A Roadmap for the Integration of Active Solar Systems into Buildings

A Roadmap for the Integration of Active Solar Systems into Buildings applied sciences Article A Roadmap for the Integration of Active Solar Systems into Buildings 1 , 2 1 1 Constantinos Vassiliades * , Soteris Kalogirou , Aimilios Michael and Andreas Savvides Department of Architecture, University of Cyprus, Nicosia 1678, Cyprus; aimilios@ucy.ac.cy (A.M.); als@ucy.ac.cy (A.S.) Department of Mechanical Engineering and Materials Science and Engineering, Cyprus University of Technology, Limassol 3036, Cyprus; soteris.kalogirou@cut.ac.cy * Correspondence: vassiliades.constantinos@ucy.ac.cy Received: 8 May 2019; Accepted: 11 June 2019; Published: 17 June 2019 Abstract: This paper aims to simplify the interdisciplinary design process that will be used as a design tool for the viable integration of active solar energy systems into buildings, i.e., Building-Integrated Solar Thermal Systems—BISTSs; Building-Integrated Photovoltaic Systems—BIPVSs, through the creation of a roadmap. The research also aims supplement the work of researchers who have dealt with the creation of design tools that aim to optimise a specific aspect of a building design, or their geometric forms, in order to shape energy-ecient and sustainable architectural solutions. More specifically, a prescriptive design strategy is derived from the proposed design tool. This is based on five design steps, each of which is analysed and which lead to the creation of a comprehensive design tool for siting buildings so as to optimise the integration of solar systems. The originality of this tool is based on the fact that it makes an important step in the standardisation of these studies. Keywords: design guidelines; building integration; roadmap; sustainable development; active solar systems 1. Introduction The first oil crisis in the early 1970s forced the building industry to a sudden awakening, and the development of a concentrated e ort, in order to reduce building energy needs, that focused initially on the active systems of the building, with the passive approach to the subject following in the mid-1970s [1]. It is interesting, however, that the reckless use of fossil fuels for energy production that led to the aforementioned environmental problems and oil crisis took place while Europe’s average Global Horizontal Irradiance (GHI) was about 1200 kWh/m /year [2]. Considering the above, it became clear that the use and exploitation of renewable energy sources, especially solar energy, during architectural planning is one of the most important parameters a building needs to meet in order to be considered viable. On the other hand, the direction towards solar energy may be the only viable proposition, since it is considered to be the alternative energy source with the greatest potential to reduce the dependence on fossil fuels [3–5]. At the same time, the European Union (EU)’s Climate Action and, in particular, the 20-20-20 program that is currently active, sets targets for a 20% reduction in EU greenhouse gas emissions compared to 1990 levels, for a 20% improvement in the EU’s energy eciency, and for 20% of the EU energy share to be produced from renewable sources [6]. Regarding the post-2020 era, the European Commission has already set new targets for the year 2030, which aim at a 40% reduction in the EU’s greenhouse gas emissions compared to 1990 levels, a 27% improvement in the EU’s energy eciency and for 27% of the EU’s energy share to be produced from renewable sources [7]. The Commission is also committed by 2050 to reduce its greenhouse gas emissions by 80–95% compared to 1990 Appl. Sci. 2019, 9, 2462; doi:10.3390/app9122462 www.mdpi.com/journal/applsci Appl. Sci. 2019, 9, 2462 2 of 16 levels [7]. Given that buildings are responsible for 40% of the total primary energy needs in the EU [8], the development of e ective alternative energy solutions for buildings is imperative. This is complemented by the Energy Performance of Buildings Directive (EPBD) [9], as well as by the Directive (EU) 2018/2001 of the European Parliament and of the Council on the promotion of the use of energy from renewable sources [10], which require Renewable Energy Sources (RES) to be actively promoted against the conventional fossil fuels that are used in buildings. The increasing role and incentives given to renewable energy sources through the European legal framework, and the fact that solar energy accounted for the 21.9% of the primary renewables production in 2017 in the southern EU countries [11], mean that Solar Thermal Systems (STSs) and Photovoltaics (PVs) will play a key role in buildings, as they contribute directly to their heating and cooling loads, as well as to their supply of electricity and hot water [8]. At the same time, other more specific solar systems, such as polymethylmethacrylate (PMMA) fibers [12] and heliostats for the concentration of solar energy [13], could also contribute in that respect. Thus, the integration of active solar systems into buildings is coming to the fore, since, according to Hestnes [14], buildings should be able to exploit solar energy for energy generation through the integration of active solar features. This results in an e ective contribution to the reduction of energy needs in the building sector, through onsite production of energy [8]. The key role of building-integrated solar active systems in the architectural design of buildings is increasingly becoming evident, especially in countries where high values of annual solar energy are recorded [15,16]. Based on the above, and on the fact that the European Union’s legal framework encourages member states to require the use of energy from renewable sources in new and existing buildings [9,10] in their building regulations and codes, several countries have included in their legislation an indirect obligation to integrate active solar energy systems in buildings. For example, the Regulatory Administrative Act 119/2016 [17] of Cyprus requires that at least 25% of the total primary energy that residential buildings consume should come from RES. However, the participation of building-integrated active solar systems in building design considers additional design parameters. This is because the design and construction of a sustainable, energy-ecient and environmentally friendly building essentially requires a holistic approach to design [18–21]. Specifically, the use of solar energy is one of the key components of the holistic approach to the environmental design issue, which has three prongs: bioclimatic design, the design of energy-ecient structures and the ecological approach to the design. The first two di er in their approach to the subject, since the first deals with passive issues (e.g., geometry, orientation, placements) and the second with energy issues (e.g., energy production). The third tries to deal with the minimisation of the building’s ecological footprint [22–24]. All the above demonstrate that the integration of active solar systems into buildings adds various parameters to the architectural design process, thus transforming it into an interdisciplinary field. Particularly, this is analysed with respect to issues related to bioclimatic design and the passive role that active solar systems play in the building, issues that have to do with their active role and are related to their energy production potential and issues that have to do with construction materials and their ecological sensitivity [25]. In this paper, we attempt to simplify this interdisciplinary design process through the creation of a roadmap that can be used as a design tool in the early stages of design. 2. Literature Review The subject of the integration of active solar systems into buildings and research on it is an original application, although not in its entirety. This is because the analysis of a building’s construction and the addition of a number of technological systems to it is usual in the contemporary construction industry, since a lot of di erent systems have been integrated into recent buildings. The research focus in this paper is the integration of active solar systems into buildings and their sustainable operation, since, in their majority of cases, they have not been built for this purpose and their ideal operating Appl. Sci. 2019, 9, 2462 3 of 16 conditions di er, in most cases, from the conditions under which they are called upon to perform, as functional parts of the building shell. There are already examples of applications where original design process solutions were applied to ensure that the systems would function properly. The integration of such a system in a building requires a modification of the design process in such a way that the integrated system and the building itself can operate in conjunction. The lack of a standardised roadmap for such applications forces design teams to apply their own unique design approach to ensure the system’s viability in each case. Vassiliades [26] studied and presented 43 case studies of buildings with integrated active solar systems. These applications have been extensively analysed separately as well as comparatively. The analysis considered both the buildings and the systems in terms of their type, the type of their integration, their originality, the way they were applied/integrated and the challenges faced therein. Subsequently, various construction issues were illustrated, and aspects of integration according to the demands of each case were highlighted, to present a suggested design strategy for every case. Considering the above, an investigation shows that the literature on the development of a design tool/roadmap for the integration of active solar systems into buildings is rather limited. In the framework of the aforementioned research, an early attempt was made to create a design/research roadmap, which was based on the research process that was presented in that dissertation. In particular, the investigation started at the urban scale, progressed to the scale of the building and ended with considerations relating to the construction of components making up the shell of the building. The goal was to achieve sustainable building integration by avoiding several passive and technical issues that could a ect the eciency and viability of the systems and of the building itself. Most of the related work deals with the development of design tools on similar research topics. In the solar urban design field, Lobaccaro et al. [27] and Lobaccaro and Frontini [28] have tried to create design tools that optimise the volume and shape of buildings in existing urban areas to harvest as much insolation as possible and minimise their negative impact on the adjacent lots, whilst Lobaccaro et al. [29] dealt with the estimation of the amount of energy that can be produced from solar envelopes in urban environments. Amado and Poggi [30] promote the energy transition to solar energy in the urban environment using a Geographical Urban Units Delimitation (GUUD) model related to solar potential. The methodology of this research consists of a novel design tool and proposes five steps: an analysis of the urban system, parametric urban modelling, estimation of the solar potential, a forecast of electricity consumption and the application of an urban energy balance. The workflow of the process consists of a combination of geographic information system (GIS) techniques with parametric modelling and analysis of the solar potential. In the building design field, Attia et al. [31] created a design tool that performs a sensitivity analysis of the possible variations in the design parameters and elements of nearly zero energy buildings (NZEBs) during the early design phases in hot climates, aiming to provide information on the period prior to decision-making for NZEB design. Several researchers have developed design optimisation tools that aim to address specific aspects of building design. Specifically, a number of studies [32–39] have dealt with the creation of design tools that optimise the geometric form of the building and its related components in order to shape energy-ecient and sustainable architecture solutions or to improve the values of specific parameters in the overall design of the building. Related work has also been done for the creation of design optimisation tools that address heating, ventilation and air conditioning (HVAC) system parameters and other similar active energy systems [40–42]. The work of Attia et al. [43] summarises a study undertaken to reveal potential challenges and opportunities for integrating optimisation tools in NZEB design. The development of design tools and roadmaps is a part of several research and development procedures that aim to optimise related processes in the fields of computing and software architecture [44–46]. At the same time, due to recent strategic shifts away from simply achieving feasibility to achieving optimisation [47], and the benefits obtained by facilities management companies, a process-based approach is well-recognised in the business literature [48,49], and roadmaps for Appl. Sci. 2019, 9, 2462 4 of 16 Appl. Sci. 2019, 9, x FOR PEER REVIEW 4 of 15 research and development have been created [47,48,50,51]. Roadmaps in the field of production and manufacturing manufacturing a aim im to optimise processes a to optimise processes and nd products products [ [5 52 2– –5 56 6] ].. F Finally inally,, t the he r range ange o of f r roadmaps oadmaps t that hat are currently in use is shown in the work of Alturki et al. [57], who propose a structured and detailed are currently in use is shown in the work of Alturki et al. [57], who propose a structured and detailed design design scienc science e ro roadmap admap to to conduct conduct des design ign scscience ience rer search esearch that that ma may y be be used used as a gen as a general eral guide guide for for rese rarchers. esearchers. 2.1. Prototype Systems 2.1. Prototype Systems There are also examples of research teams that have resolved the construction issues arising There are also examples of research teams that have resolved the construction issues arising from from the integration of prototype active solar systems into buildings. In this context, work was done the integration of prototype active solar systems into buildings. In this context, work was done during during COST Action TU1205—BISTS [58] by five research teams that developed five di erent solar COST Action TU1205—BISTS [58] by five research teams that developed five different solar systems, systems, the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal Thermal (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the the Trapeze Flat-Plate Solar Thermal Collectors (FPSTC), and proposed viable solutions for building Trapeze Flat-Plate Solar Thermal Collectors (FPSTC), and proposed viable solutions for building integration (Figure 1). For each system, a specialised design and fabrication solution was adopted that integration (Figure 1). For each system, a specialised design and fabrication solution was adopted focused on the sustainable operation of both the system and the building. that focused on the sustainable operation of both the system and the building. Figure 1. Visualisations of the five systems that were applied to a three-storey building. From the left: Figure 1. Visualisations of the five systems that were applied to a three-storey building. From the left: the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the Trapeze Flat-Plate Solar Thermal Collectors (FPSTC). Trapeze Flat-Plate Solar Thermal Collectors (FPSTC). 