature review, writing—original draft preparation, writing—review and editing; M.J.: formal analysis, investigation, writing—review and editing. Funding: This research received no external funding. Conflicts of Interest: The authors declare no conflict of interest. References 1. Juszczyk, M.; Lesniak, ´ A.; Zima, K. ANN based approach for estimation of construction costs of sports fields. Complexity 2018, 2018, 11. [CrossRef] 2. Lesniak, ´ A.; Juszczyk, M.; Piskorz, G. Modelling delays in bridge construction projects based on the logit and probit regression. Arch. Civ. Eng. 2019, 65, 107–120. [CrossRef] 3. Hoła, B.; Nowobilski, T. Analysis of the influence of socio-economic factors on occupational safety in the construction industry. Sustainability 2019, 11, 4469. [CrossRef] 4. Halligan, D.W.; Demsetz, L.A.; Brown, J.D.; Pace, C.B. Action-response model and loss of productivity in construction. J. Constr. Eng. Manag. 1994, 120, 47–64. [CrossRef] 5. Moselhi, O.; Khan, Z. Significance ranking of parameters impacting construction labor productivity. Constr. Innov. 2012, 12, 272–296. [CrossRef] 6. Hwang, B.; Soh, C.K. Trade-level productivity measurement: Critical challenges and solutions. J. Constr. Eng. Manag. 2013, 139, 04013013. [CrossRef] 7. Yi, W.; Chan, A.P.C. Critical review of labor productivity research in construction journals. J. Manag. Eng. 2014, 30, 214–225. [CrossRef] 8. Nguyen, H.T.; Nguyen, L.D. Relationship between building floor and construction labor productivity. Eng. Constr. Arch. Manag. 2013, 20, 563–575. [CrossRef] 9. Panas, A.; Pantouvakis, J.P. Evaluating Research Methodology in Construction. Built Hum. Environ. Rev. 2010, 3, 63–85. Buildings 2019, 9, 240 13 of 14 10. Smith, S.D. Earthmoving productivity estimation using linear regression techniques. J. Constr. Eng. Manag. 1999, 125, 133–141. [CrossRef] 11. Sander, S.R.; Thomas, H.R. Masonry productivity forecasting model. J. Constr. Eng. Manag. 1993, 119, 163–179. [CrossRef] 12. Thomas, H.R.; Sakarcan, A.S. Forecasting labor productivity using the factor model. J. Constr. Eng. Manag. 1994, 120, 228–239. [CrossRef] 13. Zayed, T.M.; Halpin, D.W. Pile Construction Productivity Assessment. J. Constr. Eng. Manag. 2005, 131, 705–714. [CrossRef] 14. Fayek, A.R.; Oduba, A. Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. J. Constr. Eng. Manag. 2005, 131, 938–941. [CrossRef] 15. El-Rayes, K.; Moselhi, O. Impact of Rainfall on the Productivity of Highway Construction. J. Constr. Eng. Manag. 2001, 127, 125–131. [CrossRef] 16. Song, L.; AbouRizk, S.M. Measuring and Modeling Labor Productivity Using Historical Data. J. Constr. Eng. Manag. 2008, 134, 786–794. [CrossRef] 17. Portas, J.; AbouRizk, S.M. Neural network model for estimating construction productivity. J. Constr. Eng. Manag. 1997, 123, 399–410. [CrossRef] 18. Choy, E.; Ruwanpura, J.Y. Situation Based Modeling for Construction Productivity. Can. J. Civil. Eng. 2006, 33, 1585–1600. [CrossRef] 19. Hanna, A.S.; Peterson, P.; Lee, M.J. Benchmarking productivity indicators for electrical/mechanical projects. J. Constr. Eng. Manag. 2002, 128, 331–337. [CrossRef] 20. Graham, D.; Smith, S.D. Estimating the productivity of cyclic construction operations using case-based reasoning. Adv. Eng. Inform. 2004, 18, 17–28. [CrossRef] 21. Huang, R.; Chen, J.; Sun, K. Planning gang formwork operations for building construction using simulations. Automat. Constr. 2004, 13, 765–779. [CrossRef] 22. Hsie, M. A model used in creating a work-rest schedule for labores. Automat. Constr. 