Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Acoustics of a Music Venue/Bar—A Case Study

Acoustics of a Music Venue/Bar—A Case Study buildings Article , † † Ramani Ramakrishnan * and Romain Dumoulin Department of Architectural Science, Ryerson University, 350 Victoria Street, Toronto, ON M5B 2K3, Canada; dumoulin.acoustics@gmail.com * Correspondence: rramakri@ryerson.ca; Tel.: +1-416-979-5000 (ext. 6508); Fax: +1-416-979-5353 † These authors contributed equally to this work. Academic Editor: David Arditi Received: 1 February 2016; Accepted: 11 March 2016; Published: 16 March 2016 Abstract: A vacant unit, once used by a Portuguese Deli, was converted to a bar/music room in Toronto. The unit was divided into two spaces along its north-south axis. The western portion was designed as a music room that would provide a performance space from a solo artist to a Jazz combo to a small rock band. The eastern part was designed as a regular bar/dining area. The plan also called for a microbrewery unit at the back of the unit. The bar music can be loud, while the music room can be pianissimo to forte depending on the type of performance. The acoustical design aspects are critical for the music room. In addition, the acoustical separation between the two spaces is equally important. The music room/bar is currently in use. The design results are compared to actual field measurements. The results showed that the music venue performed satisfactorily. The acoustical separation between the music venue and the bar/restaurant was better than expected other than an installation deficiency of the south side sound lock doors. The background sound along the northern portion was NC-35 or less. However, the southern portion’s background sound exceeded NC-35 due to the hissing of the return air grille. The acoustical design and the performance results of the music venue-bar/restaurant are presented in this paper. Keywords: music room; bar; acoustical metrics; acoustical separation; HVAC (Heating, Ventilation and Air-Conditioning) system noise 1. Introduction The acoustics of a space is seldom considered when designing a bar or a restaurant. Even the noise intrusion from the bar into adjoining spaces is not recognized and attended to, only if there are complaints. Many small music venues do not undertake a proper acoustical study and only implement minor fixes after the fact. Acoustical consultants face myriad obstacles when requested to provide design guidelines during the initial stages of the venue planning. Cost and implementation difficulties are excuses used to thwart the acousticians. Similarly, when the small music venues face acoustical deficiencies after the facilities are constructed, the owners do not always offer a free hand to the acousticians to satisfactorily resolve the acoustical concerns. In contrast to the conventional modus operandi, two partners with strong musical background, decided to convert a defunct deli into a music room/bar-restaurant facility at a major intersection in Toronto. As musicians, they understood the seriousness of their plans from an acoustical perspective. The acousticians were given total freedom to provide proper design solutions from different aspects of acoustics such as room acoustics and noise separation. The two spaces were designed using conventional prediction schemes and implementation details were appropriately prescribed. Preliminary details and results from site measurements were presented in Ramakrishnan and Dumoulin [1]. Vigeant et al. investigated different test methods to determine the JND (Just Noticeable Difference) for the clarity metric C [2]. The current case study has evaluated the relative errors of different Buildings 2016, 6, 11; doi:10.3390/buildings6010011 www.mdpi.com/journal/buildings Buildings 2016, 6, 11 2 of 13 acoustic metrics by using the subjective limen calculations. The JND evaluation of Reference [3] is Buildings 2016, 6, 11 2 of 13 somewhat similar to the current investigation. Patania et al. investigated, through simulation, the acoustic of a music hall in a heritage building different acoustic metrics by using the subjective limen calculations. The JND evaluation of Reference [3] is somewhat similar to the current investigation. in University of Catania, Italy and provided methods to improve its acoustic quality [3]. Orlowski Patania et al. investigated, through simulation, the acoustic of a music hall in a heritage building conducted a series of measurements to evaluate the reverberation time and strength in a number of in University of Catania, Italy and provided methods to improve its acoustic quality [3]. Orlowski music rooms [4]. Nocera et al. investigated the lecture hall of steel construction and provided methods conducted a series of measurements to evaluate the reverberation time and strength in a number of to improve its acoustic quality [5]. Similar investigations were undertaken in the current study to music rooms [4]. Nocera et al. investigated the lecture hall of steel construction and provided methods provide suitable acoustical designs for the conversion of a delicatessen into a music room. to improve its acoustic quality [5]. Similar investigations were undertaken in the current study to The two facilities were constructed and became operational in early 2015. Detailed site provide suitable acoustical designs for the conversion of a delicatessen into a music room. measurements were conducted and the finished facility was remodeled using ODEON software [6]. The two facilities were constructed and became operational in early 2015. Detailed site The results of the comparisons between simulation and site measurements are presented in this paper. measurements were conducted and the finished facility was remodeled using ODEON software [6]. Detailed results of the simulation are also presented in this paper. The results of the comparisons between simulation and site measurements are presented in this paper. Detailed results of the simulation are also presented in this paper. 2. Background 2. Background The proposed, but preliminary, lay out details of the music venue/bar-restaurant, on Bloor Street, The proposed, but preliminary, lay out details of the music venue/bar-restaurant, on Bloor Street, Toronto, are shown in Figure 1. The unit was divided into two spaces along its north-south axis. Toronto, are shown in Figure 1. The unit was divided into two spaces along its north-south axis. The The western portion was designed as a music room, with an approximate volume of 230 cu.m, that western portion was designed as a music room, with an approximate volume of 230 cu.m, that would would provide a performance space for a solo artist to a Jazz combo to a small rock band. The eastern provide a performance space for a solo artist to a Jazz combo to a small rock band. The eastern part part was designed as a regular bar/dining area. The bar music can be loud, while the music room can was designed as a regular bar/dining area. The bar music can be loud, while the music room can be be pianissimo to forte depending on the type of performance. The plans also called for a microbrewery pianissimo to forte depending on the type of performance. The plans also called for a microbrewery unit at the north end of the facility. unit at the north end of the facility. [Large Window] [Sound Lock Doors] [Music-Venue] [Bar/Restaurant] [Stage] [Microbrewery] (a) (b) Figure 1. Music venue/bar layout. (a) Perspective view; (b) Plan with dimensions. Buildings 2016, 6, 11 3 of 13 Music Venue/Bar Requirements Two different types of needs were considered during the design: (a) Unreinforced concerts with acoustical instruments; and (b) music using sound reinforcement system. The main acoustical requirements were: (i) adequate loudness in every part of the room; (ii) uniform distribution of sound pressure levels; (iii) optimum reverberation for music; (iv) free from acoustical defects (such as echoes); and (v) low background noise levels and vibration. The acoustical parameters used to evaluate the quality of the venue acoustics were: reverberation time (T ); and clarity (C ). It must be noted that only the above two metrics and expected sound 30 80 level distribution were investigated for preliminary design details of the music venue. The optimum acoustical parameters for the venue according ISO standards and well known recommendations are summarized in Table 1 below [7–11]. Table 1. Optimum acoustical parameters for an empty musical space. Condition T , s C , dB dBA 30 80 Unreinforced music 0.8–1.0 >5 >80 * Reinforced music 0.6 – 90–100 Notes: dBA is the overall sound pressure level from the activity. * Preferred overall sound pressure levels for classical music. In addition, adequate acoustical separation must be provided between the bar and the music venue. The bar sound levels must be controlled with a limiter and overall sound levels in the bar-restaurant area should not exceed 85 dBA and 90 dB. It can be seen therefore that an Apparent Sound Transmission Class (ASTC) of around 50 is an adequate separation for the construction between the music venue and the bar. 3. Proposed Design The microbrewery is located along the north end of the unit. The east wall faces a side street and there is a gap along the west wall. In addition the second level of the complex has three rental apartments. And hence, it must be pointed out that the interior acoustical design is as important as the design of appropriate separation so that the noise intrusions can be kept to a minimum. Finally, the HVAC system noise levels must be adequately silenced. The details of the design are outlined in the following sections. 3.1. Interior Acoustical Design The music venue is long and narrow with a large window on the south wall. The stage area is at the north end with the musicians on an elevated platform. It will be utilized for three different events: solo musician (with and without amplification); a small group such as a jazz band (with and without amplification); and a rock band (with amplification). The three event scenarios were modeled in the acoustical software. The results showed that the solo musician might need some amplification. Jazz Band can be loud enough without amplification. The Rock band uses amplification. Since the space is narrow and long, it needs diffusers to aid in the propagation and assist in the diffusivity of the sound. Approximately 50 square metres of diffusers were to be applied in the acoustical simulations and a few diffuser options, as shown in Figure 2 below, were proposed. One of the main requirements is to install heavy valour drapes, operable, over the south window and behind the stage for two reasons: (a) to prevent echoes from the window; and (b) to add acoustical absorption to the room when sound amplification is used. Moveable absorbing curtains and a treated ceiling were recommended for the stage area in order to reduce the risks of acoustical feedback when microphones are used for sound reinforcement. Buildings 2016, 6, 11 4 of 13 Buildings 2016, 6, 11 4 of 13 Buildings 2016, 6, 11 4 of 13 (a) (b) (c) (a) (b) (c) Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; (c) Pyramidal diffuser. (c) Pyramidal diffuser. (c) Pyramidal diffuser. The location of the speakers and sub-woofers are very critical to overcome low-frequency modal The Th location e location ofof the the speakers speakers and and sub-woofers sub-woofers ar are e very very critic critical al to to ov over ercom come e low low-fr -frequ equency ency mo modal dal distribution in the music room and appropriate locations were recommended. distribution in the music room and appropriate locations were recommended. distribution in the music room and appropriate locations were recommended. Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for the bar music must include a microphone to measure the bar noise levels. the bar music must include a microphone to measure the bar noise levels. the bar music must include a microphone to measure the bar noise levels. 3.2. Acoustical Separation 3.2. Acoustical Separation 3.2. Acoustical Separation A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor mounted on rubber-in-shear mounts as shown below in Figure 3. mounted on rubber-in-shear mounts as shown below in Figure 3. mounted on rubber-in-shear mounts as shown below in Figure 3. Figure 3. Floating floor assembly details for the music venue. Figure 3. Floating floor assembly details for the music venue. Figure 3. Floating floor assembly details for the music venue. Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers of drywall (5/8′′ thick) and is on separate metal studs. The spacing between the studs was chosen to of drywall (5/8′′ thick) and is on separate metal studs. The spacing between the studs was chosen to of drywall (5/8 thick) and is on separate metal studs. The spacing between the studs was chosen fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall to fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall assemblies for the music venue: one that separates the bar and the other one is next to the exterior assemblies for the music venue: one that separates the bar and the other one is next to the exterior assemblies for the music venue: one that separates the bar and the other one is next to the exterior wall. wall. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall assembly next to the exterior wall were connected through partition supports such as sway braces. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall wall assembly next to the exterior wall were connected through partition supports such as sway braces. The ceiling of the two spaces were designed as a membrane system to provide separation assembly next to the exterior wall were connected through partition supports such as sway braces. The ceiling of the two spaces were designed as a membrane system to provide separation between the two spaces as well as to adequately separate the spaces from the apartments above. The ceiling of the two spaces were designed as a membrane system to provide separation between between the two spaces as well as to adequately separate the spaces from the apartments above. Details of typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in the two spaces as well as to adequately separate the spaces from the apartments above. Details of Details of typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in Figure 4 was not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in Figure 4 was Figure 4 was not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum board with each layer’s taping staggered from the adjacent layers and were connected to the main not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum board with board with each layer’s taping staggered from the adjacent layers and were connected to the main slab through resilient hangars. On the other hand, the celling of the bar-restaurant, due to space each layer ’s taping staggered from the adjacent layers and were connected to the main slab through slab through resilient hangars. On the other hand, the celling of the bar-restaurant, due to space limitation, consisted of a double layer gypsum board construction and were connected to the slab resilient limitation, hangars. consis On ted the of other a double hand, layer the celling gypsum ofbo the ard bar con -restaurant, struction and due wer to space e connec limitation, ted to th consisted e slab above through resilient “z” channels. of a above t double hroug layer h res gypsum ilient “boar z” channe d constr ls. uction and were connected to the slab above through resilient The music venue and the bar share two sets of doors, one near the stage of the music venue and The music venue and the bar share two sets of doors, one near the stage of the music venue and “z” channels. the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, The music venue and the bar share two sets of doors, one near the stage of the music venue and was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, and appropriate silencers were recommended so the music venue ambient sound levels were less and appropriate silencers were recommended so the music venue ambient sound levels were less was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed than NC-35 (NC is Noise Criterion Curves). than NC-35 (NC is Noise Criterion Curves). and appropriate silencers were recommended so the music venue ambient sound levels were less than NC-35 (NC is Noise Criterion Curves). Buildings 2016, 6, 11 5 of 13 Buildings 2016, 6, 11 5 of 13 Buildings 2016, 6, 11 5 of 13 A few images of the completed music room are shown in Figure 5 below. Wall design as diffusers A few images of the completed music room are shown in Figure 5 below. Wall design as diffusers and the location of the stage speakers are highlighted in Figure 5. and A thfe ew loc images ation of the of the stag com e spe pleted aker mus s are high ic room light are shown ed in Figu in Figure re 5. 5 below. Wall design as diffusers and the location of the stage speakers are highlighted in Figure 5. Figure 4. Membrane ceiling details. Figure 4. Membrane ceiling details. Figure 4. Membrane ceiling details. (a) (b) (a) (b) (c) (d) (c) (d) Figure 5. The built music room. (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and Figure (d) Musi 5. c The roob m uilt looking music nor roo th. m . (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and Figure 5. The built music room. (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and (d) Music room looking north. (d) Music room looking north. The diffusers correspond to a relaxed architectural adaptation of maximum length sequence diffu Th sers e di w ffuser ith vert s correspo ical and nd hori to zontal a rel axed wells. arc Wh hitect ile perfect ural ad ly aptation uniform of diffu maximum sion was lenot ngth nee seded, quenc th ee The diffusers correspond to a relaxed architectural adaptation of maximum length sequence diffu main sers objec with tive f vert or the ical san e d d iffusers horizontal was to wells. diffu Wh se il ea e rperfect ly lateral ly unif reflecti orm ons. diffu Th si eon loca was tion o not f nee the spe ded, ak th er es diffusers with vertical and horizontal wells. While perfectly uniform diffusion was not needed, the main objective for these diffusers was to diffuse early lateral reflections. The location of the speakers main objective for these diffusers was to diffuse early lateral reflections. The location of the speakers Buildings 2016, 6, 11 6 of 13 and sub-woofers are very critical to control the acoustic energy delivered from speakers to room modes. In order to limit the first three orders of the axial modes (for the venue’s width and height axes) to be energized, appropriate locations of the subwoofers were recommended—25% of the room width from each wall and elevated at 25% of the room height from the floor, which correspond to the null locations for the second-order standing waves. Simple room acoustic simulations were not undertaken since the main frequencies around 125 Hz were below the Schroeder cut-of frequency limit for the simulation software. Note: If one needs an accurate representation in low frequencies, FEM (Finite Element Modelling) simulation would have to be undertaken, which is beyond the scope of the current study. 4. Acoustical Modelling The final design of the room was modelled in ODEON simulation tool for comparison purposes [2]. Two scenarios were applied to generate acoustical metrics along a grid, at a height of 1.5 m, representing the audience space. The audience space of the music room consisted of two areas: (a) the audience, seated, in the northern half; and (b) the audience, standing, near the southern portion. The grid simulations were undertaken for the fully occupied room and for the empty room. In addition, four individual locations were chosen to generate the acoustical parameters for an empty room so as to provide comparison results with site measurements, to be discussed subsequently in Section 6. The results of the reverberation time from the site measurements were used to calibrate the simulation models. A large set of parameters were generated by simulation as well as calculations from impulse measurements. Detailed definitions and acceptable range of values for the acoustical parameters can be found in Barron [10] and Rossing [11]. The following parameters will be evaluated and discussed in this paper. Note: The relationship between subjective parameters and objective acoustical metrics such as T , EDT, C , and T have been dealt with in detail by a number of researchers and can be found in 60 80 s References [9–11]. And hence only their brief definition are highlighted below. 1. Reverberation Time, T —represents the amount of reverberance of the space; 2. Early Decay Time, EDT—represents the amount of reverberance of the space and is better correlated with reverberance than RT ; 3. Clarity, C —describes the degree of perception of the details of the performance; 4. Centre Time, T —describes the balance between early and late sound and hence evaluates the balance between clarity and reverberance; 5. SPL (Sound Pressure Level) Variation—describes how the sound is distributed throughout the space. The absolute values are not critical and one should look only at its variation. Finally, the echo potential is evaluated by using the methods of Dietsch and Kraak [12]. The simulations of the room requires acoustical parameters such as absorption coefficients of the interior materials. These values are obtained from the database of the simulation software as well as published materials such as those provided by Adelman-Larson et al. [13]. The scattering coefficients, in particular for wood diffuser walls and audience were obtained from Zeng et al. [14]. The above values were adjusted while calibrating the simulation models with measured data from impulse measurements (Section 5.3). A set of sample results, RT (based on T(30) averaged T(30), and SPL variation, of the simulations are presented in Figure 6 through 8. Reverberation time results for the full and empty rooms, at 500 Hz, are shown in Figure 6. The variation across the room is insignificant. The reverberation time reduced from 0.8 s for the empty room to 0.55 s for the full room. The reduced reverberation falls within the design goal set for the music room with sound amplification. The SPL variation at 500 Hz for the fully occupied and empty room scenarios are shown in Figure 7. In the case of a small group with amplification only on the stage, the SPL variations are of the order of 9 dB for the fully occupied room and 7 dB for the empty room. However, the SPL variation for the front half of the room is 3.5 dB for the full room and 2.5 dB for the empty room. The lack of Buildings 2016, 6, 11 7 of 13 Buildings 2016, 6, 11 7 of 13 uniform distribution near the back of the music room was highlighted during the initial design and it was recommended that sound amplification was to be implemented. The final plan of the music room Buildings 2016, 6, 11 7 of 13 and it was recommended that sound amplification was to be implemented. The final plan of the music included two ceiling mounted speakers, in the centre of the room and provided additional sound for room included two ceiling mounted speakers, in the centre of the room and provided additional the back portion of the room, as shown in Figure 5d. and it was recommended that sound amplification was to be implemented. The final plan of