2.2. Summary of Main Points 2.2. Summary of Main Points The key findings that summarise the main points and limitations of the previous works may be The key findings that summarise the main points and limitations of the previous works may be enumerated as follows: enumerated as follows: The current research is focused on the integration of active solar systems into buildings and their • The current research is focused on the integration of active solar systems into buildings and their sustainable operation, since, in the majority of cases, they have not been built for this purpose. sustainable operation, since, in the majority of cases, they have not been built for this purpose. The lack of a standardised roadmap forces design teams to apply their own unique design • The lack of a standardised roadmap forces design teams to apply their own unique design approach for each di erent case. approach for each different case. • The The resea researrch ch tea team m m made ade an an ea early rly attempt attempt to to cr create a design/re eate a design/resear search ch ro roadmap, admap, wh which ich was was presented in previous research. presented in previous research. • There have been attempts to develop design tools for similar research topics, which aim to There have been attempts to develop design tools for similar research topics, which aim to optimise the optimise the shape and shape an geometry d ,geometry, or or to improve tothe improve t values h of e specific values of parameters specific pain ramet the overall ers in th design e overal of l design of buildings and building clusters. buildings and building clusters. • Design tools and roadmaps can also be encountered in several research and development Design tools and roadmaps can also be encountered in several research and development procedures that aim to optimise related processes in the fields of computing, production, procedures that aim to optimise related processes in the fields of computing, production, manufacturing and design science research. manufacturing and design science research. 3. Methodology 3. Methodology In order to become science, novel procedures, such as the proposed roadmap, need to be tested in In order to become science, novel procedures, such as the proposed roadmap, need to be tested real conditions, in this case with the application of the proposed methodology to case studies. Since in real conditions, in this case with the application of the proposed methodology to case studies. Since related examples and the literature on the investigation of building-integrated active solar systems are related examples and the literature on the investigation of building-integrated active solar systems are rather limited [59], in contrast to the corresponding applied methodologies, the proposed methodology was developed based on a literature analysis, and on how the design/research teams in the various case studies designed and integrated the active solar energy systems into model Appl. Sci. 2019, 9, x FOR PEER REVIEW 5 of 15 buildings. The research team chose to use these specific research case studies instead of others in the private sector because they were developed under controlled conditions with a very specific Appl. Sci. 2019, 9, 2462 5 of 16 methodological course for each case. Specifically, the methodology is an evolution of Vassiliades’s research [26] for the development of a novel roadmap. That work was initially based on the collection rather limited [59], in contrast to the corresponding applied methodologies, the proposed methodology of relevant literature and on the current state-of-the-art, as well as an analysis of the integration of was developed based on a literature analysis, and on how the design/research teams in the various case active solar systems at all design scales, including the urban scale, the building scale and the scale of studies designed and integrated the active solar energy systems into model buildings. The research the unit system. Thus, an early roadmap was developed that proposes a path that a designer may team chose to use these specific research case studies instead of others in the private sector because follow for addressing the integration of an active solar system into a building. they were developed under controlled conditions with a very specific methodological course for each In the roadmap above, five design/research steps were proposed, which constitute a design case. Specifically, the methodology is an evolution of Vassiliades’s research [26] for the development process for achieving a system’s integration (Figure 2). The first step is a passive energy analysis of of a novel roadmap. That work was initially based on the collection of relevant literature and on the the building, or the cluster of buildings, at an urban level. The aim is to identify the ideal facade or current state-of-the-art, as well as an analysis of the integration of active solar systems at all design facades within which the active system may be integrated with the least likely propagation of scales, including the urban scale, the building scale and the scale of the unit system. Thus, an early interfering shadows that could affect its performance. roadmap was developed that proposes a path that a designer may follow for addressing the integration After selecting the buildings and their related facades, the second step proposes an energy of an active solar system into a building. efficiency study of the building under construction or major renovation in order to determine its In the roadmap above, five design/research steps were proposed, which constitute a design process passive and active energy characteristics. Specifically, the designer must identify the building’s needs for achieving a system’s integration (Figure 2). The first step is a passive energy analysis of the building, in terms of transparency, thermal insulation, weather proofing, noise reduction and shading. At the or the cluster of buildings, at an urban level. The aim is to identify the ideal facade or facades within same time, the building’s energy needs for heating, cooling, domestic hot water and lighting should which the active system may be integrated with the least likely propagation of interfering shadows also be analysed. This is done so that one is able to select the appropriate active system that may that could a ect its performance. provide the required integration method. Figure 2. The roadmap for the integration of an active solar system into a building. Figure 2. The roadmap for the integration of an active solar system into a building. After selecting the buildings and their related facades, the second step proposes an energy In the third step, a digital model of the building with the integrated system is created, and its eciency study of the building under construction or major renovation in order to determine its energy production is simulated. The aim is to make sure that the appropriate system is chosen and passive and active energy characteristics. Specifically, the designer must identify the building’s needs that it can meet the necessary energy needs. in terms of transparency, thermal insulation, weather proofing, noise reduction and shading. At the In the fourth step, an energy efficiency study of the building with its integrated system is same time, the building’s energy needs for heating, cooling, domestic hot water and lighting should performed in order to measure its influence on the building’s passive and active energy also be analysed. This is done so that one is able to select the appropriate active system that may characteristics. If the results are satisfactory, and the system selection is correct, one may proceed to provide the required integration method. step five, or, in the reverse, one repeats the process from step three until the needs are met. In the third step, a digital model of the building with the integrated system is created, and its In the fifth and final step, the designer deals with the integration of the selected system into the energy production is simulated. The aim is to make sure that the appropriate system is chosen and building and the configuration of the construction details. These construction details aim to expose that it can meet the necessary energy needs. possible issues that may be related to the system and have to do with piping, wiring or other technical In the fourth step, an energy eciency study of the building with its integrated system is performed issues related to each incorporated technology. in order to measure its influence on the building’s passive and active energy characteristics. If the Looking back at the practices presented and based on the roadmap above, a common design results are satisfactory, and the system selection is correct, one may proceed to step five, or, in the strategy was derived that was followed in order to form the proposed design tool. This is based on the reverse, one repeats the process from step three until the needs are met. five steps presented above and aims to create a comprehensive and functional design tool. In addition In the fifth and final step, the designer deals with the integration of the selected system into the to the facilitating the design work, thereby saving time and money, the originality of this tool is based building and the configuration of the construction details. These construction details aim to expose on the fact that it takes an important step in standardising these studies. On the other hand, the possible issues that may be related to the system and have to do with piping, wiring or other technical implementation of this roadmap by a number of researchers and designers will make cross-referencing issues related to each incorporated technology. possible between different applications, and additionally it will enable us to create a database of Looking back at the practices presented and based on the roadmap above, a common design buildings with integrated solar systems that could provide designers with options at the front end of strategy was derived that was followed in order to form the proposed design tool. This is based on the the construction and environmental systems detailing process. five steps presented above and aims to create a comprehensive and functional design tool. In addition to the facilitating the design work, thereby saving time and money, the originality of this tool is based Appl. Sci. 2019, 9, 2462 6 of 16 on the fact that it takes an important step in standardising these studies. On the other hand, the implementation of this roadmap by a number of researchers and designers will make cross-referencing possible between di erent applications, and additionally it will enable us to create a database of buildings with integrated solar systems that could provide designers with options at the front end of the construction and environmental systems detailing process. It should be noted that, in order for this roadmap to be used, solar energy must have been chosen as the main renewable energy source of the building, and the use of a building-integrated active solar system must also have been chosen. Otherwise, the methodological process may be very di erent, since it will follow the characteristics and requirements of each case. 4. Roadmap Development As was mentioned in the methodology section, the full development of the roadmap is performed by analysing each step based on the work done by other researchers and the full development of the process that needs to be followed at each step. 4.1. Step 1—Passive Analysis Step 1 of the roadmap deals with the passive energy analysis of the building, or cluster of buildings, at an urban level. The process is based on previous work by Savvides et al. [60,61], and starts with the three-dimensional representation and modelling of the building, or building cluster, at an urban level. This model is used for simulations that should be made in order to calculate the solar incidence on a building’s shell. The total insolation value represents a first attempt to quantify the building’s solar potential, while the three-dimensional model can also provide an accurate estimation of any interfering shadows that could a ect the building’s solar performance. Subsequently, the incident radiation on a building’s shell is thoroughly analysed, which provides a first indication of the surfaces on which an active solar system could be viably integrated in terms of energy production. It also an early attempt to identify which surfaces of a building might require passive solar protection to avoid possible overheating issues. All the above help in the initial optimisation of a building’s geometry. At the same time, because incident radiation may not be used on its own to fully determine the viability of a building to reasonably accept the integration of an active solar system, the least possible amount of incident radiation on a surface that would allow for this should be calculated. Vassiliades [26] reports that a building may exhibit a high value for average incident radiation, but a number of its constituent facades might exhibit comparatively lower incidence values, rendering the integration of an active solar system non-viable, a fact exhibited by an equation that provides the lowest radiation needed for a viable integration of an active solar system on a surface. The parameters for that figure’s calculation is the system’s performance, the energy cost in euros per kWh, the years for repayment and the system installation cost in euros per square meter of installation. The equation is presented below: 0 1 kWh B C System Installation and Maintenance Cost B 2 C m m B C B C Radiation =   . (1) B C @ A yr System Per f ormance  Energy Cost  Years f or Repayment kWh The first methodological step of the roadmap described above is presented in Figure 3. Appl. Sci. 2019, 9, x FOR PEER REVIEW 6 of 15 It should be noted that, in order for this roadmap to be used, solar