2009, 18, 762–769. [CrossRef] 23. Townsend, K.; Lingard, H.; Bradley, L.; Brown, K. Complicated working time arrangements: Construction industry case study. J. Constr. Eng. Manag. 2012, 138, 443–448. [CrossRef] 24. Ahn, S.; Lee, S.; Steel, R.P. Eects of workers social learning: Focusing on absence behaviour. J. Constr. Eng. Manag. 2013, 139, 1015–1025. [CrossRef] 25. Lee, H.S.; Shin, J.W.; Park, M.; Ryu, H.G. Probabilistic duration estimation model for high-rise structural work. J. Constr. Eng. Manag. 2009, 135, 1289–1298. [CrossRef] 26. Zhao, J.; Zhu, N.; Lu, S.L. Productivity model in hot and humid environment based on heat tolerance time analysis. Build. Environ. 2009, 44, 2202–2207. [CrossRef] 27. Helmer, O. Social Technology; Basic Books: New York, NY, USA, 1966. 28. Chan, A.P.C.; Wong, F.K.W.; Wong, D.R.; Lam, E.W.M.; Yi, W. Determining an optimal recovery time after exercising to exhaustion in controlled climatic environment: Application to construction works. Build. Environ. 2012, 56, 28–37. [CrossRef] 29. Bowen, P.; Edwards, P.; Lingard, H. Workplace stress experienced by construction professionals in South Africa. J. Constr. Eng. Manag. 2013, 139, 393–403. [CrossRef] 30. Malara, J. Research on working time in the construction sector. Tech. Trans. 2014, 19, 169–175. 31. Plebankiewicz, E.; Juszczyk, M.; Malara, J. Estimation of task completion times with the use of the PERT method on the example of a real construction project. Arch. Civ. Eng. 2015, 61, 51–62. [CrossRef] 32. Chen, J.; Yang, L.; Su, M. Comparison of som-based optimization and particle swarm optimization for minimizing the construction time of a secant pile wall. Automat. Constr. 2009, 18, 844–848. [CrossRef] 33. Gonzalez, V.; Alarcon, L.; Maturana, S.; Bustamante, J. Site management of work-in-process buers to enhance project performance using the reliable commitment model: Case study. J. Constr. Eng. Manag. 2011, 137, 707–715. [CrossRef] 34. Gouett, M.; Haas, C.; Goodrum, P.; Caldas, C. Activity analysis for direct-work rate improvement in construction. J. Constr. Eng. Manag. 2011, 137, 1117–1124. [CrossRef] 35. Renna, P. Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions. Int. J. Prod. Res. 2012, 2, 345–357. [CrossRef] Buildings 2019, 9, 240 14 of 14 36. Russell, M.M.; Howell, G.; Hsiang, S.M.; Liu, M. Causes of time buers in construction project task duration. J. Constr. Eng. Manag. 2014, 140, 325–336. [CrossRef] 37. Wambeke, B.W.; Hsiang, S.M.; Liu, M. Causes of variation in construction project task starting times and duration. J. Constr. Eng. Manag. 2011, 9, 663–677. [CrossRef] 38. Chao, L.C. Fuzzy logic model for determining minimum bid markup. Comput.-Aided Civ. Infrastruct. Eng. 2007, 22, 449–460. [CrossRef] 39. Tah, J.H.M.; Carr, V. A proposal for construction project risk assessment using fuzzy logic. Constr. Manag. Econom. 2000, 18, 491–500. [CrossRef] 40. Taylor, P. Employment Initiatives for an Ageing Workforce in the eu15; European Foundation for the Improvement of Living and Working Conditions: Dublin, Ireland, 2006. 41. Naegele, G.; Walker, A. A Guide to Good Practice in Age Management; European Foundation for the Improvement of Living and Working Conditions: Dublin, Ireland, 2006. © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png
Buildings
Multidisciplinary Digital Publishing Institute
http://www.deepdyve.com/lp/multidisciplinary-digital-publishing-institute/formula-for-determining-the-construction-workers-productivity-yK3fgSiYlp