the music sound for the back portion of the room, as shown in Figure 5d. The results of average reverberation time is presented in Figure 8 below. The variation of the room included two ceiling mounted speakers, in the centre of the room and provided additional The results of average reverberation time is presented in Figure 8 below. The variation of the reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) to sound for the back portion of the room, as shown in Figure 5d. reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) 0.5 s (fully The result occupied s of ave room). rage The reverberation reduced reverberation time is present falls ed within in Figure the 8 design below goal . The set variation for the music of the to 0.5 s (fully occupied room). The reduced reverberation falls within the design goal set for the music room with sound amplification. reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) room with sound amplification. to 0.5 s (fully occupied room). The reduced reverberation falls within the design goal set for the music room with sound amplification. (a) (b) Figure 6. RT60 variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 6. RT variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Figure 6. RT60 variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Buildings 2016, 6, 11 8 of 13 Buildings 2016, 6, 11 8 of 13 (a) (b) Figure 8. Average T(30) variation for the music room. (a) Empty; (b) Fully occupied. Figure 8. Average T(30) variation for the music room. (a) Empty; (b) Fully occupied. Finally, the simulation results showed the following values, of the remaining acoustical Finally, the simulation results showed the following values, of the remaining acoustical parameters, for a fully occupied room at 500 Hz: (a) C80 ranged between 3 dB and 8 dB; (b) Ts was parameters, for a fully occupied room at 500 Hz: (a) C ranged between 3 dB and 8 dB; (b) T 80 s between 25 ms to 65 ms; and (c) EchoDietsch values were between 0.39 and 0.49. And hence, it can was between 25 ms to 65 ms; and (c) EchoDietsch values were between 0.39 and 0.49. And hence, it be concluded that the music room had been designed to provide more than satisfactory acoustical can be concluded that the music room had been designed to provide more than satisfactory acoustical conditions. Note: EchoDietsch values have to be higher than 0.9 to cause any concerns. conditions. Note: EchoDietsch values have to be higher than 0.9 to cause any concerns. 5 5. . Si Site te M Measurements easurements The music room/bar-restaurant has been in operation since the spring of 2015 and hence, it was The music room/bar-restaurant has been in operation since the spring of 2015 and hence, it was po possible ssible to to conduct conduct site site measur measurement ements. s. Th Thr ree ee sets sets of of measur measurem ements ents wer were e conducted: conducted: ( (a) a) ambient ambient measurements within the music room; (b) noise reduction between the bar-restaurant and the music measurements within the music room; (b) noise reduction between the bar-restaurant and the music room room; ; and and ( (c) c) Impulse Impulse r res esponse ponse measur measuremen ements ts within within the the music music r room oom.. Th The e rresu esults lts o of f th the e th thr ree ee measurements are described below. measurements are described below. 5.1. Acoustical Separation 5.1. Acoustical Separation The acoustical separation between the bar-restaurant and the music room was established through The acoustical separation between the bar-restaurant and the music room was established measurements. Three potential noise paths existed between the two spaces: (a) through the separating through measurements. Three potential noise paths existed between the two spaces: (a) through the walls; (b) through the double doors (two sets); and (c) through the ceiling. Three different sound separating walls; (b) through the double doors (two sets); and (c) through the ceiling. Three different sequences were played through the speaker system of the bar-restaurant: (i) 30 s of pink noise; (ii) 90 s sound sequences were played through the speaker system of the bar-restaurant: (i) 30 s of pink noise; of electronic music; and (iii) 120 s of a musical sequence. The sound sequences were played at a high (ii) 90 s of electronic music; and (iii) 120 s of a musical sequence. The sound sequences were played 90 to 95 dBA level. The sound sequences were measured at two locations inside the bar-restaurant as at a high 90 to 95 dBA level. The sound sequences were measured at two locations inside the bar- well as at two locations inside the music room. The average noise reduction levels were calculated and restaurant as well as at two locations inside the music room. The average noise reduction levels were the results are presented in Figure 9 below. calculated and the results are presented in Figure 9 below. It can be seen, from Figure 9 that between ASTC (Apparent Sound Transmission Class) 45 to ASTC It can be seen, from Figure 9 that between ASTC (Apparent Sound Transmission Class) 45 to 50 noise transmission loss has been provided by the acoustical separation. The northern portion is seen ASTC 50 noise transmission loss has been provided by the acoustical separation. The northern to have provided high transmission loss values compared to the southern portion of the separation. portion is seen to have provided high transmission loss values compared to the southern portion of Even higher transmission loss would have been obtained, if not for the following reasons. the separation. Even higher transmission loss would have been obtained, if not for the following reasons. (a) The music room is separated from the bar-restaurant by a sound lock with two solid-core wood (a) The music room is separated from the bar-restaurant by a sound lock with two solid-core wood doors. One of them is rated as an STC-47 door. The second door is a simple solid-core wood door. doors. One of them is rated as an STC-47 door. The second door is a simple solid-core wood door. The STC-47 door, of the door-set in the middle of the room, has started to warp. The bottom The STC-47 door, of the door-set in the middle of the room, has started to warp. The bottom door door seal of the second door of the same set has worn out and does not exist anymore. And Buildings 2016, 6, 11 9 of 13 seal of the second door of the same set has worn out and does not exist anymore. And hence, the Buildings 2016, 6, 11 9 of 13 leakage though the southern doors was strongly noticeable. In contrast, the northern doors were hence, the leakage though the southern doors was strongly noticeable. In contrast, the northern seen to operate satisfactorily. doors were seen to operate satisfactorily. (b) The southern portion of the music room has a large window and hence traffic noise from a major (b) The southern portion of the music room has a large window and hence traffic noise from a major street (Bloor Street) could have interfered with the measurements, in particular at low frequencies street (Bloor Street) could have interfered with the measurements, in particular at low for the longer musical and electronic sequences. frequencies for the longer musical and electronic sequences. (a) (b) Figure 9. Noise reduction between bar-restaurant and music room. (a) North side; (b) South side. Figure 9. Noise reduction between bar-restaurant and music room. (a) North side; (b) South side. The acoustical separation would have matched the design goal of ASTC 50, if the sound lock The acoustical separation would have matched the design goal of ASTC 50, if the sound lock door door along the southern portion performed as designed. Finally, the walls and the ceiling were along the southern portion performed as designed. Finally, the walls and the ceiling were observed to observed to perform as per the design. perform as per the design. 5.2. Ambient Sound 5.2. Ambient Sound The background levels were measured inside the music room at two locations and the results The background levels were measured inside the music room at two locations and the results are are shown in Figure 10 below. shown in Figure 10 below. Buildings 2016, 6, 11 10 of 13 Buildings 2016, 6, 11 10 of 13 Buildings 2016, 6, 11 10 of 13 South side South side NC 70 NC 70 NC 60 NC 60 NC 50 NC 50 NC 40 NC 40 NC 30 North side NC 30 North side NC 20 NC 20 NC 10 NC 10 63 125 250 500 1000 2000 4000 8000 63 125 250 500 1000 2000 4000 8000 OCTAVE BAND CENTRE FREQUENCY, Hz OCTAVE BAND CENTRE FREQUENCY, Hz Figure 10. HVAC system sound levels inside the music room. Figure 10. HVAC system sound levels inside the music room. Figure 10. HVAC system sound levels inside the music room. The HVAV system was designed with silencers so that the ambient sound levels inside the music The HVAV system was designed with silencers so that the ambient sound levels inside the music The HVAV system was designed with silencers so that the ambient sound levels inside the music room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that along room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that along the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the along the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was the southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was observed that the sound levels decreased substantially if the large return air grille was removed. And observed that the sound levels decreased substantially if the large return air grille was removed. observed that the sound levels decreased substantially if the large return air grille was removed. And hence, it can be seen that the flow speed across the return air grille is high as well as the current grille And hence, it can be seen that the flow speed across the return air grille is high as well as the current hence, it can be seen that the flow speed across the return air grille is high as well as the current grille needs to be replaced with a quieter grille. grille needs to be replaced with a quieter grille. needs to be replaced with a quieter grille. 