energy must have been chosen as the main renewable energy source of the building, and the use of a building-integrated active solar system must also have been chosen. Otherwise, the methodological process may be very different, since it will follow the characteristics and requirements of each case. 4. Roadmap Development As was mentioned in the methodology section, the full development of the roadmap is performed by analysing each step based on the work done by other researchers and the full development of the process that needs to be followed at each step. 4.1. Step 1—Passive Analysis Step 1 of the roadmap deals with the passive energy analysis of the building, or cluster of buildings, at an urban level. The process is based on previous work by Savvides et al. [60,61], and starts with the three-dimensional representation and modelling of the building, or building cluster, at an urban level. This model is used for simulations that should be made in order to calculate the solar incidence on a building’s shell. The total insolation value represents a first attempt to quantify the building’s solar potential, while the three-dimensional model can also provide an accurate estimation of any interfering shadows that could affect the building’s solar performance. Subsequently, the incident radiation on a building’s shell is thoroughly analysed, which provides a first indication of the surfaces on which an active solar system could be viably integrated in terms of energy production. It also an early attempt to identify which surfaces of a building might require passive solar protection to avoid possible overheating issues. All the above help in the initial optimisation of a building’s geometry. At the same time, because incident radiation may not be used on its own to fully determine the viability of a building to reasonably accept the integration of an active solar system, the least possible amount of incident radiation on a surface that would allow for this should be calculated. Vassiliades [26] reports that a building may exhibit a high value for average incident radiation, but a number of its constituent facades might exhibit comparatively lower incidence values, rendering the integration of an active solar system non-viable, a fact exhibited by an equation that provides the lowest radiation needed for a viable integration of an active solar system on a surface. The parameters for that figure’s calculation is the system’s performance, the energy cost in euros per kWh, the years for repayment and the system installation cost in euros per square meter of installation. The equation is presented below: 𝑘𝑊ℎ € 𝐼𝑛𝑠𝑡𝑖𝑎 𝑎𝑛𝑑 𝑀𝑎𝑖𝑛𝑡 𝐶𝑜𝑠𝑡 𝑚 𝑚 𝑅𝑎𝑑𝑖𝑎𝑡𝑖𝑜𝑛 = . (1) 𝑚 𝑃𝑒𝑟𝑓𝑜 × 𝐶𝑜𝑠𝑡 × 𝑌 𝑓𝑜𝑟 𝑅𝑒𝑝𝑎𝑦𝑚𝑒 𝑘𝑊ℎ Appl. Sci. 2019, 9, 2462 7 of 16 The first methodological step of the roadmap described above is presented in Figure 3. Figure 3. The basic methodological steps for the first step of the roadmap, which deals with the passive Figure 3. The basic methodological steps for the first step of the roadmap, which deals with the Appl. Sci. 2019, 9, x FOR PEER REVIEW 7 of 15 energy analysis of the building, or cluster of buildings, at an urban level. passive energy analysis of the building, or cluster of buildings, at an urban level. 4.2. 4.2. Step Step 22—Ener —Energy gy Efficiency Eciency Study Study Step 2 of the roadmap deals with the energy eciency study of the building under construction in Step 2 of the roadmap deals with the energy efficiency study of the building under construction or in order t der to determine o determine it its passive s passive and and active active energy ch energy characteristics. aracteristics. The process st The process starts arts wi with th the ana the analysis lysis and determination of the thermal insulation, weather proofing and noise reduction requirements and and determination of the thermal insulation, weather proofing and noise reduction requirements and characteristics characteristics of of t the he b building. uilding. These These ch characteristics aracteristics n need eed tto o b be e def defined ined b because ecause t they hey cou coul ld d ha have ve an an impact on the choice of the active solar system to be integrated into the building. impact on the choice of the active solar system to be integrated into the building. Subsequently Subsequently ,,several several simu simulations latiarons e performed are perftoormed determine to determi several quanti ne several tative q characteristics uantitative of the building, such as the energy needs of the building and, specifically, its needs for heating, cooling, characteristics of the building, such as the energy needs of the building and, specifically, its needs for lighting heating, cool and domestic ing, lightihot ng and domesti water. Any c p ossible hot water. ener An gyy poss production ible enby ergy pro nonintegrated duction by nonintegrated active systems is also simulated at this stage in order to determine the energy balance of the building. active systems is also simulated at this stage in order to determine the energy balance of the building. Shading Shading and and insolation insolation of of the the buil building’s ding’s envelope envelope,, and and espec especially ially of of it its s g glazed lazed s surfaces, urfaces, is is t then hen simulated since they significantly contribute to the thermal performance of the building. This evaluation simulated since they significantly contribute to the thermal performance of the building. This could evaluation co be achieved uld be thr achiev ough ed th the use rough of shading the use of sh masks. ading masks. A visual comfort analysis follows, since it is an essential parameter of human comfort, while it A visual comfort analysis follows, since it is an essential parameter of human comfort, while it may may a also lso be d be defined efined as as a a s subjective ubjective condi condition tion of wel of well-being l-being in in an an in indoor door built built envi envir ronment onment [6 [62 2]. ]. It It is is used to investigate visual comfort of the occupants in terms of natural lighting and glare issues [63] as used to investigate visual comfort of the occupants in terms of natural lighting and glare issues [63] well as we as ll in as terms in terms of visual connection of visual connection with with the exter the exterior ienvir or env onment. ironment. The methodology that is followed in this step has been extensively presented by Vassiliades et al. [25], The methodology that is followed in this step has been extensively presented by Vassiliades et and al. [2 aims 5], and at the aim determination s at the determ of inat the ion o passive f the p and ass active ive and character active ch istics aract ofethe ristics o building f the b that uild a ing ect tthe hat choice of the active solar system. affect the choice of the active solar system. The The second second methodological methodological step of the step of the r roadm oadmap ap described described above above is is presented presented in in Figure 4. Figure 4. Figure 4. The basic methodological steps for the second step of the roadmap, which deals with the Figure 4. The basic methodological steps for the second step of the roadmap, which deals with the energy eciency study of the building under construction. energy efficiency study of the building under construction. 4.3. Step 3—Integration of an Active System Step 3 of the roadmap deals with the integration of a selected active solar system and a simulation of its energy production in order to confirm that it may cover the energy needs of the building and has the expected passive behavior as determined in Step 2. The process starts with the integration of a system on a three-dimensional model of a building to identify possible geometrical as well as morphological issues that may be optimised at this early stage. Subsequently, the computational calculations of a system’s energy production are performed using appropriate software. The software can be selected by the designer as per the requirements of the project. However, it is important to confirm the validity of the simulation results by performing pilot simulations using a well-established software, e.g., TRNSYS [64]. In order to obtain accurate results, it is important to use the technical characteristics of the specific models of used active solar systems. It should also be noted that, for evaluation purposes, the energy production of all used systems should be given in the same unit notations. Similarly, all of the energy production and consumption values should be converted into primary energy values following the energy performance of buildings Directive (2018/844/EU) [9] in order to allow for comparability between buildings and help facilitate their subsequent certification. Similar work that calculates the energy production of building-integrated active solar systems via computational simulations has been performed by Vassiliades et al. [25,26,65,66]. Finally, any chosen design should be implemented without violating applicable regulations. The third methodological step of the roadmap described above is presented in Figure 5. 𝑛𝑡 𝑒𝑎𝑟𝑠 𝐸𝑛𝑒𝑟𝑔𝑦 𝑐𝑒𝑟𝑚𝑎𝑛 𝑆𝑦𝑠𝑡𝑒 𝑦𝑟 𝑐𝑒𝑎𝑛𝑒𝑛 𝑙𝑙𝑎𝑡𝑜𝑛 𝑒𝑚𝑠𝑡𝑆𝑦 Appl. Sci. 2019, 9, 2462 8 of 16 4.3. Step 3—Integration of an Active System Step 3 of the roadmap deals with the integration of a selected active solar system and a simulation of its energy production in order to confirm that it may cover the energy needs of the building and has the expected passive behavior as determined in Step 2. The process starts with the integration of a system on a three-dimensional model of a building to identify possible geometrical as well as morphological issues that may be optimised at this early stage. Subsequently, the computational calculations of a system’s energy production are performed using appropriate software. The software can be selected by the designer as per the requirements of the project. However, it is important to confirm the validity of the simulation results by performing pilot simulations using a well-established software, e.g., TRNSYS [64]. In order to obtain accurate results, it is important to use the technical characteristics of the specific models of used active solar systems. It should also be noted that, for evaluation purposes, the energy production of all used systems should be given in the same unit notations. Similarly, all of the energy production and consumption values should be converted into primary energy values following the energy performance of buildings Directive (2018/844/EU) [9] in order to allow for comparability between buildings and help facilitate their subsequent certification. Similar work that calculates the energy production of building-integrated active solar systems via computational simulations has been performed by Vassiliades et al. [25,26,65,66]. Finally, any chosen design should be implemented without violating applicable regulations. The third methodological step of the roadmap described above is presented in Figure 5. Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the integration of the selected active solar system and the simulation of its energy production. integration of the selected active solar system and the simulation of its energy production. 4.4. Step 4—Energy Eciency Study Subsequent to System Integration 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration Step 4 of the roadmap deals with the energy eciency study of the building under construction, Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with with the integrated system, in order to show its influence on the building’s passive and active the integrated system, in order to show its influence on the building’s passive and active energy energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements requirements and the energy production of a building are simulated in order to determine the energy and the energy production of a building are simulated in order to determine the energy balance of said balance of said building, followed by shading and insolation simulations and a visual comfort analysis building, followed by shading and insolation simulations and a visual comfort analysis with the use of with the use of the same methodological process as in Step 2. The di erence in this step is that, the same methodological process as in Step 2. The difference in this step is that, if the results of the if the results of the simulations are not as expected, the designer may return to Step 3 and try a simulations are not as expected, the designer may return to Step 3 and try a different system. di erent system. The fourth methodological step of the roadmap is presented in Figure 6. The fourth methodological step of the roadmap is presented in Figure 6. Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the energy efficiency study of the building under construction, with the integrated system. 4.5. Step 5—Integration of the Selected System into the Building Step 5 of the roadmap deals with the integration of the selected system into the building and the configuration of construction details. The process starts with the design of the structural system for the support of the solar system. Subsequently, internal control points may be placed in selected interior locations, from which visual inspections and repairs to piping connections may be made. After that, depending on the integrated system and the possibility of the need for weather protection, the continuity of the system array should be ensured in order to provide the desired thermal insulation and waterproofing. Regarding connection to technical services (electromechanical and water supply), the connectedness to the system’s modules should be anticipated. With regard to piping between two modules that are placed at a distance from service outlets emanating from a mechanical room, these should be integrated using through-wall connections. The fifth methodological step of the roadmap is presented in Figure 7. Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the integration of the selected system into the building and design of the construction details. Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the integration of the selected active solar system and the simulation of its energy production. integration of the selected active solar system and the simulation of its energy production. 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with the integrated system, in order to show its influence on the building’s passive and active energy the integrated system, in order to show its influence on the building’s passive and active energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements and the energy production of a building are simulated in order to determine the energy balance of said and the energy production of a building are simulated in order to determine the energy balance of said building, followed by shading and insolation simulations and a visual comfort analysis with the use of building, followed by shading and insolation simulations and a visual comfort analysis with the use of the same methodological process as in Step 2. The difference in this step is that, if the results of the the same methodological process as in Step 2. The difference in this step is that, if the results of the simulations are not as expected, the designer may return to Step 3 and try a different system. simulations are not as expected, the designer may return to Step 3 and try a different system. Appl. Sci. 2019, 9, 2462 9 of 16 The fourth methodological step of the roadmap is presented in Figure 6. The fourth methodological step of the roadmap is presented in Figure 6. Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the energy efficiency study of the building under construction, with the integrated system. energy eciency study of the building under construction, with the integrated system. energy efficiency study of the building under construction, with the integrated system. 4.5. Step 5—Integration of the Selected System into the Building 4.5. Step 5—Integration of the Selected System into the Building 4.5. Step 5—Integration of the Selected System into the Building Step Step 5 5 of of the roa the roadmap dmap deals wi deals with th the i the integration ntegration of of th the e selected selected system into the buildin system into the building g and t and the he Step 5 of the roadmap deals with the integration of the selected system into the building and the configuration of construction details. The process starts with the design of the structural system for the configuration of construction details. The process starts with the design of the structural system for configuration of construction details. The process starts with the design of the structural system for support the support of the of t solar he so system. lar syst Subsequently em. Subsequent , internal ly, intcontr ernal cont ol points rol p may oints be ma placed y be place in selected d in se interior lected the support of the solar system. Subsequently, internal control points may be placed in selected locations, from which visual inspections and repairs to piping connections may be made. interior locations, from which visual inspections and repairs to piping connections may be made. interior locations, from which visual inspections and repairs to piping connections may be made. After After tha that, t, dependi depending ng on the on the integrated integrated system system an and d t the he poss possibility ibility of of t the he ne need ed for for we weather ather After that, depending on the integrated system and the possibility of the need for weather protection, the continuity of the system array should be ensured in order to provide the desired thermal protection, the continuity of the system array should be ensured in order to provide the desired protection, the continuity of the system array should be ensured in order to provide the desired insulation thermal ins and ulatwaterpr ion and oofing. waterproofing. thermal insulation and waterproofing. Regarding connection to technical services (electromechanical and water supply), the connectedness Regarding connection to technical services (electromechanical and water supply), the Regarding connection to technical services (electromechanical and water supply), the to connectednes the system’s s to the sy modulesstem’s module should be antic s ipated. should be With an rti egar cipa dted. Wi to piping th rega between rd to p two ipimodules ng between two that are connectedness to the system’s modules should be anticipated. With regard to piping between two placed at a distance from service outlets emanating from a mechanical room, these should be integrated modules that are placed at a distance from service outlets emanating from a mechanical room, these modules that are placed at a distance from service outlets emanating from a mechanical room, these using should thr be ough-wall integrated connections. using through-wall connections. should be integrated using through-wall connections. The fifth methodological step of the roadmap is presented in Figure 7. The fifth methodological step of the roadmap is presented in Figure 7. The fifth methodological step of the roadmap is presented in Figure 7. Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the integration of the selected system into the building and design of the construction details. integration of the selected system into the building and design of the construction details. integration of the selected system into the building and design of the construction details. 4.6. Formulation of a Complete Roadmap Based on the early roadmap that was presented above, and in combination with extensive analysis at each step, a complete roadmap was created and is shown in Figure 8. The development of this design methodology may be followed by designers for the integration of active solar systems into buildings. Moving from step to step, the designer may apply the proposed methodology to integrate a solar system within new or existing buildings. It should be noted that the roadmap is a general methodology that may be applied in the majority of cases. However, it is at the discretion of each designer to apply it accordingly and to use it based on the specific circumstances that apply in each case. Appl. Sci. 2019, 9, x FOR PEER REVIEW 9 of 15 4.6. Formulation of a Complete Roadmap Based on the early roadmap that was presented above, and in combination with extensive analysis at each step, a complete roadmap was created and is shown in Figure 8. The development of this design methodology may be followed by designers for the integration of active solar systems into buildings. Moving from step to step, the designer may apply the proposed methodology to integrate a solar system within new or existing buildings. It should be noted that the roadmap is a general methodology that may be applied in the majority of cases. However, it is at the discretion of each designer Appl. Sci. 2019, 9, 2462 10 of 16 to apply it accordingly and to use it based on the specific circumstances that apply in each case. Figure 8. Illustration of the proposed methodology for a roadmap pertaining to the integration of active solar systems into buildings. 5. Discussion and Conclusions The main aim of this research is to create a roadmap that proposes a design path that a designer may follow to integrate an active solar system into a building. The research is based on the work of Vassiliades [26], which represents an early attempt to create a roadmap to ensure the viability of Appl. Sci. 2019, 9, 2462 11 of 16 building-integrated active solar systems. In order to achieve this, a methodological procedure was developed as an extension to the aforementioned roadmap. Given that contemporary architectural and urban design strategies with regard to buildings and building clusters aim to achieve the smallest possible energy consumption, challenges arise from the potential for local energy production, which depends on the use of renewable energy, and is interpreted as solar energy in a number of countries in the EU, since it accounted for 6.4% of the primary renewables production in 2017 for the EU-28 and 21.9% of the primary renewables production in 2017 for the southern EU countries [11]. This is because the main driver of energy consumption in buildings is thermal comfort for users; an example of this is the fact that 49% of the total household energy consumption in the United States in 2005 came from space heating and cooling loads [67]. This is because energy demand for climate control and the level of indoor environmental comfort that is achieved are interrelated, such that a higher level of thermal comfort demands higher energy consumption and vice versa [68]. This may be balanced in a nearly zero energy building given an appropriate study of the building’s thermal comfort requirements and potential energy loads, which will lead to an appropriate selection of the type and size of the renewable system. Given that solar energy is the renewable energy that was chosen to cover the building’s energy needs, the presented research aims to simplify and standardise the process of integrating an active solar system into a building in order to ensure that its energy and environmental behaviour complies with legislation and good sustainable urban and building design practices. The originality of this research is based on the fact that, although a number of other design tools/roadmaps can be found in the literature, none of them focuses on building integration. At the same time, the research complements the work and findings of other researchers on the subject [26–30], since it focuses on the sustainable use of building-integrated active solar systems in terms of their energy production potential. Specifically, the proposed toolset, which optimises a building’s massing to harvest as much insolation as possible and promotes electricity production by the application of solar energy, is highly supplemented by the proposed roadmap, given that, in Step 1, the passive energy analysis of the building, or cluster of buildings, aims to confirm the ideal façade orientation for sustainable integration of active solar systems, and also aims to confirm that the selected massing configuration results in the least likely propagation of interfering shadows that could a ect its performance. At the same time, Steps 2–4 deal with the active and passive behavior of the building’s energy and environmental control performance, as well as with its energy production potential, which are dependent on its massing configuration. The research also supplements the work of researchers who have dealt with the creation of design tools that aim to optimise a specific aspect of a building design, or their geometric forms, in order to shape energy-ecient and sustainable architectural solutions [31–38]. This is demonstrated in Step 1 of the methodology, where an initial optimisation of the building’s geometry is proposed. A second prompt for the optimisation of the building’s geometry is referred to in Step 3 of the roadmap subsequent to the system’s integration into the building, and helps to identify possible geometrical issues that could be regulated at that point. Similarly, Steps 2–4 of the proposed roadmap, which outline the energy eciency studies to be performed before and after the integration of the system, extend and improve the work of researchers that have proposed design optimisation tools [40–43]. The final step of the roadmap focuses on that aspect, since it deals with the integration of the selected system into the building and the configuration of the construction details, aiming at the system’s viable and seamless operation. At the same time, it should be noted that, despite the di erence in the subject between this research and the work of other researchers [44–48,50,52–55] dealing with the development of roadmaps for the optimisation of related processes in the field of research and development and in the field of production and manufacturing, the work presented in this paper contributes to the wider field of technology as it proposes a standardisation process that relies on a variety of parameters that need to be approached in an interdisciplinary way by several di erent professionals and researchers. Thus, it contributes to the Appl. Sci. 2019, 9, 2462 12 of 16 minimisation of the study time needed for this kind of application by minimising the economic cost, confirming the contribution to sustainability of the integration of such systems into buildings, and reducing the risk of a potential investment in this type of building. The implementation of the roadmap also resolves issues and speeds up potential research work. Particularly, it was observed that, in the work done by COST Action TU1205—BISTS [58], where five research teams developed five di erent solar systems and proposed viable solutions for their integration into a building, each team applied a di erent and specialised design and manufacturing solution for each system. With the use of the roadmap in similar research works, the process is expected to be completed more quickly given that teams may focus on the performance of the system itself and not on the investigation of building integration processes, since this will be fundamentally resolved by the roadmap. However, in order to implement the roadmap, there is a need for researchers to take a common approach and use common units of measurement, as described in the third step of the methodology. It should further be noted that the implementation of the roadmap by a number of researchers and designers will make possible cross-referencing of the results between di erent applications and case studies, thereby leading to the creation of a database of buildings with integrated active solar systems. This database can then provide researchers and designers with an early picture of the choices they can make in their own studies and applications. Further Research Based on the current research, and with the creation and constant update of the aforementioned database, this roadmap could evolve into a more detailed tool that could provide further information to designers with the presentation of a comparative analysis and data for each design step, which may be based on corresponding design applications in the database. Furthermore, other possible research directions may entail the digitisation of the roadmap and the integration of computational processes in it, within which the designer may insert additional parameters that produce results without the need to use independent computing processes and software. Further research could recheck the roadmap and redefine its steps and parameters based on data and feedback from the implementation of this process in realised projects. Author Contributions: Investigation, C.V.; Methodology, C.V., S.K., A.S. and A.M.; Visualisation, C.V. and A.M.; Writing—Original Draft, C.V.; Writing—Review & Editing, C.V., S.K., A.S. and A.M. Funding: This research received no external funding. Conflicts of Interest: The authors declare that no potential conflicts of interest exist with respect to the research, authorship, and/or publication of this article. Abbreviations BISTS Building Integrated Solar Thermal Systems BIPVS Building Integrated Photovoltaic Systems GHI Global Horizontal Irradiance EU European Union EPBD Energy Performance of Buildings Directive RES Renewable Energy Sources STS Solar Thermal Systems PV Photovoltaics PMMA Polymethylmethacrylate GUUD Geographical Urban Units Delimitation GIS Geographic Information Systems NZEB Nearly Zero Energy Buildings HVAC Heating, ventilation, and air conditioning HyPVT Hybrid Photovoltaic/Solar Thermal CoPVTG Concentrating Photovoltaic/Thermal Glazing FPSTC Flat-plate Solar Thermal Collectors Appl. Sci. 2019, 9, 2462 13 of 16 References 1. Tombazis, A.N. Architectural design: A multifaceted approach. Renew. Energy 1994, 5, 893–899. [CrossRef] 2. Technology Roadmap, Solar Photovoltaic Energy. Int. Energy Agency 2014, 58. Available online: https://www.iea.org/publications/freepublications/publication/TechnologyRoadmapSolarPhotov oltaicEnergy_2014edition.pdf (accessed on 1 June 2015). 