5.3. Music Venue Acoustics 5.3. Music Venue Acoustics 5.3. Music Venue Acoustics The interior acoustical performance of the music room was evaluated from impulse response The interior acoustical performance of the music room was evaluated from impulse response The interior acoustical performance of the music room was evaluated from impulse response measurements. The source locations and receiver locations are identified in Figure 11 below. The red measurements. The source locations and receiver locations are identified in Figure 11 below. The red measurements. The source locations and receiver locations are identified in Figure 11 below. The red points P1 and P2 are the two speakers located on the stage ceiling (as per our original design points P1 and P2 are the two speakers located on the stage ceiling (as per our original design guidelines) points P1 and P2 are the two speakers located on the stage ceiling (as per our original design guidelines) and were used to generate sine-sweep signals. The four blue points were the receiver and were used to generate sine-sweep signals. The four blue points were the receiver locations (1.5 m guidelines) and were used to generate sine-sweep signals. The four blue points were the receiver locations (1.5 meter above the floor), where the impulse responses were measured. above the floor), where the impulse responses were measured. locations (1.5 meter above the floor), where the impulse responses were measured. Figure 11. Impulse response measurements locations of the empty music room. Figure 11. Impulse response measurements locations of the empty music room. Figure 11. Impulse response measurements locations of the empty music room. The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay Time, EDT; Reverberation Time, T(30); Centre Time, Ts; Sound Pressure Level, SPL; Clarity, C80; and Time, EDT; Reverberation Time, T(30); Centre Time, Ts; Sound Pressure Level, SPL; Clarity, C80; and OCTAVE BAND SOUND PRESSURE LEVEL, dB re 20 micro Pa OCTAVE BAND SOUND PRESSURE LEVEL, dB re 20 micro Pa Buildings 2016, 6, 11 11 of 13 The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay Time, EDT; Reverberation Time, T(30); Centre Time, T ; Sound Pressure Level, SPL; Clarity, C ; and s 80 Echo Potential, EchoDietsch are analyzed for the current case study. The various metric values at five frequency bands (250 Hz through 2000 Hz) were averaged and presented in Table 2. Table 2. Averaged acoustic response from impulse measurements. Metrics/Locations Location 1 Location 2 Location 3 Location 4 EDT, s 0.70 0.85 0.902 0.888 T(30), s 0.90 0.85 0.85 0.91 T , ms 42 60 71 70 SPL, dB 7.12 9.54 11.56 12.44 C , dB 7.2 4.4 2.98 3.46 Echo Dietsch 0.40 0.44 0.46 0.47 The averaged results of the acoustic metrics were shown in Table 2. The following observations can be gleaned from the results of Table 2. (A) EDT and T(30) variations are not significant and the values are well within the design goals; (B) EDT at Location 1 is low since it is closest to the source; (C) The centre time T , vaues are well below 100 ms; (D) The SPL variation is not too large and hence additional rear area amplification may be required. The above point was highlighted in our original design specification; (E) Clarity, C values are well above 0 dB and is acceptable; (F) Echo potential values are well below 0.9 and hence echo is not a concern. The main conclusion of the room acoustical measurements is that the music room performs satisfactorily and the original design guidelines have been satisfied adequately. 6. Comparison between Simulation and Measurements The finished music room was remodeled using a simulation software, whose results were presented in Section 4. Four receiver positions were chosen with two speaker (sound source) locations, as shown in Figure 12 and the simulation were reevaluated. Sine-seep measurements were conducted in the music room, using the same sound source-receiver location combinations. The same acoustical metrics, as that of the simulation computations, were evaluated from the measured impulse responses as discussed in Section 5.3. The accuracy rating of the chosen acoustical parameters was determined by calculating the relative errors between measurements and simulations. Details of the evaluation process of the relative error can be found in Shiokawa et al. and Vorlander [15,16]. Shiokawa et al., surveyed eleven European concert halls and determined the relative errors for six acoustical parameters [15]. Vorlander ’s study involved with the simulation and measurement of a 273 seat auditorium in Braunschweig, Germany [16]. Fourteen different programs were applied to simulate the auditorium and site measurements were conducted to evaluate eight acoustical parameters. Relative errors between simulation and measurement were evaluated. Simulations are deemed to be accurate if the relative errors are as close to “zero” as possible. Typical values found in the literature tend to be in the range between 2 and 10 [15,16]. Relative errors for the four acoustical metrics chosen in the current case study were evaluated from Equations (1) and (2) [15]. The relative errors for EDT and T(30) are calculated from Equation 1 below [15]. |AP  AP |  100 Measurement Simulated AP  SL Measurement ERROR  (1) Pts Buildings 2016, 6, 11 12 of 13 The relative errors for T , and C are calculated from Equation (2) below. s 80 ° |AP  AP | Measurement Simulated SL ERROR  (2) Pts Buildings 2016, 6, 11 12 of 13 where, AP is the measured value of the acoustical parameter; AP is the simulated Measurement Simulated where, APMeasurement is the measured value of the acoustical parameter; APSimulated is the simulated value value of the acoustical parameter; SL is the subjective limen of the acoustical parameter; and N is Pts of the acoustical parameter; SL is the subjective limen of the acoustical parameter; and NPts is the the number of measurement points. number of measurement points. The subjective limens used in the evaluation of the relative errors are listed in Table 3 below [15]. The subjective limens used in the evaluation of the relative errors are listed in Table 3 below [15]. Table 3. Subjective limens of room acoustical parameters—SL (from References [15,16]). Table 3. Subjective limens of room acoustical parameters—SL (from References [15,16]). Parameter Subjective Limen Parameter Subjective Limen EDT, s 5% EDT, s 5% T(30), s 5% T(30), s 5% T , ms 10 ms Ts, ms C , dB 1 dB 10 ms C80, dB 1 dB The results of the relative errors for the four acoustical parameters, EDT, T(30), T , and C are s 80 The results of the relative errors for the four acoustical parameters, EDT, T(30), Ts, and C80 are shown in Figure 12 below. The results are shown for five frequencies. The relative errors are well shown in Figure 12 below. The results are shown for five frequencies. The relative errors are well below 5. below 5. EDT T60 Ts C80 4.5 3.5 2.5 1.5 0.5 -0.5 250 500 1000 2000 4000 Frequency, Hz Figure 12. Relative error as a function of frequency, units of subjective limens. Figure 12. Relative error as a function of frequency, units of subjective limens. Reference [15] presented results for 500 Hz and 2000 Hz also and the relative errors were Reference [15] presented results for 500 Hz and 2000 Hz also and the relative errors were between between 1 and 6. Vorlander [16] presented results at 1000 Hz in his study and the relative errors 1 and 6. Vorlander [16] presented results at 1000 Hz in his study and the relative errors ranged between ranged between 0.5 and 6. 0.5 and 6. It is seen therefore the current study results are in the same range as those found in the literature It is seen therefore the current study results are in the same range as those found in the literature and the simulations are seen to produce realistic results that can be easily incorporated in the design and the simulations are seen to produce realistic results that can be easily incorporated in the design of of a music room. a music room. 7. Conclusions 7. Conclusions The acoustical design of a proposed bar/music venue was compared to actual field The acoustical design of a proposed bar/music venue was compared to actual field measurements. measurements. Acoustical separation between the two spaces, ambient sound in the music room and Acoustical separation between the two spaces, ambient sound in the music room and the acoustics the acoustics of the music room were evaluated through simulation and the results were also of the music room were evaluated through simulation and the results were also determined through determined through field measurements after the facilities were constructed. The results showed that the bar/music venue perform as designed, except for two deficiencies. The deficiencies were appropriately discussed in the current study. Acknowledgments: The authors would like to thank Jason Stein and Mathew Park of Burdock for giving permission to conduct field measurements as well as assisting during the site measurements. Acknowledgements are due Michelle Martinez, one of our students, in helping to prepare sketches. Relative Error Buildings 2016, 6, 11 13 of 13 field measurements after the facilities were constructed. The results showed that the bar/music venue perform as designed, except for two deficiencies. The deficiencies were appropriately discussed in the current study. Acknowledgments: The authors would like to thank Jason Stein and Mathew Park of Burdock for giving permission to conduct field measurements as well as assisting during the site measurements. Acknowledgements are due Michelle Martinez, one of our students, in helping to prepare sketches. Author Contributions: The first author, Ramani Ramakrishnan, contributed to the design specification of the project and evaluated separation details and background noise levels. The second author, Romain Dumoulin, simulated the music room acoustics, design goals and interior room details. The first author modelled the finished facility, conducted site measurements and prepared the manuscript. The second author evaluated the noise reduction data, prepared the subjective limen criteria and the process for calculating the relative errors of the simulation when compared with field data. Conflicts of Interest: The authors declare no conflict of interest. References 1. Ramakrishnan, R.; Dumoulin, R. Design of a bar/music room—A case study. In Proceedings of the Acoustics Week in Canada, Halifax, 6–9 October 2015. 2. ODEON. Simulation Software for Room Acoustics; ODEON: Lyngby, Denmark, 2013. 3. Vigeant, M.C.; Celmer, R.D.; Jasinski, C.M.; Ahearn, M.J.; Schaeffler, M.J.; Giacomoni, C.B.; Wells, A.P.; Ormsbee, C.I. The effects of different test methods on the just noticeable difference of clarity index for music. J. Acoust. Soc. Am. 2015, 138, 476–491. [CrossRef] [PubMed] 4. Patania, F.; Gagliano, A.; Galesi, A.; Nocera, F. Proposal to improve the acoustic quality of the main hall of Catania University. In Proceedings of the 16th International Congress on Sound and Vibration 2009, Krakow, Poland, 5–9 July 2009; pp. 1039–1047. 5. Orlowski, R. Sound strength and reverberation time in performance and rehearsal spaces for music. In Proceedings of the 2014 Forum Acusticum, Krakow, Poland, 7–12 September 2014. 6. Nocera, F.; Gagliano, A.; Evola, G.; Gioia, M.C. Acoustic quality of a tensile membrane structure used as a lecture hall, and proposals for its improvement. Build Acoust. 2014, 21, 287–304. 7. ISO 3382–1 Acoustics—Measurement of Room Acoustic Parameters—Part 1: Performance Spaces; International Standards Organization: Geneva, Switzerland, 2009. 8. ISO 3382–2 Acoustics—Measurement of Room Acoustic Parameters—Part 2: Reverberation Time in Ordinary Rooms; International Standards Organization: Geneva, Switzerland, 2008. 9. Beranek, L.L. Concert Halls and Opera Houses—How they Sound; Acoustical Society of America: New York, NY, USA, 1996. 10. Barron, M. Auditorium Acoustics and Architectural Design; Spon Press: London, UK, 2010. 11. Rossing, T.D. Acoustics in halls for music and Speech. In Springer Handbook of Acoustics; Springer: Berlin, Germany, 2007. 12. Dietsch, L.; Kraak, W. Ein Objectives Kriterium zur Erfassung von Echostrorungen bei Musik und Sprachdarbeitungen. Acoustica 1986, 60, 205–216. (In German) 13. Adelman-Larson, N.W.; Thompson, E.R.; Gade, A.C. Acoustics in rock and pop music halls. In Proceedings of the 122nd Convention of the Audio Engineering Society, Vienna, Austria, 5–8 May 2007. 14. Zeng, W.; Christensen, C.L.; Rindel, J.H. Practical methods to define scattering coefficients in a room acoustics computer model. Appl. Acoust. 2006, 67, 771–786. [CrossRef] 15. Shiokawa, H.; Rindel, J.H. Comparison between Computer Simulations of Room Acoustical Parameters and Those Measured in Concert Hall; Report #89 of the Research Institute of Industrial Technology: Nihon University, Japan, 2007. 16. Vorlander, M. International round robin on room acoustical computer simulations. In Proceedings of the 15th International Congress on Acoustics, Trondheim, Norway, 26–30 June 1995. © 2016 by the authors; licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons by Attribution (CC-BY) license (http://creativecommons.org/licenses/by/4.0/). http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Buildings Multidisciplinary Digital Publishing Institute

Acoustics of a Music Venue/Bar—A Case Study

Buildings , Volume 6 (1) – Mar 16, 2016

Loading next page...