3. Yang, Y.; Wang, Q.; Xiu, D.; Zhao, Z.; Sun, Q. A building integrated solar collector: All-ceramic solar collector. Energy Build. 2013, 62, 15–17. [CrossRef] 4. Koroneos, C.; Spachos, T.; Moussiopoulos, N. Exergy analysis of renewable energy sources. Renew. Energy 2003, 28, 295–310. [CrossRef] 5. Painuly, J. Barriers to renewable energy penetration; a framework for analysis. Renew. Energy 2001, 24, 73–89. [CrossRef] 6. The 2020 Climate and Energy Package. European Commission Climate Action. 2009. Available online: http://ec.europa.eu/clima/policies/package/index_en.htm (accessed on 1 June 2015). 7. Climate Action. 2014. Available online: https://europa.eu/european-union/topics/climate-action_en (accessed on 26 April 2018). 8. Kalogirou, S.A. Building integration of solar renewable energy systems towards zero or nearly zero energy buildings. Int. J. Low Carbon Technol. 2013, 10, 379–385. [CrossRef] 9. Energy Performance of Buildings Directive (2018/844/EU); EU: Brussels, Belgium, 2018; pp. 75–91. 10. Directive (EU) 2018/2001 of the European Parliament and of the Council on the Promotion of the Use of Energy from Renewable Sources, 208AD. Available online: https://eur-lex.europa.eu/legal-content/EN/TXT/? uri=CELEX%3A32018L2001 (accessed on 2 May 2019). 11. Renewable Energy Statistics, Eurostat. 2019. Available online: https://ec.europa.eu/eurostat/statistics-expla ined/index.php/Renewable_energy_statistics#Wind_power_becomes_the_most_important_renewable_s ource_of_electricity (accessed on 15 March 2019). 12. Song, J.; Zhu, Y.; Tong, K.; Yang, Y.; Reyes-Belmonte, M.A. A note on the optic characteristics of daylighting system via PMMA fibers. Sol. Energy 2016, 136, 32–34. [CrossRef] 13. González-Pardo, A.; Cesar Chapa, S.; Gonzalez-Aguilar, J.; Romero, M. Optical performance of vertical heliostat fields integrated in building façades for concentrating solar energy uses. Sol. Energy 2013, 97, 447–459. [CrossRef] 14. Hestnes, A.G. Building Integration Of Solar Energy Systems. Sol. Energy 1999, 67, 181–187. [CrossRef] 15. Bougiatioti, F.; Michael, A. The architectural integration of active solar systems. Building applications in the Eastern Mediterranean region. Renew. Sustain. Energy Rev. 2015, 47, 966–982. [CrossRef] 16. Michael, A.; Bougiatioti, F.; Oikonomou, A. Less Could Be More: Architectural Integration of Active Solar Systems in Existing Urban Centres. In Proceedings of the 7th Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion (MedPower 2010), Aghia Napa, Cyprus, 7–10 November 2010; IET: Rautistrasse, Zürich, 2011. 17. K.D.P. 119/2016. The Laws that Regulate the Energy Eciency of Buildings, Cyprus. 2016. Available online: http://www.cea.org.cy/wp-content/uploads/2017/01/kdp-119-2016.pdf (accessed on 18 April 2018). 18. Hagemann, I.B. Solar Design in Architecture and Urban planning. In Proceedings of the Urban Planning-Sustainable Cities, Tokyo, Japan, 2005; pp. 1–10. 19. Vale, B.; Vale, R. Green Architecture: Design for a Sustainable Future; Thames & Hudson Ltd.: London, UK, 1991; ISBN 978-0500341179. 20. Philokyprou, M.; Savvides, A.; Michael, A.; Malaktou, E. Examination and assessment of the environmental characteristics of vernacular rural settlements. Three case studies in Cyprus. In Proceedings of the 5th International Conference on Vernacular Heritage, Sustainability and Earthen Architecture, Valencia, Spain, 11–13 September 2014; Taylor & Francis Group: Didcot, UK, 2014; pp. 613–618. 21. Knudstrup, M.-A.; Ring Hansen, H.T.; Brunsgaard, C. Approaches to the design of sustainable housing with low CO2 emission in Denmark. Renew. Energy 2009, 34, 2007–2015. [CrossRef] 22. Michael, A.; Phocas, M. Construction Design and Sustainability in Architecture: Integrating Environmental Education into Architectural Studies. J. Renew. Energy Power Q. 2012, 190–195. [CrossRef] 23. Phocas, M.; Michael, A.; Fokaides, P. Integrated Interdisciplinary Design: The Environment as Part of Architectural Education. Renew. Energy Power Q. J. 2011, 9, 937–941. [CrossRef] Appl. Sci. 2019, 9, 2462 14 of 16 24. Hui, S.C. Low energy building design in high density urban cities. Renew. Energy 2001, 24, 627–640. [CrossRef] 25. Vassiliades, C.; Michael, A.; Savvides, A.; Kalogirou, S. Improvement of passive behaviour of existing buildings through the integration of active solar energy systems. Energy 2018, 163, 1178–1192. [CrossRef] 26. Vassiliades, C. Building Integration of Active Solar Systems: Addressing all Scales of Intervention and Ensuring their Active and Passive Integration Viability in the Eastern Mediterranean Region. Ph.D. Thesis, University of Cyprus, Nicosia, Cyprus, 2018. 27. Lobaccaro, G.; Frontini, F.; Masera, G.; Poli, T. SolarPW: A New Solar Design Tool to Exploit Solar Potential in Existing Urban Areas. Energy Procedia 2012, 30, 1173–1183. [CrossRef] 28. Lobaccaro, G.; Frontini, F. Solar Energy in Urban Environment: How Urban Densification A ects Existing Buildings. Energy Procedia 2014, 48, 1559–1569. [CrossRef] 29. Lobaccaro, G.; Fiorito, F.; Masera, G.; Poli, T. District geometry simulation: A study for the optimization of solar facades in urban canopy layers. Energy Procedia 2012, 30, 1163–1172. [CrossRef] 30. Amado, M.; Poggi, F. Solar urban planning: A parametric approach. Energy Procedia 2014, 48, 539–1548. [CrossRef] 31. Attia, S.; Gratia, E.; De Herde, A.; Hensen, J.L.M. Simulation-based decision support tool for early stages of zero-energy building design. Energy Build. 2012, 49, 2–15. [CrossRef] 32. Caldas, L.G.; Norford, L.K. A design optimization tool based on a genetic algorithm. Autom. Constr. 2002, 11, 173–184. [CrossRef] 33. Turrin, M.; von Buelow, P.; Stou s, R. Design explorations of performance driven geometry in architectural design using parametric modeling and genetic algorithms. Adv. Eng. Inf. 2011, 25, 656–675. [CrossRef] 34. Caldas, L. GENE_ARCH: An Evolution-Based Generative Design System for Sustainable Architecture. In Intelligent Computing in Engineering and Architecture-EG-ICE 2006; Smith, I.F.C., Ed.; Springer: Berlin/Heidelberg, Germany, 2006; pp. 109–118. 35. Kämpf, J.H.; Robinson, D. Optimisation of building form for solar energy utilisation using constrained evolutionary algorithms. Energy Build. 2010, 42, 807–814. [CrossRef] 36. Charron, R.; Athienitis, A. The Use of Genetic Algorithms for a Net-Zero Energy Solar Home Design Optimisation Tool. In Proceedings of the PLEA2006, Geneva, Switzerland, 6–8 September 2006. Available online: https://www.researchgate.net/publication/241734123 (accessed on 11 October 2018). 37. Østergård, T.; Jensen, R.L.; Maagaard, S.E. Building simulations supporting decision making in early design—A review. Renew. Sustain. Energy Rev. 2016, 61, 187–201. [CrossRef] 38. Wang, W.; Rivard, H.; Zmeureanu, R. Floor shape optimization for green building design. Adv. Eng. Inf. 2006, 20, 363–378. [CrossRef] 39. Vallet, F.; Eynard, B.; Millet, D.; Mahut, S.G.; Tyl, B.; Bertoluci, G. Using eco-design tools: An overview of experts’ practices. Des. Stud. 2013, 34, 345–377. [CrossRef] 40. Huang, W.; Lam, H.N. Using genetic algorithms to optimize controller parameters for HVAC systems. Energy Build. 1997, 26, 277–282. [CrossRef] 41. Granlund, M.P.; Hasan, A.; Sirén, K.; Palonen, M.; Siren, K. A Genetic Algorithm for Optimization of Building Envelope and HVAC System Parameters. In Proceedings of the Eleventh International IBPSA Conference, Glasgow, Scotland, 27–30 July 2009. Available online: https://www.researchgate.net/publication/252429941 (accessed on 11 October 2018). 42. Hamdy, M.; Hasan, A.; Siren, K. Optimum design of a house and its HVAC systems using simulation-based optimisation. Int. J. Low Carbon Technol. 2010, 5, 120–124. [CrossRef] 43. Attia, S.; Hamdy, M.; O’Brien, W.; Carlucci, S. Assessing gaps and needs for integrating building performance optimization tools in net zero energy buildings design. Energy Build. 2013, 60, 110–124. [CrossRef] 44. Garlan, D. Software Architecture: A Roadmap, Pittsburgh. 2000. Available online: http://citeseerx.ist.psu.ed u/viewdoc/download?doi=10.1.1.571.8735&rep=rep1&type=pdf (accessed on 11 October 2018). 45. Srinivasan, M.K.; Sarukesi, K.; Keshava, A.; Revathy, P. eCloudIDS—Design Roadmap for the Architecture of Next-Generation Hybrid Two-Tier Expert Engine-Based IDS for Cloud Computing Environment; Springer: Berlin/Heidelberg, Germany, 2012; pp. 358–371. 46. Jennings, N.R.; Wooldridge, M. A Roadmap of Agent Research and Development. Auton. Agents Multi-Agent Syst. 1998, 1, 7–38. Available online: https://link.springer.com/content/pdf/10.1023/A:1010090405266.pdf (accessed on 11 October 2018). [CrossRef] Appl. Sci. 2019, 9, 2462 15 of 16 47. Embedded Systems Design: The ARTIST Roadmap for Research and Development; Bouyssounouse, B.; Sifakis, J. (Eds.) Springer: Berlin/Heidelberg, Germany, 2005; ISBN 9783540319733. 48. Corallo, A.; Margherita, A.; Scalvenzi, M.; Storelli, D. Building a process-based organization: The design roadmap at Superjet International. Knowl. Process Manag. 2010, 17, 49–61. [CrossRef] 49. Kim, K.; Lee, K. Collaborative product design processes of industrial design and engineering design in consumer product companies. Des. Stud. 2016, 46, 226–260. [CrossRef] 50. Daim, T.U.; Oliver, T. Implementing technology roadmap process in the energy services sector: A case study of a government agency. Technol. Forecast. Soc. Chang. 2008, 75, 687–720. [CrossRef] 51. Lu, H.; You, H.; Lu, H.; You, H. Roadmap Modeling and Assessment Approach for Defense Technology System of Systems. Appl. Sci. 2018, 8, 908. [CrossRef] 52. Frazier, F.W.E. Direct Digital Manufacturing of Metallic Components: Vision and Roadmap. In Proceedings of the 21st International Solid Freeform Fabrication Symposium, Austin, TX, USA, 9–11 August 2010; pp. 9–11. Available online: http://sffsymposium.engr.utexas.edu/Manuscripts/2010/2010-60-Frazier.pdf (accessed on 11 October 2018). 53. Putnik, G.; Sluga, A.; ElMaraghy, H.; Teti, R.; Koren, Y.; Tolio, T.; Hon, B. Scalability in manufacturing systems design and operation: State-of-the-art and future developments roadmap. CIRP Ann. 2013, 62, 751–774. [CrossRef] 54. Tate, D.; Nordlund, M. A Design Process Roadmap as a General Tool for Structuring and Supporting Design Activities. In Proceedings of the Second World Conference Integrated Design & Process Technology (IDPT-Vol. 3), Society for Design and Process Science, Austin, Texas, 1–4 December 1996; pp. 97–104. Available online: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.473.8676&rep=rep1&type=pdf (accessed on 11 October 2018). 55. Martin-Moe, S.; Lim, F.J.; Wong, R.L.; Sreedhara, A.; Sundaram, J.; Sane, S.U. A new roadmap for biopharmaceutical drug product development: Integrating development, validation, and quality by design. J. Pharm. Sci. 2011, 100, 3031–3043. [CrossRef] 56. Zhang, Z.; Ou, J.; Li, D.; Zhang, S.; Zhang, Z.; Ou, J.; Li, D.; Zhang, S. Optimization Design of Coupling Beam Metal Damper in Shear Wall Structures. Appl. Sci. 2017, 7, 137. [CrossRef] 57. Alturki, A.; Gable, G.G.; Bandara, W. A Design Science Research Roadmap. In Proceedings of the International Conference on Design Science Research in Information Systems, Milwaukee, WI, USA, 5–6 May 2011; Springer: Berlin/Heidelberg, Germany, 2011; pp. 107–123. Available online: https://eprints.qut.edu.au/42496/7/42496.p df (accessed on 11 October 2018). 58. Kalogirou, S.A.; Palombo, A.; Pugsley, A.; Zacharopoulos, A.; Besheer, A.; Krstic-Furundzic, A.; Enesca, A.; Dută, A.; Savvides, A.; Ford, A.; et al. Building Integrated Solar Thermal Systems, Design and Applications Handbook; Kalogirou, S.A., Ed.; COST Oce: Brussels, Belgium, 2017; ISBN 978-9963-697-22-9. 59. Li, L.; Qu, M.; Peng, S. Performance evaluation of building integrated solar thermal shading system: Building energy consumption and daylight provision. Energy Build. 2016, 113, 189–201. [CrossRef] 60. Savvides, A.; Vassiliades, C.; Michael, A. Geometrical Optimization of the Urban Fabric in order to Ensure the Viability of Building Integration of Active Solar Systems. In Proceedings of the First International Conference on Building Integrated Renewable Energy Systems, Dublin, Ireland, 6–9 March 2017; Kalogirou, S., Kennedy, D., Eds.; p. 12. 61. Savvides, A.; Vassiliades, C.; Michael, A.; Kalogirou, S. Siting and building-massing considerations for the urban integration of active solar energy systems. Renew. Energy 2019, 135, 963–974. [CrossRef] 62. Light and lighting—Basic Terms and Criteria for Specifying Lighting Requirements; EN 12665: Brussels, Belgium, 2011; pp. 3–48. 63. Carlucci, S.; Causone, F.; De Rosa, F.; Pagliano, L. A review of indices for assessing visual comfort with a view to their use in optimization processes to support building integrated design. Renew. Sustain. Energy Rev. 2015, 47, 1016–1033. [CrossRef] 64. TRNRSYS. 2019. Available online: http://www.trnsys.com/ (accessed on 04 May 2019). 65. Vassiliades, C.; Savvides, A.; Michael, A. Investigation of Sun Protection Issues of Building Envelopes via Active Energy Production Systems. In Proceedings of the Euro Elecs 2015, Guimarães, Portugal, 21–23 July 2015; Bragança, L., Yuba, A.N., Engel de Alvarez, C., Eds.; pp. 697–706. Appl. Sci. 2019, 9, 2462 16 of 16 66. Vassiliades, C.; Michael, A.; Savvides, A.; Kalogirou, S. Environmental Assessment of the Integration of Active Solar Energy Systems on Building Envelopes in Southern Europe. In Proceedings of the 10th International Conference on Sustainable Energy and Environmental Protection (SEEP 2017), Bled, Slovenia, 27–30 June 2017; Krope, J., Olabi, A.G., Goricanec, ˇ D., Božicnik, ˇ S., Eds.; University of Maribor Press: Bled, Slovenia, 2017; pp. 179–190. 67. Seiferlein, K.E. Annual Energy Review 2007; USDOE Energy Information Administration (EIA): Washington, DC, USA, 2008. [CrossRef] 68. Simmonds, P. Thermal Comfort and Optimal Energy Use. ASHRAE Trans. 1993, 99, 1037–1048. © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/). http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Applied Sciences Multidisciplinary Digital Publishing Institute

A Roadmap for the Integration of Active Solar Systems into Buildings

Loading next page...
 
/lp/multidisciplinary-digital-publishing-institute/a-roadmap-for-the-integration-of-active-solar-systems-into-buildings-QQb05RZsoD

References (67)

Publisher
Multidisciplinary Digital Publishing Institute
Copyright
© 1996-2019 MDPI (Basel, Switzerland) unless otherwise stated
ISSN
2076-3417
DOI
10.3390/app9122462
Publisher site
See Article on Publisher Site

Abstract

applied sciences Article A Roadmap for the Integration of Active Solar Systems into Buildings 1 , 2 1 1 Constantinos Vassiliades * , Soteris Kalogirou , Aimilios Michael and Andreas Savvides Department of Architecture, University of Cyprus, Nicosia 1678, Cyprus; aimilios@ucy.ac.cy (A.M.); als@ucy.ac.cy (A.S.) Department of Mechanical Engineering and Materials Science and Engineering, Cyprus University of Technology, Limassol 3036, Cyprus; soteris.kalogirou@cut.ac.cy * Correspondence: vassiliades.constantinos@ucy.ac.cy Received: 8 May 2019; Accepted: 11 June 2019; Published: 17 June 2019 Abstract: This paper aims to simplify the interdisciplinary design process that will be used as a design tool for the viable integration of active solar energy systems into buildings, i.e., Building-Integrated Solar Thermal Systems—BISTSs; Building-Integrated Photovoltaic Systems—BIPVSs, through the creation of a roadmap. The research also aims supplement the work of researchers who have dealt with the creation of design tools that aim to optimise a specific aspect of a building design, or their geometric forms, in order to shape energy-ecient and sustainable architectural solutions. More specifically, a prescriptive design strategy is derived from the proposed design tool. This is based on five design steps, each of which is analysed and which lead to the creation of a comprehensive design tool for siting buildings so as to optimise the integration of solar systems. The originality of this tool is based on the fact that it makes an important step in the standardisation of these studies. Keywords: design guidelines; building integration; roadmap; sustainable development; active solar systems 1. Introduction The first oil crisis in the early 1970s forced the building industry to a sudden awakening, and the development of a concentrated e ort, in order to reduce building energy needs, that focused initially on the active systems of the building, with the passive approach to the subject following in the mid-1970s [1]. It is interesting, however, that the reckless use of fossil fuels for energy production that led to the aforementioned environmental problems and oil crisis took place while Europe’s average Global Horizontal Irradiance (GHI) was about 1200 kWh/m /year [2]. Considering the above, it became clear that the use and exploitation of renewable energy sources, especially solar energy, during architectural planning is one of the most important parameters a building needs to meet in order to be considered viable. On the other hand, the direction towards solar energy may be the only viable proposition, since it is considered to be the alternative energy source with the greatest potential to reduce the dependence on fossil fuels [3–5]. At the same time, the European Union (EU)’s Climate Action and, in particular, the 20-20-20 program that is currently active, sets targets for a 20% reduction in EU greenhouse gas emissions compared to 1990 levels, for a 20% improvement in the EU’s energy eciency, and for 20% of the EU energy share to be produced from renewable sources [6]. Regarding the post-2020 era, the European Commission has already set new targets for the year 2030, which aim at a 40% reduction in the EU’s greenhouse gas emissions compared to 1990 levels, a 27% improvement in the EU’s energy eciency and for 27% of the EU’s energy share to be produced from renewable sources [7]. The Commission is also committed by 2050 to reduce its greenhouse gas emissions by 80–95% compared to 1990 Appl. Sci. 2019, 9, 2462; doi:10.3390/app9122462 www.mdpi.com/journal/applsci Appl. Sci. 2019, 9, 2462 2 of 16 levels [7]. Given that buildings are responsible for 40% of the total primary energy needs in the EU [8], the development of e ective alternative energy solutions for buildings is imperative. This is complemented by the Energy Performance of Buildings Directive (EPBD) [9], as well as by the Directive (EU) 2018/2001 of the European Parliament and of the Council on the promotion of the use of energy from renewable sources [10], which require Renewable Energy Sources (RES) to be actively promoted against the conventional fossil fuels that are used in buildings. The increasing role and incentives given to renewable energy sources through the European legal framework, and the fact that solar energy accounted for the 21.9% of the primary renewables production in 2017 in the southern EU countries [11], mean that Solar Thermal Systems (STSs) and Photovoltaics (PVs) will play a key role in buildings, as they contribute directly to their heating and cooling loads, as well as to their supply of electricity and hot water [8]. At the same time, other more specific solar systems, such as polymethylmethacrylate (PMMA) fibers [12] and heliostats for the concentration of solar energy [13], could also contribute in that respect. Thus, the integration of active solar systems into buildings is coming to the fore, since, according to Hestnes [14], buildings should be able to exploit solar energy for energy generation through the integration of active solar features. This results in an e ective contribution to the reduction of energy needs in the building sector, through onsite production of energy [8]. The key role of building-integrated solar active systems in the architectural design of buildings is increasingly becoming evident, especially in countries where high values of annual solar energy are recorded [15,16]. Based on the above, and on the fact that the European Union’s legal framework encourages member states to require the use of energy from renewable sources in new and existing buildings [9,10] in their building regulations and codes, several countries have included in their legislation an indirect obligation to integrate active solar energy systems in buildings. For example, the Regulatory Administrative Act 119/2016 [17] of Cyprus requires that at least 25% of the total primary energy that residential buildings consume should come from RES. However, the participation of building-integrated active solar systems in building design considers additional design parameters. This is because the design and construction of a sustainable, energy-ecient and environmentally friendly building essentially requires a holistic approach to design [18–21]. Specifically, the use of solar energy is one of the key components of the holistic approach to the environmental design issue, which has three prongs: bioclimatic design, the design of energy-ecient structures and the ecological approach to the design. The first two di er in their approach to the subject, since the first deals with passive issues (e.g., geometry, orientation, placements) and the second with energy issues (e.g., energy production). The third tries to deal with the minimisation of the building’s ecological footprint [22–24]. All the above demonstrate that the integration of active solar systems into buildings adds various parameters to the architectural design process, thus transforming it into an interdisciplinary field. Particularly, this is analysed with respect to issues related to bioclimatic design and the passive role that active solar systems play in the building, issues that have to do with their active role and are related to their energy production potential and issues that have to do with construction materials and their ecological sensitivity [25]. In this paper, we attempt to simplify this interdisciplinary design process through the creation of a roadmap that can be used as a design tool in the early stages of design. 2. Literature Review The subject of the integration of active solar systems into buildings and research on it is an original application, although not in its entirety. This is because the analysis of a building’s construction and the addition of a number of technological systems to it is usual in the contemporary construction industry, since a lot of di erent systems have been integrated into recent buildings. The research focus in this paper is the integration of active solar systems into buildings and their sustainable operation, since, in their majority of cases, they have not been built for this purpose and their ideal operating Appl. Sci. 2019, 9, 2462 3 of 16 conditions di er, in most cases, from the conditions under which they are called upon to perform, as functional parts of the building shell. There are already examples of applications where original design process solutions were applied to ensure that the systems would function properly. The integration of such a system in a building requires a modification of the design process in such a way that the integrated system and the building itself can operate in conjunction. The lack of a standardised roadmap for such applications forces design teams to apply their own unique design approach to ensure the system’s viability in each case. Vassiliades [26] studied and presented 43 case studies of buildings with integrated active solar systems. These applications have been extensively analysed separately as well as comparatively. The analysis considered both the buildings and the systems in terms of their type, the type of their integration, their originality, the way they were applied/integrated and the challenges faced therein. Subsequently, various construction issues were illustrated, and aspects of integration according to the demands of each case were highlighted, to present a suggested design strategy for every case. Considering the above, an investigation shows that the literature on the development of a design tool/roadmap for the integration of active solar systems into buildings is rather limited. In the framework of the aforementioned research, an early attempt was made to create a design/research roadmap, which was based on the research process that was presented in that dissertation. In particular, the investigation started at the urban scale, progressed to the scale of the building and ended with considerations relating to the construction of components making up the shell of the building. The goal was to achieve sustainable building integration by avoiding several passive and technical issues that could a ect the eciency and viability of the systems and of the building itself. Most of the related work deals with the development of design tools on similar research topics. In the solar urban design field, Lobaccaro et al. [27] and Lobaccaro and Frontini [28] have tried to create design tools that optimise the volume and shape of buildings in existing urban areas to harvest as much insolation as possible and minimise their negative impact on the adjacent lots, whilst Lobaccaro et al. [29] dealt with the estimation of the amount of energy that can be produced from solar envelopes in urban environments. Amado and Poggi [30] promote the energy transition to solar energy in the urban environment using a Geographical Urban Units Delimitation (GUUD) model related to solar potential. The methodology of this research consists of a novel design tool and proposes five steps: an analysis of the urban system, parametric urban modelling, estimation of the solar potential, a forecast of electricity consumption and the application of an urban energy balance. The workflow of the process consists of a combination of geographic information system (GIS) techniques with parametric modelling and analysis of the solar potential. In the building design field, Attia et al. [31] created a design tool that performs a sensitivity analysis of the possible variations in the design parameters and elements of nearly zero energy buildings (NZEBs) during the early design phases in hot climates, aiming to provide information on the period prior to decision-making for NZEB design. Several researchers have developed design optimisation tools that aim to address specific aspects of building design. Specifically, a number of studies [32–39] have dealt with the creation of design tools that optimise the geometric form of the building and its related components in order to shape energy-ecient and sustainable architecture solutions or to improve the values of specific parameters in the overall design of the building. Related work has also been done for the creation of design optimisation tools that address heating, ventilation and air conditioning (HVAC) system parameters and other similar active energy systems [40–42]. The work of Attia et al. [43] summarises a study undertaken to reveal potential challenges and opportunities for integrating optimisation tools in NZEB design. The development of design tools and roadmaps is a part of several research and development procedures that aim to optimise related processes in the fields of computing and software architecture [44–46]. At the same time, due to recent strategic shifts away from simply achieving feasibility to achieving optimisation [47], and the benefits obtained by facilities management companies, a process-based approach is well-recognised in the business literature [48,49], and roadmaps for Appl. Sci. 2019, 9, 2462 4 of 16 Appl. Sci. 2019, 9, x FOR PEER REVIEW 4 of 15 research and development have been created [47,48,50,51]. Roadmaps in the field of production and manufacturing manufacturing a aim im to optimise processes a to optimise processes and nd products products [ [5 52 2– –5 56 6] ].. F Finally inally,, t the he r range ange o of f r roadmaps oadmaps t that hat are currently in use is shown in the work of Alturki et al. [57], who propose a structured and detailed are currently in use is shown in the work of Alturki et al. [57], who propose a structured and detailed design design scienc science e ro roadmap admap to to conduct conduct des design ign scscience ience rer search esearch that that ma may y be be used used as a gen as a general eral guide guide for for rese rarchers. esearchers. 2.1. Prototype Systems 2.1. Prototype Systems There are also examples of research teams that have resolved the construction issues arising There are also examples of research teams that have resolved the construction issues arising from from the integration of prototype active solar systems into buildings. In this context, work was done the integration of prototype active solar systems into buildings. In this context, work was done during during COST Action TU1205—BISTS [58] by five research teams that developed five di erent solar COST Action TU1205—BISTS [58] by five research teams that developed five different solar systems, systems, the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal Thermal (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the the Trapeze Flat-Plate Solar Thermal Collectors (FPSTC), and proposed viable solutions for building Trapeze Flat-Plate Solar Thermal Collectors (FPSTC), and proposed viable solutions for building integration (Figure 1). For each system, a specialised design and fabrication solution was adopted that integration (Figure 1). For each system, a specialised design and fabrication solution was adopted focused on the sustainable operation of both the system and the building. that focused on the sustainable operation of both the system and the building. Figure 1. Visualisations of the five systems that were applied to a three-storey building. From the left: Figure 1. Visualisations of the five systems that were applied to a three-storey building. From the left: the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal the Modular Intergraded Solar/Thermal Flat Plate Collector, the Hybrid Photovoltaic/Solar Thermal (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the (HyPVT), the Concentrating Photovoltaic/Thermal Glazing (CoPVTG), the Solar Plenum and the Trapeze Flat-Plate Solar Thermal Collectors (FPSTC). Trapeze Flat-Plate Solar Thermal Collectors (FPSTC). 2.2. Summary of Main Points 2.2. Summary of Main Points The key findings that summarise the main points and limitations of the previous works may be The key findings that summarise the main points and limitations of the previous works may be enumerated as follows: enumerated as follows: The current research is focused on the integration of active solar systems into buildings and their • The current research is focused on the integration of active solar systems into buildings and their sustainable operation, since, in the majority of cases, they have not been built for this purpose. sustainable operation, since, in the majority of cases, they have not been built for this purpose. The lack of a standardised roadmap forces design teams to apply their own unique design • The lack of a standardised roadmap forces design teams to apply their own unique design approach for each di erent case. approach for each different case. • The The resea researrch ch tea team m m made ade an an ea early rly attempt attempt to to cr create a design/re eate a design/resear search ch ro roadmap, admap, wh which ich was was presented in previous research. presented in previous research. • There have been attempts to develop design tools for similar research topics, which aim to There have been attempts to develop design tools for similar research topics, which aim to optimise the optimise the shape and shape an geometry d ,geometry, or or to improve tothe improve t values h of e specific values of parameters specific pain ramet the overall ers in th design e overal of l design of buildings and building clusters. buildings and building clusters. • Design tools and roadmaps can also be encountered in several research and development Design tools and roadmaps can also be encountered in several research and development procedures that aim to optimise related processes in the fields of computing, production, procedures that aim to optimise related processes in the fields of computing, production, manufacturing and design science research. manufacturing and design science research. 