 
/lp/multidisciplinary-digital-publishing-institute/acoustics-of-a-music-venue-bar-a-case-study-huNEcAIgly
Publisher
Multidisciplinary Digital Publishing Institute
Copyright
© 1996-2019 MDPI (Basel, Switzerland) unless otherwise stated
ISSN
2075-5309
DOI
10.3390/buildings6010011
Publisher site
See Article on Publisher Site

Abstract

buildings Article , † † Ramani Ramakrishnan * and Romain Dumoulin Department of Architectural Science, Ryerson University, 350 Victoria Street, Toronto, ON M5B 2K3, Canada; dumoulin.acoustics@gmail.com * Correspondence: rramakri@ryerson.ca; Tel.: +1-416-979-5000 (ext. 6508); Fax: +1-416-979-5353 † These authors contributed equally to this work. Academic Editor: David Arditi Received: 1 February 2016; Accepted: 11 March 2016; Published: 16 March 2016 Abstract: A vacant unit, once used by a Portuguese Deli, was converted to a bar/music room in Toronto. The unit was divided into two spaces along its north-south axis. The western portion was designed as a music room that would provide a performance space from a solo artist to a Jazz combo to a small rock band. The eastern part was designed as a regular bar/dining area. The plan also called for a microbrewery unit at the back of the unit. The bar music can be loud, while the music room can be pianissimo to forte depending on the type of performance. The acoustical design aspects are critical for the music room. In addition, the acoustical separation between the two spaces is equally important. The music room/bar is currently in use. The design results are compared to actual field measurements. The results showed that the music venue performed satisfactorily. The acoustical separation between the music venue and the bar/restaurant was better than expected other than an installation deficiency of the south side sound lock doors. The background sound along the northern portion was NC-35 or less. However, the southern portion’s background sound exceeded NC-35 due to the hissing of the return air grille. The acoustical design and the performance results of the music venue-bar/restaurant are presented in this paper. Keywords: music room; bar; acoustical metrics; acoustical separation; HVAC (Heating, Ventilation and Air-Conditioning) system noise 1. Introduction The acoustics of a space is seldom considered when designing a bar or a restaurant. Even the noise intrusion from the bar into adjoining spaces is not recognized and attended to, only if there are complaints. Many small music venues do not undertake a proper acoustical study and only implement minor fixes after the fact. Acoustical consultants face myriad obstacles when requested to provide design guidelines during the initial stages of the venue planning. Cost and implementation difficulties are excuses used to thwart the acousticians. Similarly, when the small music venues face acoustical deficiencies after the facilities are constructed, the owners do not always offer a free hand to the acousticians to satisfactorily resolve the acoustical concerns. In contrast to the conventional modus operandi, two partners with strong musical background, decided to convert a defunct deli into a music room/bar-restaurant facility at a major intersection in Toronto. As musicians, they understood the seriousness of their plans from an acoustical perspective. The acousticians were given total freedom to provide proper design solutions from different aspects of acoustics such as room acoustics and noise separation. The two spaces were designed using conventional prediction schemes and implementation details were appropriately prescribed. Preliminary details and results from site measurements were presented in Ramakrishnan and Dumoulin [1]. Vigeant et al. investigated different test methods to determine the JND (Just Noticeable Difference) for the clarity metric C [2]. The current case study has evaluated the relative errors of different Buildings 2016, 6, 11; doi:10.3390/buildings6010011 www.mdpi.com/journal/buildings Buildings 2016, 6, 11 2 of 13 acoustic metrics by using the subjective limen calculations. The JND evaluation of Reference [3] is Buildings 2016, 6, 11 2 of 13 somewhat similar to the current investigation. Patania et al. investigated, through simulation, the acoustic of a music hall in a heritage building different acoustic metrics by using the subjective limen calculations. The JND evaluation of Reference [3] is somewhat similar to the current investigation. in University of Catania, Italy and provided methods to improve its acoustic quality [3]. Orlowski Patania et al. investigated, through simulation, the acoustic of a music hall in a heritage building conducted a series of measurements to evaluate the reverberation time and strength in a number of in University of Catania, Italy and provided methods to improve its acoustic quality [3]. Orlowski music rooms [4]. Nocera et al. investigated the lecture hall of steel construction and provided methods conducted a series of measurements to evaluate the reverberation time and strength in a number of to improve its acoustic quality [5]. Similar investigations were undertaken in the current study to music rooms [4]. Nocera et al. investigated the lecture hall of steel construction and provided methods provide suitable acoustical designs for the conversion of a delicatessen into a music room. to improve its acoustic quality [5]. Similar investigations were undertaken in the current study to The two facilities were constructed and became operational in early 2015. Detailed site provide suitable acoustical designs for the conversion of a delicatessen into a music room. measurements were conducted and the finished facility was remodeled using ODEON software [6]. The two facilities were constructed and became operational in early 2015. Detailed site The results of the comparisons between simulation and site measurements are presented in this paper. measurements were conducted and the finished facility was remodeled using ODEON software [6]. Detailed results of the simulation are also presented in this paper. The results of the comparisons between simulation and site measurements are presented in this paper. Detailed results of the simulation are also presented in this paper. 2. Background 2. Background The proposed, but preliminary, lay out details of the music venue/bar-restaurant, on Bloor Street, The proposed, but preliminary, lay out details of the music venue/bar-restaurant, on Bloor Street, Toronto, are shown in Figure 1. The unit was divided into two spaces along its north-south axis. Toronto, are shown in Figure 1. The unit was divided into two spaces along its north-south axis. The The western portion was designed as a music room, with an approximate volume of 230 cu.m, that western portion was designed as a music room, with an approximate volume of 230 cu.m, that would would provide a performance space for a solo artist to a Jazz combo to a small rock band. The eastern provide a performance space for a solo artist to a Jazz combo to a small rock band. The eastern part part was designed as a regular bar/dining area. The bar music can be loud, while the music room can was designed as a regular bar/dining area. The bar music can be loud, while the music room can be be pianissimo to forte depending on the type of performance. The plans also called for a microbrewery pianissimo to forte depending on the type of performance. The plans also called for a microbrewery unit at the north end of the facility. unit at the north end of the facility. [Large Window] [Sound Lock Doors] [Music-Venue] [Bar/Restaurant] [Stage] [Microbrewery] (a) (b) Figure 1. Music venue/bar layout. (a) Perspective view; (b) Plan with dimensions. Buildings 2016, 6, 11 3 of 13 Music Venue/Bar Requirements Two different types of needs were considered during the design: (a) Unreinforced concerts with acoustical instruments; and (b) music using sound reinforcement system. The main acoustical requirements were: (i) adequate loudness in every part of the room; (ii) uniform distribution of sound pressure levels; (iii) optimum reverberation for music; (iv) free from acoustical defects (such as echoes); and (v) low background noise levels and vibration. The acoustical parameters used to evaluate the quality of the venue acoustics were: reverberation time (T ); and clarity (C ). It must be noted that only the above two metrics and expected sound 30 80 level distribution were investigated for preliminary design details of the music venue. The optimum acoustical parameters for the venue according ISO standards and well known recommendations are summarized in Table 1 below [7–11]. Table 1. Optimum acoustical parameters for an empty musical space. Condition T , s C , dB dBA 30 80 Unreinforced music 0.8–1.0 >5 >80 * Reinforced music 0.6 – 90–100 Notes: dBA is the overall sound pressure level from the activity. * Preferred overall sound pressure levels for classical music. In addition, adequate acoustical separation must be provided between the bar and the music venue. The bar sound levels must be controlled with a limiter and overall sound levels in the bar-restaurant area should not exceed 85 dBA and 90 dB. It can be seen therefore that an Apparent Sound Transmission Class (ASTC) of around 50 is an adequate separation for the construction between the music venue and the bar. 3. Proposed Design The microbrewery is located along the north end of the unit. The east wall faces a side street and there is a gap along the west wall. In addition the second level of the complex has three rental apartments. And hence, it must be pointed out that the interior acoustical design is as important as the design of appropriate separation so that the noise intrusions can be kept to a minimum. Finally, the HVAC system noise levels must be adequately silenced. The details of the design are outlined in the following sections. 3.1. Interior Acoustical Design The music venue is long and narrow with a large window on the south wall. The stage area is at the north end with the musicians on an elevated platform. It will be utilized for three different events: solo musician (with and without amplification); a small group such as a jazz band (with and without amplification); and a rock band (with amplification). The three event scenarios were modeled in the acoustical software. The results showed that the solo musician might need some amplification. Jazz Band can be loud enough without amplification. The Rock band uses amplification. Since the space is narrow and long, it needs diffusers to aid in the propagation and assist in the diffusivity of the sound. Approximately 50 square metres of diffusers were to be applied in the acoustical simulations and a few diffuser options, as shown in Figure 2 below, were proposed. One of the main requirements is to install heavy valour drapes, operable, over the south window and behind the stage for two reasons: (a) to prevent echoes from the window; and (b) to add acoustical absorption to the room when sound amplification is used. Moveable absorbing curtains and a treated ceiling were recommended for the stage area in order to reduce the risks of acoustical feedback when microphones are used for sound reinforcement. Buildings 2016, 6, 11 4 of 13 Buildings 2016, 6, 11 4 of 13 Buildings 2016, 6, 11 4 of 13 (a) (b) (c) (a) (b) (c) Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; Figure 2. Diffuser design options. (a) Polycylindrical diffusers; (b) 2D random pattern diffuser; (c) Pyramidal diffuser. (c) Pyramidal diffuser. (c) Pyramidal diffuser. The location of the speakers and sub-woofers are very critical to overcome low-frequency modal The Th location e location ofof the the speakers speakers and and sub-woofers sub-woofers ar are e very very critic critical al to to ov over ercom come e low low-fr -frequ equency ency mo modal dal distribution in the music room and appropriate locations were recommended. distribution in the music room and appropriate locations were recommended. distribution in the music room and appropriate locations were recommended. Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling Finally, the speakers for the Bar music are to be hung by spring hangers from the main ceiling joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for joist and the levels are controlled to be less than 85 dBA and 90 dB (linear). The limiter to be used for the bar music must include a microphone to measure the bar noise levels. the bar music must include a microphone to measure the bar noise levels. the bar music must include a microphone to measure the bar noise levels. 3.2. Acoustical Separation 3.2. Acoustical Separation 3.2. Acoustical Separation A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor A floating floor assembly was used for the music venue. Baltic birch board, ¾” thick, was floor mounted on rubber-in-shear mounts as shown below in Figure 3. mounted on rubber-in-shear mounts as shown below in Figure 3. mounted on rubber-in-shear mounts as shown below in Figure 3. Figure 3. Floating floor assembly details for the music venue. Figure 3. Floating floor assembly details for the music venue. Figure 3. Floating floor assembly details for the music venue. Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers Two wall assemblies will separate the music venue and the bar. Each wall assembly is two layers of drywall (5/8′′ thick) and is on separate metal studs. The spacing between the studs was chosen to of drywall (5/8′′ thick) and is on separate metal studs. The spacing between the studs was chosen to of drywall (5/8 thick) and is on separate metal studs. The spacing between the studs was chosen fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall to fit the space. The air-gap between the two studs is filled with batt insulation. There are two wall assemblies for the music venue: one that separates the bar and the other one is next to the exterior assemblies for the music venue: one that separates the bar and the other one is next to the exterior assemblies for the music venue: one that separates the bar and the other one is next to the exterior wall. wall. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall assembly next to the exterior wall were connected through partition supports such as sway braces. Both the wall assemblies, including the studs were placed on the floating floor. The studs of the wall wall assembly next to the exterior wall were connected through partition supports such as sway braces. The ceiling of the two spaces were designed as a membrane system to provide separation assembly next to the exterior wall were connected through partition supports such as sway braces. The ceiling of the two spaces were designed as a membrane system to provide separation between the two spaces as well as to adequately separate the spaces from the apartments above. The ceiling of the two spaces were designed as a membrane system to provide separation between between the two spaces as well as to adequately separate the spaces from the apartments above. Details of typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in the two spaces as well as to adequately separate the spaces from the apartments above. Details of Details of typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in Figure 4 was not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum typical membrane system are shown in Figure 4 below. Note: The T-Bar system shown in Figure 4 was Figure 4 was not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum board with each layer’s taping staggered from the adjacent layers and were connected to the main not part of the current design. The music venue’s ceiling consisted of a 3-layer gypsum board with board with each layer’s taping staggered from the adjacent layers and were connected to the main slab through resilient hangars. On the other hand, the celling of the bar-restaurant, due to space each layer ’s taping staggered from the adjacent layers and were connected to the main slab through slab through resilient hangars. On the other hand, the celling of the bar-restaurant, due to space limitation, consisted of a double layer gypsum board construction and were connected to the slab resilient limitation, hangars. consis On ted the of other a double hand, layer the celling gypsum ofbo the ard bar con -restaurant, struction and due wer to space e connec limitation, ted to th consisted e slab above through resilient “z” channels. of a above t double hroug layer h res gypsum ilient “boar z” channe d constr ls. uction and were connected to the slab above through resilient The music venue and the bar share two sets of doors, one near the stage of the music venue and The music venue and the bar share two sets of doors, one near the stage of the music venue and “z” channels. the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, The music venue and the bar share two sets of doors, one near the stage of the music venue and was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed the other is near the raised portion of the music venue, as shown in Figure 1. Both doors, of each set, and appropriate silencers were recommended so the music venue ambient sound levels were less and appropriate silencers were recommended so the music venue ambient sound levels were less was solid core and one of them had an STC 47 rating. Finally, the HVAC system details were assessed than NC-35 (NC is Noise Criterion Curves). than NC-35 (NC is Noise Criterion Curves). and appropriate silencers were recommended so the music venue ambient sound levels were less than NC-35 (NC is Noise Criterion Curves). Buildings 2016, 6, 11 5 of 13 Buildings 2016, 6, 11 5 of 13 Buildings 2016, 6, 11 5 of 13 A few images of the completed music room are shown in Figure 5 below. Wall design as diffusers A few images of the completed music room are shown in Figure 5 below. Wall design as diffusers and the location of the stage speakers are highlighted in Figure 5. and A thfe ew loc images ation of the of the stag com e spe pleted aker mus s are high ic room light are shown ed in Figu in Figure re 5. 5 below. Wall design as diffusers and the location of the stage speakers are highlighted in Figure 5. Figure 4. Membrane ceiling details. Figure 4. Membrane ceiling details. Figure 4. Membrane ceiling details. (a) (b) (a) (b) (c) (d) (c) (d) Figure 5. The built music room. (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and Figure (d) Musi 5. c The roob m uilt looking music nor roo th. m . (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and Figure 5. The built music room. (a) East wall diffuser; (b) West wall diffuser; (c) Stage speakers; and (d) Music room looking north. (d) Music room looking north. The diffusers correspond to a relaxed architectural adaptation of maximum length sequence diffu Th sers e di w ffuser ith vert s correspo ical and nd hori to zontal a rel axed wells. arc Wh hitect ile perfect ural ad ly aptation uniform of diffu maximum sion was lenot ngth nee seded, quenc th ee The diffusers correspond to a relaxed architectural adaptation of maximum length sequence diffu main sers objec with tive f vert or the ical san e d d iffusers horizontal was to wells. diffu Wh se il ea e rperfect ly lateral ly unif reflecti orm ons. diffu Th si eon loca was tion o not f nee the spe ded, ak th er es diffusers with vertical and horizontal wells. While perfectly uniform diffusion was not needed, the main objective for these diffusers was to diffuse early lateral reflections. The location of the speakers main objective for these diffusers was to diffuse early lateral reflections. The location of the speakers Buildings 2016, 6, 11 6 of 13 and sub-woofers are very critical to control the acoustic energy delivered from speakers to room modes. In order to limit the first three orders of the axial modes (for the venue’s width and height axes) to be energized, appropriate locations of the subwoofers were recommended—25% of the room width from each wall and elevated at 25% of the room height from the floor, which correspond to the null locations for the second-order standing waves. Simple room acoustic simulations were not undertaken since the main frequencies around 125 Hz were below the Schroeder cut-of frequency limit for the simulation software. Note: If one needs an accurate representation in low frequencies, FEM (Finite Element Modelling) simulation would have to be undertaken, which is beyond the scope of the current study. 4. Acoustical Modelling The final design of the room was modelled in ODEON simulation tool for comparison purposes [2]. Two scenarios were applied to generate acoustical metrics along a grid, at a height of 1.5 m, representing the audience space. The audience space of the music room consisted of two areas: (a) the audience, seated, in the northern half; and (b) the audience, standing, near the southern portion. The grid simulations were undertaken for the fully occupied room and for the empty room. In addition, four individual locations were chosen to generate the acoustical parameters for an empty room so as to provide comparison results with site measurements, to be discussed subsequently in Section 6. The results of the reverberation time from the site measurements were used to calibrate the simulation models. A large set of parameters were generated by simulation as well as calculations from impulse measurements. Detailed definitions and acceptable range of values for the acoustical parameters can be found in Barron [10] and Rossing [11]. The following parameters will be evaluated and discussed in this paper. Note: The relationship between subjective parameters and objective acoustical metrics such as T , EDT, C , and T have been dealt with in detail by a number of researchers and can be found in 60 80 s References [9–11]. And hence only their brief definition are highlighted below. 1. Reverberation Time, T —represents the amount of reverberance of the space; 2. Early Decay Time, EDT—represents the amount of reverberance of the space and is better correlated with reverberance than RT ; 3. Clarity, C —describes the degree of perception of the details of the performance; 4. Centre Time, T —describes the balance between early and late sound and hence evaluates the balance between clarity and reverberance; 5. SPL (Sound Pressure Level) Variation—describes how the sound is distributed throughout the space. The absolute values are not critical and one should look only at its variation. Finally, the echo potential is evaluated by using the methods of Dietsch and Kraak [12]. The simulations of the room requires acoustical parameters such as absorption coefficients of the interior materials. These values are obtained from the database of the simulation software as well as published materials such as those provided by Adelman-Larson et al. [13]. The scattering coefficients, in particular for wood diffuser walls and audience were obtained from Zeng et al. [14]. The above values were adjusted while calibrating the simulation models with measured data from impulse measurements (Section 5.3). A set of sample results, RT (based on T(30) averaged T(30), and SPL variation, of the simulations are presented in Figure 6 through 8. Reverberation time results for the full and empty rooms, at 500 Hz, are shown in Figure 6. The variation across the room is insignificant. The reverberation time reduced from 0.8 s for the empty room to 0.55 s for the full room. The reduced reverberation falls within the design goal set for the music room with sound amplification. The SPL variation at 500 Hz for the fully occupied and empty room scenarios are shown in Figure 7. In the case of a small group with amplification only on the stage, the SPL variations are of the order of 9 dB for the fully occupied room and 7 dB for the empty room. However, the SPL variation for the front half of the room is 3.5 dB for the full room and 2.5 dB for the empty room. The lack of Buildings 2016, 6, 11 7 of 13 Buildings 2016, 6, 11 7 of 13 uniform distribution near the back of the music room was highlighted during the initial design and it was recommended that sound amplification was to be implemented. The final plan of the music room Buildings 2016, 6, 11 7 of 13 and it was recommended that sound amplification was to be implemented. The final plan of the music included two ceiling mounted speakers, in the centre of the room and provided additional