3. Methodology 3. Methodology In order to become science, novel procedures, such as the proposed roadmap, need to be tested in In order to become science, novel procedures, such as the proposed roadmap, need to be tested real conditions, in this case with the application of the proposed methodology to case studies. Since in real conditions, in this case with the application of the proposed methodology to case studies. Since related examples and the literature on the investigation of building-integrated active solar systems are related examples and the literature on the investigation of building-integrated active solar systems are rather limited [59], in contrast to the corresponding applied methodologies, the proposed methodology was developed based on a literature analysis, and on how the design/research teams in the various case studies designed and integrated the active solar energy systems into model Appl. Sci. 2019, 9, x FOR PEER REVIEW 5 of 15 buildings. The research team chose to use these specific research case studies instead of others in the private sector because they were developed under controlled conditions with a very specific Appl. Sci. 2019, 9, 2462 5 of 16 methodological course for each case. Specifically, the methodology is an evolution of Vassiliades’s research [26] for the development of a novel roadmap. That work was initially based on the collection rather limited [59], in contrast to the corresponding applied methodologies, the proposed methodology of relevant literature and on the current state-of-the-art, as well as an analysis of the integration of was developed based on a literature analysis, and on how the design/research teams in the various case active solar systems at all design scales, including the urban scale, the building scale and the scale of studies designed and integrated the active solar energy systems into model buildings. The research the unit system. Thus, an early roadmap was developed that proposes a path that a designer may team chose to use these specific research case studies instead of others in the private sector because follow for addressing the integration of an active solar system into a building. they were developed under controlled conditions with a very specific methodological course for each In the roadmap above, five design/research steps were proposed, which constitute a design case. Specifically, the methodology is an evolution of Vassiliades’s research [26] for the development process for achieving a system’s integration (Figure 2). The first step is a passive energy analysis of of a novel roadmap. That work was initially based on the collection of relevant literature and on the the building, or the cluster of buildings, at an urban level. The aim is to identify the ideal facade or current state-of-the-art, as well as an analysis of the integration of active solar systems at all design facades within which the active system may be integrated with the least likely propagation of scales, including the urban scale, the building scale and the scale of the unit system. Thus, an early interfering shadows that could affect its performance. roadmap was developed that proposes a path that a designer may follow for addressing the integration After selecting the buildings and their related facades, the second step proposes an energy of an active solar system into a building. efficiency study of the building under construction or major renovation in order to determine its In the roadmap above, five design/research steps were proposed, which constitute a design process passive and active energy characteristics. Specifically, the designer must identify the building’s needs for achieving a system’s integration (Figure 2). The first step is a passive energy analysis of the building, in terms of transparency, thermal insulation, weather proofing, noise reduction and shading. At the or the cluster of buildings, at an urban level. The aim is to identify the ideal facade or facades within same time, the building’s energy needs for heating, cooling, domestic hot water and lighting should which the active system may be integrated with the least likely propagation of interfering shadows also be analysed. This is done so that one is able to select the appropriate active system that may that could a ect its performance. provide the required integration method. Figure 2. The roadmap for the integration of an active solar system into a building. Figure 2. The roadmap for the integration of an active solar system into a building. After selecting the buildings and their related facades, the second step proposes an energy In the third step, a digital model of the building with the integrated system is created, and its eciency study of the building under construction or major renovation in order to determine its energy production is simulated. The aim is to make sure that the appropriate system is chosen and passive and active energy characteristics. Specifically, the designer must identify the building’s needs that it can meet the necessary energy needs. in terms of transparency, thermal insulation, weather proofing, noise reduction and shading. At the In the fourth step, an energy efficiency study of the building with its integrated system is same time, the building’s energy needs for heating, cooling, domestic hot water and lighting should performed in order to measure its influence on the building’s passive and active energy also be analysed. This is done so that one is able to select the appropriate active system that may characteristics. If the results are satisfactory, and the system selection is correct, one may proceed to provide the required integration method. step five, or, in the reverse, one repeats the process from step three until the needs are met. In the third step, a digital model of the building with the integrated system is created, and its In the fifth and final step, the designer deals with the integration of the selected system into the energy production is simulated. The aim is to make sure that the appropriate system is chosen and building and the configuration of the construction details. These construction details aim to expose that it can meet the necessary energy needs. possible issues that may be related to the system and have to do with piping, wiring or other technical In the fourth step, an energy eciency study of the building with its integrated system is performed issues related to each incorporated technology. in order to measure its influence on the building’s passive and active energy characteristics. If the Looking back at the practices presented and based on the roadmap above, a common design results are satisfactory, and the system selection is correct, one may proceed to step five, or, in the strategy was derived that was followed in order to form the proposed design tool. This is based on the reverse, one repeats the process from step three until the needs are met. five steps presented above and aims to create a comprehensive and functional design tool. In addition In the fifth and final step, the designer deals with the integration of the selected system into the to the facilitating the design work, thereby saving time and money, the originality of this tool is based building and the configuration of the construction details. These construction details aim to expose on the fact that it takes an important step in standardising these studies. On the other hand, the possible issues that may be related to the system and have to do with piping, wiring or other technical implementation of this roadmap by a number of researchers and designers will make cross-referencing issues related to each incorporated technology. possible between different applications, and additionally it will enable us to create a database of Looking back at the practices presented and based on the roadmap above, a common design buildings with integrated solar systems that could provide designers with options at the front end of strategy was derived that was followed in order to form the proposed design tool. This is based on the the construction and environmental systems detailing process. five steps presented above and aims to create a comprehensive and functional design tool. In addition to the facilitating the design work, thereby saving time and money, the originality of this tool is based Appl. Sci. 2019, 9, 2462 6 of 16 on the fact that it takes an important step in standardising these studies. On the other hand, the implementation of this roadmap by a number of researchers and designers will make cross-referencing possible between di erent applications, and additionally it will enable us to create a database of buildings with integrated solar systems that could provide designers with options at the front end of the construction and environmental systems detailing process. It should be noted that, in order for this roadmap to be used, solar energy must have been chosen as the main renewable energy source of the building, and the use of a building-integrated active solar system must also have been chosen. Otherwise, the methodological process may be very di erent, since it will follow the characteristics and requirements of each case. 4. Roadmap Development As was mentioned in the methodology section, the full development of the roadmap is performed by analysing each step based on the work done by other researchers and the full development of the process that needs to be followed at each step. 4.1. Step 1—Passive Analysis Step 1 of the roadmap deals with the passive energy analysis of the building, or cluster of buildings, at an urban level. The process is based on previous work by Savvides et al. [60,61], and starts with the three-dimensional representation and modelling of the building, or building cluster, at an urban level. This model is used for simulations that should be made in order to calculate the solar incidence on a building’s shell. The total insolation value represents a first attempt to quantify the building’s solar potential, while the three-dimensional model can also provide an accurate estimation of any interfering shadows that could a ect the building’s solar performance. Subsequently, the incident radiation on a building’s shell is thoroughly analysed, which provides a first indication of the surfaces on which an active solar system could be viably integrated in terms of energy production. It also an early attempt to identify which surfaces of a building might require passive solar protection to avoid possible overheating issues. All the above help in the initial optimisation of a building’s geometry. At the same time, because incident radiation may not be used on its own to fully determine the viability of a building to reasonably accept the integration of an active solar system, the least possible amount of incident radiation on a surface that would allow for this should be calculated. Vassiliades [26] reports that a building may exhibit a high value for average incident radiation, but a number of its constituent facades might exhibit comparatively lower incidence values, rendering the integration of an active solar system non-viable, a fact exhibited by an equation that provides the lowest radiation needed for a viable integration of an active solar system on a surface. The parameters for that figure’s calculation is the system’s performance, the energy cost in euros per kWh, the years for repayment and the system installation cost in euros per square meter of installation. The equation is presented below: 0 1 kWh B C System Installation and Maintenance Cost B 2 C m m B C B C Radiation =   . (1) B C @ A yr System Per f ormance  Energy Cost  Years f or Repayment kWh The first methodological step of the roadmap described above is presented in Figure 3. Appl. Sci. 2019, 9, x FOR PEER REVIEW 6 of 15 It should be noted that, in order for this roadmap to be used, solar energy must have been chosen as the main renewable energy source of the building, and the use of a building-integrated active solar system must also have been chosen. Otherwise, the methodological process may be very different, since it will follow the characteristics and requirements of each case. 4. Roadmap Development As was mentioned in the methodology section, the full development of the roadmap is performed by analysing each step based on the work done by other researchers and the full development of the process that needs to be followed at each step. 4.1. Step 1—Passive Analysis Step 1 of the roadmap deals with the passive energy analysis of the building, or cluster of buildings, at an urban level. The process is based on previous work by Savvides et al. [60,61], and starts with the three-dimensional representation and modelling of the building, or building cluster, at an urban level. This model is used for simulations that should be made in order to calculate the solar incidence on a building’s shell. The total insolation value represents a first attempt to quantify the building’s solar potential, while the three-dimensional model can also provide an accurate estimation of any interfering shadows that could affect the building’s solar performance. Subsequently, the incident radiation on a building’s shell is thoroughly analysed, which provides a first indication of the surfaces on which an active solar system could be viably integrated in terms of energy production. It also an early attempt to identify which surfaces of a building might require passive solar protection to avoid possible overheating issues. All the above help in the initial optimisation of a building’s geometry. At the same time, because incident radiation may not be used on its own to fully determine the viability of a building to reasonably accept the integration of an active solar system, the least possible amount of incident radiation on a surface that would allow for this should be calculated. Vassiliades [26] reports that a building may exhibit a high value for average incident radiation, but a number of its constituent facades might exhibit comparatively lower incidence values, rendering the integration of an active solar system non-viable, a fact exhibited by an equation that provides the lowest radiation needed for a viable integration of an active solar system on a surface. The parameters for that figure’s calculation is the system’s performance, the energy cost in euros per kWh, the years for repayment and the system installation cost in euros per square meter of installation. The equation is presented below: 𝑘𝑊ℎ € 𝐼𝑛𝑠𝑡𝑖𝑎 𝑎𝑛𝑑 𝑀𝑎𝑖𝑛𝑡 𝐶𝑜𝑠𝑡 𝑚 𝑚 𝑅𝑎𝑑𝑖𝑎𝑡𝑖𝑜𝑛 = . (1) 𝑚 𝑃𝑒𝑟𝑓𝑜 × 𝐶𝑜𝑠𝑡 × 𝑌 𝑓𝑜𝑟 𝑅𝑒𝑝𝑎𝑦𝑚𝑒 𝑘𝑊ℎ Appl. Sci. 2019, 9, 2462 7 of 16 The first methodological step of the roadmap described above is presented in Figure 3. Figure 3. The basic methodological steps for the first step of the roadmap, which deals with the passive Figure 3. The basic methodological steps for the first step of the roadmap, which deals with the Appl. Sci. 2019, 9, x FOR PEER REVIEW 7 of 15 energy analysis of the building, or cluster of buildings, at an urban level. passive energy analysis of the building, or cluster of buildings, at an urban level. 4.2. 4.2. Step Step 22—Ener —Energy gy Efficiency Eciency Study Study Step 2 of the roadmap deals with the energy eciency study of the building under construction in Step 2 of the roadmap deals with the energy efficiency study of the building under construction or in order t der to determine o determine it its passive s passive and and active active energy ch energy characteristics. aracteristics. The process st The process starts arts wi with th the ana the analysis lysis and determination of the thermal insulation, weather proofing and noise reduction requirements and and determination of the thermal insulation, weather proofing and noise reduction requirements and characteristics characteristics of of t the he b building. uilding. These These ch characteristics aracteristics n need eed tto o b be e def defined ined b because ecause t they hey cou coul ld d ha have ve an an impact on the choice of the active solar system to be integrated into the building. impact on the choice of the active solar system to be integrated into the building. Subsequently Subsequently ,,several several simu simulations latiarons e performed are perftoormed determine to determi several quanti ne several tative q characteristics uantitative of the building, such as the energy needs of the building and, specifically, its needs for heating, cooling, characteristics of the building, such as the energy needs of the building and, specifically, its needs for lighting heating, cool and domestic ing, lightihot ng and domesti water. Any c p ossible hot water. ener An gyy poss production ible enby ergy pro nonintegrated duction by nonintegrated active systems is also simulated at this stage in order to determine the energy balance of the building. active systems is also simulated at this stage in order to determine the energy balance of the building. Shading Shading and and insolation insolation of of the the buil building’s ding’s envelope envelope,, and and espec especially ially of of it its s g glazed lazed s surfaces, urfaces, is is t then hen simulated since they significantly contribute to the thermal performance of the building. This evaluation simulated since they significantly contribute to the thermal performance of the building. This could evaluation co be achieved uld be thr achiev ough ed th the use rough of shading the use of sh masks. ading masks. A visual comfort analysis follows, since it is an essential parameter of human comfort, while it A visual comfort analysis follows, since it is an essential parameter of human comfort, while it may may a also lso be d be defined efined as as a a s subjective ubjective condi condition tion of wel of well-being l-being in in an an in indoor door built built envi envir ronment onment [6 [62 2]. ]. It It is is used to investigate visual comfort of the occupants in terms of natural lighting and glare issues [63] as used to investigate visual comfort of the occupants in terms of natural lighting and glare issues [63] well as we as ll in as terms in terms of visual connection of visual connection with with the exter the exterior ienvir or env onment. ironment. The methodology that is followed in this step has been extensively presented by Vassiliades et al. [25], The methodology that is followed in this step has been extensively presented by Vassiliades et and al. [2 aims 5], and at the aim determination s at the determ of inat the ion o passive f the p and ass active ive and character active ch istics aract ofethe ristics o building f the b that uild a ing ect tthe hat choice of the active solar system. affect the choice of the active solar system. The The second second methodological methodological step of the step of the r roadm oadmap ap described described above above is is presented presented in in Figure 4. Figure 4. Figure 4. The basic methodological steps for the second step of the roadmap, which deals with the Figure 4. The basic methodological steps for the second step of the roadmap, which deals with the energy eciency study of the building under construction. energy efficiency study of the building under construction. 