sound for room included two ceiling mounted speakers, in the centre of the room and provided additional the back portion of the room, as shown in Figure 5d. and it was recommended that sound amplification was to be implemented. The final plan of the music sound for the back portion of the room, as shown in Figure 5d. The results of average reverberation time is presented in Figure 8 below. The variation of the room included two ceiling mounted speakers, in the centre of the room and provided additional The results of average reverberation time is presented in Figure 8 below. The variation of the reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) to sound for the back portion of the room, as shown in Figure 5d. reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) 0.5 s (fully The result occupied s of ave room). rage The reverberation reduced reverberation time is present falls ed within in Figure the 8 design below goal . The set variation for the music of the to 0.5 s (fully occupied room). The reduced reverberation falls within the design goal set for the music room with sound amplification. reverberation time is similar to that of 500 Hz. The averaged value reduced from 0.8 s (empty room) room with sound amplification. to 0.5 s (fully occupied room). The reduced reverberation falls within the design goal set for the music room with sound amplification. (a) (b) Figure 6. RT60 variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 6. RT variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Figure 6. RT60 variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. (a) (b) Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Figure 7. Sound Pressure Level (SPL) variation at 500 Hz for the music room. (a) Empty; (b) Fully occupied. Buildings 2016, 6, 11 8 of 13 Buildings 2016, 6, 11 8 of 13 (a) (b) Figure 8. Average T(30) variation for the music room. (a) Empty; (b) Fully occupied. Figure 8. Average T(30) variation for the music room. (a) Empty; (b) Fully occupied. Finally, the simulation results showed the following values, of the remaining acoustical Finally, the simulation results showed the following values, of the remaining acoustical parameters, for a fully occupied room at 500 Hz: (a) C80 ranged between 3 dB and 8 dB; (b) Ts was parameters, for a fully occupied room at 500 Hz: (a) C ranged between 3 dB and 8 dB; (b) T 80 s between 25 ms to 65 ms; and (c) EchoDietsch values were between 0.39 and 0.49. And hence, it can was between 25 ms to 65 ms; and (c) EchoDietsch values were between 0.39 and 0.49. And hence, it be concluded that the music room had been designed to provide more than satisfactory acoustical can be concluded that the music room had been designed to provide more than satisfactory acoustical conditions. Note: EchoDietsch values have to be higher than 0.9 to cause any concerns. conditions. Note: EchoDietsch values have to be higher than 0.9 to cause any concerns. 5 5. . Si Site te M Measurements easurements The music room/bar-restaurant has been in operation since the spring of 2015 and hence, it was The music room/bar-restaurant has been in operation since the spring of 2015 and hence, it was po possible ssible to to conduct conduct site site measur measurement ements. s. Th Thr ree ee sets sets of of measur measurem ements ents wer were e conducted: conducted: ( (a) a) ambient ambient measurements within the music room; (b) noise reduction between the bar-restaurant and the music measurements within the music room; (b) noise reduction between the bar-restaurant and the music room room; ; and and ( (c) c) Impulse Impulse r res esponse ponse measur measuremen ements ts within within the the music music r room oom.. Th The e rresu esults lts o of f th the e th thr ree ee measurements are described below. measurements are described below. 5.1. Acoustical Separation 5.1. Acoustical Separation The acoustical separation between the bar-restaurant and the music room was established through The acoustical separation between the bar-restaurant and the music room was established measurements. Three potential noise paths existed between the two spaces: (a) through the separating through measurements. Three potential noise paths existed between the two spaces: (a) through the walls; (b) through the double doors (two sets); and (c) through the ceiling. Three different sound separating walls; (b) through the double doors (two sets); and (c) through the ceiling. Three different sequences were played through the speaker system of the bar-restaurant: (i) 30 s of pink noise; (ii) 90 s sound sequences were played through the speaker system of the bar-restaurant: (i) 30 s of pink noise; of electronic music; and (iii) 120 s of a musical sequence. The sound sequences were played at a high (ii) 90 s of electronic music; and (iii) 120 s of a musical sequence. The sound sequences were played 90 to 95 dBA level. The sound sequences were measured at two locations inside the bar-restaurant as at a high 90 to 95 dBA level. The sound sequences were measured at two locations inside the bar- well as at two locations inside the music room. The average noise reduction levels were calculated and restaurant as well as at two locations inside the music room. The average noise reduction levels were the results are presented in Figure 9 below. calculated and the results are presented in Figure 9 below. It can be seen, from Figure 9 that between ASTC (Apparent Sound Transmission Class) 45 to ASTC It can be seen, from Figure 9 that between ASTC (Apparent Sound Transmission Class) 45 to 50 noise transmission loss has been provided by the acoustical separation. The northern portion is seen ASTC 50 noise transmission loss has been provided by the acoustical separation. The northern to have provided high transmission loss values compared to the southern portion of the separation. portion is seen to have provided high transmission loss values compared to the southern portion of Even higher transmission loss would have been obtained, if not for the following reasons. the separation. Even higher transmission loss would have been obtained, if not for the following reasons. (a) The music room is separated from the bar-restaurant by a sound lock with two solid-core wood (a) The music room is separated from the bar-restaurant by a sound lock with two solid-core wood doors. One of them is rated as an STC-47 door. The second door is a simple solid-core wood door. doors. One of them is rated as an STC-47 door. The second door is a simple solid-core wood door. The STC-47 door, of the door-set in the middle of the room, has started to warp. The bottom The STC-47 door, of the door-set in the middle of the room, has started to warp. The bottom door door seal of the second door of the same set has worn out and does not exist anymore. And Buildings 2016, 6, 11 9 of 13 seal of the second door of the same set has worn out and does not exist anymore. And hence, the Buildings 2016, 6, 11 9 of 13 leakage though the southern doors was strongly noticeable. In contrast, the northern doors were hence, the leakage though the southern doors was strongly noticeable. In contrast, the northern seen to operate satisfactorily. doors were seen to operate satisfactorily. (b) The southern portion of the music room has a large window and hence traffic noise from a major (b) The southern portion of the music room has a large window and hence traffic noise from a major street (Bloor Street) could have interfered with the measurements, in particular at low frequencies street (Bloor Street) could have interfered with the measurements, in particular at low for the longer musical and electronic sequences. frequencies for the longer musical and electronic sequences. (a) (b) Figure 9. Noise reduction between bar-restaurant and music room. (a) North side; (b) South side. Figure 9. Noise reduction between bar-restaurant and music room. (a) North side; (b) South side. The acoustical separation would have matched the design goal of ASTC 50, if the sound lock The acoustical separation would have matched the design goal of ASTC 50, if the sound lock door door along the southern portion performed as designed. Finally, the walls and the ceiling were along the southern portion performed as designed. Finally, the walls and the ceiling were observed to observed to perform as per the design. perform as per the design. 5.2. Ambient Sound 5.2. Ambient Sound The background levels were measured inside the music room at two locations and the results The background levels were measured inside the music room at two locations and the results are are shown in Figure 10 below. shown in Figure 10 below. Buildings 2016, 6, 11 10 of 13 Buildings 2016, 6, 11 10 of 13 Buildings 2016, 6, 11 10 of 13 South side South side NC 70 NC 70 NC 60 NC 60 NC 50 NC 50 NC 40 NC 40 NC 30 North side NC 30 North side NC 20 NC 20 NC 10 NC 10 63 125 250 500 1000 2000 4000 8000 63 125 250 500 1000 2000 4000 8000 OCTAVE BAND CENTRE FREQUENCY, Hz OCTAVE BAND CENTRE FREQUENCY, Hz Figure 10. HVAC system sound levels inside the music room. Figure 10. HVAC system sound levels inside the music room. Figure 10. HVAC system sound levels inside the music room. The HVAV system was designed with silencers so that the ambient sound levels inside the music The HVAV system was designed with silencers so that the ambient sound levels inside the music The HVAV system was designed with silencers so that the ambient sound levels inside the music room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that along room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that room will be less than NC-35 (NC: Noise Criterion Contour). The results of Figure 10 show that along the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the along the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the northern portion, near the stage, the sound levels are less than or equal to NC-35. However, the southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was the southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was southern portion, near the return air grille, has sound levels between NC-35 and NC-40. It was observed that the sound levels decreased substantially if the large return air grille was removed. And observed that the sound levels decreased substantially if the large return air grille was removed. observed that the sound levels decreased substantially if the large return air grille was removed. And hence, it can be seen that the flow speed across the return air grille is high as well as the current grille And hence, it can be seen that the flow speed across the return air grille is high as well as the current hence, it can be seen that the flow speed across the return air grille is high as well as the current grille needs to be replaced with a quieter grille. grille needs to be replaced with a quieter grille. needs to be replaced with a quieter grille. 5.3. Music Venue Acoustics 5.3. Music Venue Acoustics 5.3. Music Venue Acoustics The interior acoustical performance of the music room was evaluated from impulse response The interior acoustical performance of the music room was evaluated from impulse response The interior acoustical performance of the music room was evaluated from impulse response measurements. The source locations and receiver locations are identified in Figure 11 below. The red measurements. The source locations and receiver locations are identified in Figure 11 below. The red measurements. The source locations and receiver locations are identified in Figure 11 below. The red points P1 and P2 are the two speakers located on the stage ceiling (as per our original design points P1 and P2 are the two speakers located on the stage ceiling (as per our original design guidelines) points P1 and P2 are the two speakers located on the stage ceiling (as per our original design guidelines) and were used to generate sine-sweep signals. The four blue points were the receiver and were used to generate sine-sweep signals. The four blue points were the receiver locations (1.5 m guidelines) and were used to generate sine-sweep signals. The four blue points were the receiver locations (1.5 meter above the floor), where the impulse responses were measured. above the floor), where the impulse responses were measured. locations (1.5 meter above the floor), where the impulse responses were measured. Figure 11. Impulse response measurements locations of the empty music room. Figure 11. Impulse response measurements locations of the empty music room. Figure 11. Impulse response measurements locations of the empty music room. The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay Time, EDT; Reverberation Time, T(30); Centre Time, Ts; Sound Pressure Level, SPL; Clarity, C80; and Time, EDT; Reverberation Time, T(30); Centre Time, Ts; Sound Pressure Level, SPL; Clarity, C80; and OCTAVE BAND SOUND PRESSURE LEVEL, dB re 20 micro Pa OCTAVE BAND SOUND PRESSURE LEVEL, dB re 20 micro Pa Buildings 2016, 6, 11 11 of 13 The impulse response measurements were analyzed using the ISO 3382 Standard procedures [7,8]. The results of the evaluations are presented in Table 2 below. Six acoustical parameters—Early Decay Time, EDT; Reverberation Time, T(30); Centre Time, T ; Sound Pressure Level, SPL; Clarity, C ; and s 80 Echo Potential, EchoDietsch are analyzed for the current case study. The various metric values at five frequency bands (250 Hz through 2000 Hz) were averaged and presented in Table 2. Table 2. Averaged acoustic response from impulse measurements. Metrics/Locations Location 1 Location 2 Location 3 Location 4 EDT, s 0.70 0.85 0.902 0.888 T(30), s 0.90 0.85 0.85 0.91 T , ms 42 60 71 70 SPL, dB 7.12 9.54 11.56 12.44 C , dB 7.2 4.4 2.98 3.46 Echo Dietsch 0.40 0.44 0.46 0.47 The averaged results of the acoustic metrics were shown in Table 2. The following observations can be gleaned from the results of Table 2. (A) EDT and T(30) variations are not significant and the values are well within the design goals; (B) EDT at Location 1 is low since it is closest to the source; (C) The centre time T , vaues are well below 100 ms; (D) The SPL variation is not too large and hence additional rear area amplification may be required. The above point was highlighted in our original design specification; (E) Clarity, C values are well above 0 dB and is acceptable; (F) Echo potential values are well below 0.9 and hence echo is not a concern. The main conclusion of the room acoustical measurements is that the music room performs satisfactorily and the original design guidelines have been satisfied adequately. 6. Comparison between Simulation and Measurements The finished music room was remodeled using a simulation software, whose results were presented in Section 4. Four receiver positions were chosen with two speaker (sound source) locations, as shown in Figure 12 and the simulation were reevaluated. Sine-seep measurements were conducted in the music room, using the same sound source-receiver location combinations. The same acoustical metrics, as that of the simulation computations, were evaluated from the measured impulse responses as discussed in Section 5.3. The accuracy rating of the chosen acoustical parameters was determined by calculating the relative errors between measurements and simulations. Details of the evaluation process of the relative error can be found in Shiokawa et al. and Vorlander [15,16]. Shiokawa et al., surveyed eleven European concert halls and determined the relative errors for six acoustical parameters [15]. Vorlander ’s study involved with the simulation and measurement of a 273 seat auditorium in Braunschweig, Germany [16]. Fourteen different programs were applied to simulate the auditorium and site measurements were conducted to evaluate eight acoustical parameters. Relative errors between simulation and measurement were evaluated. Simulations are deemed to be accurate if the relative errors are as close to “zero” as possible. Typical values found in the literature tend to be in the range between 2 and 10 [15,16]. Relative errors for the four acoustical metrics chosen in the current case study were evaluated from Equations (1) and (2) [15]. The relative errors for EDT and T(30) are calculated from Equation 1 below [15]. |AP  AP |  100 Measurement Simulated AP  SL Measurement ERROR  (1) Pts Buildings 2016, 6, 11 12 of 13 The relative errors for T , and C are calculated from Equation (2) below. s 80 ° |AP  AP | Measurement Simulated SL ERROR  (2) Pts Buildings 2016, 6, 11 12 of 13 where, AP is the measured value of the acoustical parameter; AP is the simulated Measurement Simulated where, APMeasurement is the measured value of the acoustical parameter; APSimulated is the simulated value value of the acoustical parameter; SL is the subjective limen of the acoustical parameter; and N is Pts of the acoustical parameter; SL is the subjective limen of the acoustical parameter; and NPts is the the number of measurement points. number of measurement points. The subjective limens used in the evaluation of the relative errors are listed in Table 3 below [15]. The subjective limens used in the evaluation of the relative errors are listed in Table 3 below [15]. Table 3. Subjective limens of room acoustical parameters—SL (from References [15,16]). Table 3. Subjective limens of room acoustical parameters—SL (from References [15,16]). Parameter Subjective Limen Parameter Subjective Limen EDT, s 5% EDT, s 5% T(30), s 5% T(30), s 5% T , ms 10 ms Ts, ms C , dB 1 dB 10 ms C80, dB 1 dB The results of the relative errors for the four acoustical parameters, EDT, T(30), T , and C are s 80 The results of the relative errors for the four acoustical parameters, EDT, T(30), Ts, and C80 are shown in Figure 12 below. The results are shown for five frequencies. The relative errors are well shown in Figure 12 below. The results are shown for five frequencies. The relative errors are well below 5. below 5. EDT T60 Ts C80 4.5 3.5 2.5 1.5 0.5 -0.5 250 500 1000 2000 4000 Frequency, Hz Figure 12. Relative error as a function of frequency, units of subjective limens. Figure 12. Relative error as a function of frequency, units of subjective limens. Reference [15] presented results for 500 Hz and 2000 Hz also and the relative errors were Reference [15] presented results for 500 Hz and 2000 Hz also and the relative errors were between between 1 and 6. Vorlander [16] presented results at 1000 Hz in his study and the relative errors 1 and 6. Vorlander [16] presented results at 1000 Hz in his study and the relative errors ranged between ranged between 0.5 and 6. 0.5 and 6. It is seen therefore the current study results are in the same range as those found in the literature It is seen therefore the current study results are in the same range as those found in the literature and the simulations are seen to produce realistic results that can be easily incorporated in the design and the simulations are seen to produce realistic results that can be easily incorporated in the design of of a music room. a music room. 7. Conclusions 7. Conclusions The acoustical design of a proposed bar/music venue was compared to actual field The acoustical design of a proposed bar/music venue was compared to actual field measurements. measurements. Acoustical separation between the two spaces, ambient sound in the music room and Acoustical separation between the two spaces, ambient sound in the music room and the acoustics the acoustics of the music room were evaluated through simulation and the results were also of the music room were evaluated through simulation and the results were also determined through determined through field measurements after the facilities were constructed. The results showed that the bar/music venue perform as designed, except for two deficiencies. The deficiencies were appropriately discussed in the current study. Acknowledgments: The authors would like to thank Jason Stein and Mathew Park of Burdock for giving permission to conduct field measurements as well as assisting during the site measurements. Acknowledgements are due Michelle Martinez, one of our students, in helping to prepare sketches. Relative Error Buildings 2016, 6, 11 13 of 13 field measurements after the facilities were constructed. The results showed that the bar/music venue perform as designed, except for two deficiencies. The deficiencies were appropriately discussed in the current study. Acknowledgments: The authors would like to thank Jason Stein and Mathew Park of Burdock for giving permission to conduct field measurements as well as assisting during the site measurements. Acknowledgements are due Michelle Martinez, one of our students, in helping to prepare sketches. Author Contributions: The first author, Ramani Ramakrishnan, contributed to the design specification of the project and evaluated separation details and background noise levels. The second author, Romain Dumoulin, simulated the music room acoustics, design goals and interior room details. The first author modelled the finished facility, conducted site measurements and prepared the manuscript. The second author evaluated the noise reduction data, prepared the subjective limen criteria and the process for calculating the relative errors of the simulation when compared with field data. Conflicts of Interest: The authors declare no conflict of interest. References 1. Ramakrishnan, R.; Dumoulin, R. Design of a bar/music room—A case study. In Proceedings of the Acoustics Week in Canada, Halifax, 6–9 October 2015. 2. ODEON. Simulation Software for Room Acoustics; ODEON: Lyngby, Denmark, 2013. 3. Vigeant, M.C.; Celmer, R.D.; Jasinski, C.M.; Ahearn, M.J.; Schaeffler, M.J.; Giacomoni, C.B.; Wells, A.P.; Ormsbee, C.I. The effects of different test methods on the just noticeable difference of clarity index for music. J. Acoust. Soc. Am. 2015, 138, 476–491. [CrossRef] [PubMed] 4. Patania, F.; Gagliano, A.; Galesi, A.; Nocera, F. Proposal to improve the acoustic quality of the main hall of Catania University. In Proceedings of the 16th International Congress on Sound and Vibration 2009, Krakow, Poland, 5–9 July 2009; pp. 1039–1047. 5. Orlowski, R. Sound strength and reverberation time in performance and rehearsal spaces for music. In Proceedings of the 2014 Forum Acusticum, Krakow, Poland, 7–12 September 2014. 6. Nocera, F.; Gagliano, A.; Evola, G.; Gioia, M.C. Acoustic quality of a tensile membrane structure used as a lecture hall, and proposals for its improvement. Build Acoust. 2014, 21, 287–304. 7. ISO 3382–1 Acoustics—Measurement of Room Acoustic Parameters—Part 1: Performance Spaces; International Standards Organization: Geneva, Switzerland, 2009. 8. ISO 3382–2 Acoustics—Measurement of Room Acoustic Parameters—Part 2: Reverberation Time in Ordinary Rooms; International Standards Organization: Geneva, Switzerland, 2008. 9. Beranek, L.L. Concert Halls and Opera Houses—How they Sound; Acoustical Society of America: New York, NY, USA, 1996. 10. Barron, M. Auditorium Acoustics and Architectural Design; Spon Press: London, UK, 2010. 11. Rossing, T.D. Acoustics in halls for music and Speech. In Springer Handbook of Acoustics; Springer: Berlin, Germany, 2007. 12. Dietsch, L.; Kraak, W. Ein Objectives Kriterium zur Erfassung von Echostrorungen bei Musik und Sprachdarbeitungen. Acoustica 1986, 60, 205–216. (In German) 13. Adelman-Larson, N.W.; Thompson, E.R.; Gade, A.C. Acoustics in rock and pop music halls. In Proceedings of the 122nd Convention of the Audio Engineering Society, Vienna, Austria, 5–8 May 2007. 14. Zeng, W.; Christensen, C.L.; Rindel, J.H. Practical methods to define scattering coefficients in a room acoustics computer model. Appl. Acoust. 2006, 67, 771–786. [CrossRef] 15. Shiokawa, H.; Rindel, J.H. Comparison between Computer Simulations of Room Acoustical Parameters and Those Measured in Concert Hall; Report #89 of the Research Institute of Industrial Technology: Nihon University, Japan, 2007. 16. Vorlander, M. International round robin on room acoustical computer simulations. In Proceedings of the 15th International Congress on Acoustics, Trondheim, Norway, 26–30 June 1995. © 2016 by the authors; licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons by Attribution (CC-BY) license (http://creativecommons.org/licenses/by/4.0/).

Journal

BuildingsMultidisciplinary Digital Publishing Institute

Published: Mar 16, 2016

There are no references for this article.