4.3. Step 3—Integration of an Active System Step 3 of the roadmap deals with the integration of a selected active solar system and a simulation of its energy production in order to confirm that it may cover the energy needs of the building and has the expected passive behavior as determined in Step 2. The process starts with the integration of a system on a three-dimensional model of a building to identify possible geometrical as well as morphological issues that may be optimised at this early stage. Subsequently, the computational calculations of a system’s energy production are performed using appropriate software. The software can be selected by the designer as per the requirements of the project. However, it is important to confirm the validity of the simulation results by performing pilot simulations using a well-established software, e.g., TRNSYS [64]. In order to obtain accurate results, it is important to use the technical characteristics of the specific models of used active solar systems. It should also be noted that, for evaluation purposes, the energy production of all used systems should be given in the same unit notations. Similarly, all of the energy production and consumption values should be converted into primary energy values following the energy performance of buildings Directive (2018/844/EU) [9] in order to allow for comparability between buildings and help facilitate their subsequent certification. Similar work that calculates the energy production of building-integrated active solar systems via computational simulations has been performed by Vassiliades et al. [25,26,65,66]. Finally, any chosen design should be implemented without violating applicable regulations. The third methodological step of the roadmap described above is presented in Figure 5. 𝑛𝑡 𝑒𝑎𝑟𝑠 𝐸𝑛𝑒𝑟𝑔𝑦 𝑐𝑒𝑟𝑚𝑎𝑛 𝑆𝑦𝑠𝑡𝑒 𝑦𝑟 𝑐𝑒𝑎𝑛𝑒𝑛 𝑙𝑙𝑎𝑡𝑜𝑛 𝑒𝑚𝑠𝑡𝑆𝑦 Appl. Sci. 2019, 9, 2462 8 of 16 4.3. Step 3—Integration of an Active System Step 3 of the roadmap deals with the integration of a selected active solar system and a simulation of its energy production in order to confirm that it may cover the energy needs of the building and has the expected passive behavior as determined in Step 2. The process starts with the integration of a system on a three-dimensional model of a building to identify possible geometrical as well as morphological issues that may be optimised at this early stage. Subsequently, the computational calculations of a system’s energy production are performed using appropriate software. The software can be selected by the designer as per the requirements of the project. However, it is important to confirm the validity of the simulation results by performing pilot simulations using a well-established software, e.g., TRNSYS [64]. In order to obtain accurate results, it is important to use the technical characteristics of the specific models of used active solar systems. It should also be noted that, for evaluation purposes, the energy production of all used systems should be given in the same unit notations. Similarly, all of the energy production and consumption values should be converted into primary energy values following the energy performance of buildings Directive (2018/844/EU) [9] in order to allow for comparability between buildings and help facilitate their subsequent certification. Similar work that calculates the energy production of building-integrated active solar systems via computational simulations has been performed by Vassiliades et al. [25,26,65,66]. Finally, any chosen design should be implemented without violating applicable regulations. The third methodological step of the roadmap described above is presented in Figure 5. Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the integration of the selected active solar system and the simulation of its energy production. integration of the selected active solar system and the simulation of its energy production. 4.4. Step 4—Energy Eciency Study Subsequent to System Integration 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration Step 4 of the roadmap deals with the energy eciency study of the building under construction, Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with with the integrated system, in order to show its influence on the building’s passive and active the integrated system, in order to show its influence on the building’s passive and active energy energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements requirements and the energy production of a building are simulated in order to determine the energy and the energy production of a building are simulated in order to determine the energy balance of said balance of said building, followed by shading and insolation simulations and a visual comfort analysis building, followed by shading and insolation simulations and a visual comfort analysis with the use of with the use of the same methodological process as in Step 2. The di erence in this step is that, the same methodological process as in Step 2. The difference in this step is that, if the results of the if the results of the simulations are not as expected, the designer may return to Step 3 and try a simulations are not as expected, the designer may return to Step 3 and try a different system. di erent system. The fourth methodological step of the roadmap is presented in Figure 6. The fourth methodological step of the roadmap is presented in Figure 6. Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the energy efficiency study of the building under construction, with the integrated system. 4.5. Step 5—Integration of the Selected System into the Building Step 5 of the roadmap deals with the integration of the selected system into the building and the configuration of construction details. The process starts with the design of the structural system for the support of the solar system. Subsequently, internal control points may be placed in selected interior locations, from which visual inspections and repairs to piping connections may be made. After that, depending on the integrated system and the possibility of the need for weather protection, the continuity of the system array should be ensured in order to provide the desired thermal insulation and waterproofing. Regarding connection to technical services (electromechanical and water supply), the connectedness to the system’s modules should be anticipated. With regard to piping between two modules that are placed at a distance from service outlets emanating from a mechanical room, these should be integrated using through-wall connections. The fifth methodological step of the roadmap is presented in Figure 7. Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the integration of the selected system into the building and design of the construction details. Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Appl. Sci. 2019, 9, x FOR PEER REVIEW 8 of 15 Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the Figure 5. The basic methodological steps for the third step of the roadmap, which deals with the integration of the selected active solar system and the simulation of its energy production. integration of the selected active solar system and the simulation of its energy production. 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration 4.4. Step 4—Energy Efficiency Study Subsequent to System Integration Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with Step 4 of the roadmap deals with the energy efficiency study of the building under construction, with the integrated system, in order to show its influence on the building’s passive and active energy the integrated system, in order to show its influence on the building’s passive and active energy characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements characteristics. The process is very similar to Step 2 of the roadmap. Specifically, the energy requirements and the energy production of a building are simulated in order to determine the energy balance of said and the energy production of a building are simulated in order to determine the energy balance of said building, followed by shading and insolation simulations and a visual comfort analysis with the use of building, followed by shading and insolation simulations and a visual comfort analysis with the use of the same methodological process as in Step 2. The difference in this step is that, if the results of the the same methodological process as in Step 2. The difference in this step is that, if the results of the simulations are not as expected, the designer may return to Step 3 and try a different system. simulations are not as expected, the designer may return to Step 3 and try a different system. Appl. Sci. 2019, 9, 2462 9 of 16 The fourth methodological step of the roadmap is presented in Figure 6. The fourth methodological step of the roadmap is presented in Figure 6. Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the Figure 6. The basic methodological steps for the fourth step of the roadmap, which deals with the energy efficiency study of the building under construction, with the integrated system. energy eciency study of the building under construction, with the integrated system. energy efficiency study of the building under construction, with the integrated system. 4.5. Step 5—Integration of the Selected System into the Building 4.5. Step 5—Integration of the Selected System into the Building 4.5. Step 5—Integration of the Selected System into the Building Step Step 5 5 of of the roa the roadmap dmap deals wi deals with th the i the integration ntegration of of th the e selected selected system into the buildin system into the building g and t and the he Step 5 of the roadmap deals with the integration of the selected system into the building and the configuration of construction details. The process starts with the design of the structural system for the configuration of construction details. The process starts with the design of the structural system for configuration of construction details. The process starts with the design of the structural system for support the support of the of t solar he so system. lar syst Subsequently em. Subsequent , internal ly, intcontr ernal cont ol points rol p may oints be ma placed y be place in selected d in se interior lected the support of the solar system. Subsequently, internal control points may be placed in selected locations, from which visual inspections and repairs to piping connections may be made. interior locations, from which visual inspections and repairs to piping connections may be made. interior locations, from which visual inspections and repairs to piping connections may be made. After After tha that, t, dependi depending ng on the on the integrated integrated system system an and d t the he poss possibility ibility of of t the he ne need ed for for we weather ather After that, depending on the integrated system and the possibility of the need for weather protection, the continuity of the system array should be ensured in order to provide the desired thermal protection, the continuity of the system array should be ensured in order to provide the desired protection, the continuity of the system array should be ensured in order to provide the desired insulation thermal ins and ulatwaterpr ion and oofing. waterproofing. thermal insulation and waterproofing. Regarding connection to technical services (electromechanical and water supply), the connectedness Regarding connection to technical services (electromechanical and water supply), the Regarding connection to technical services (electromechanical and water supply), the to connectednes the system’s s to the sy modulesstem’s module should be antic s ipated. should be With an rti egar cipa dted. Wi to piping th rega between rd to p two ipimodules ng between two that are connectedness to the system’s modules should be anticipated. With regard to piping between two placed at a distance from service outlets emanating from a mechanical room, these should be integrated modules that are placed at a distance from service outlets emanating from a mechanical room, these modules that are placed at a distance from service outlets emanating from a mechanical room, these using should thr be ough-wall integrated connections. using through-wall connections. should be integrated using through-wall connections. The fifth methodological step of the roadmap is presented in Figure 7. The fifth methodological step of the roadmap is presented in Figure 7. The fifth methodological step of the roadmap is presented in Figure 7. Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the Figure 7. The basic methodological steps for the fifth step of the roadmap, which deals with the integration of the selected system into the building and design of the construction details. integration of the selected system into the building and design of the construction details. integration of the selected system into the building and design of the construction details. 4.6. Formulation of a Complete Roadmap Based on the early roadmap that was presented above, and in combination with extensive analysis at each step, a complete roadmap was created and is shown in Figure 8. The development of this design methodology may be followed by designers for the integration of active solar systems into buildings. Moving from step to step, the designer may apply the proposed methodology to integrate a solar system within new or existing buildings. It should be noted that the roadmap is a general methodology that may be applied in the majority of cases. However, it is at the discretion of each designer to apply it accordingly and to use it based on the specific circumstances that apply in each case. Appl. Sci. 2019, 9, x FOR PEER REVIEW 9 of 15 4.6. Formulation of a Complete Roadmap Based on the early roadmap that was presented above, and in combination with extensive analysis at each step, a complete roadmap was created and is shown in Figure 8. The development of this design methodology may be followed by designers for the integration of active solar systems into buildings. Moving from step to step, the designer may apply the proposed methodology to integrate a solar system within new or existing buildings. It should be noted that the roadmap is a general methodology that may be applied in the majority of cases. However, it is at the discretion of each designer Appl. Sci. 2019, 9, 2462 10 of 16 to apply it accordingly and to use it based on the specific circumstances that apply in each case. Figure 8. Illustration of the proposed methodology for a roadmap pertaining to the integration of active solar systems into buildings. 5. Discussion and Conclusions The main aim of this research is to create a roadmap that proposes a design path that a designer may follow to integrate an active solar system into a building. The research is based on the work of Vassiliades [26], which represents an early attempt to create a roadmap to ensure the viability of Appl. Sci. 2019, 9, 2462 11 of 16 building-integrated active solar systems. In order to achieve this, a methodological procedure was developed as an extension to the aforementioned roadmap. Given that contemporary architectural and urban design strategies with regard to buildings and building clusters aim to achieve the smallest possible energy consumption, challenges arise from the potential for local energy production, which depends on the use of renewable energy, and is interpreted as solar energy in a number of countries in the EU, since it accounted for 6.4% of the primary renewables production in 2017 for the EU-28 and 21.9% of the primary renewables production in 2017 for the southern EU countries [11]. This is because the main driver of energy consumption in buildings is thermal comfort for users; an example of this is the fact that 49% of the total household energy consumption in the United States in 2005 came from space heating and cooling loads [67]. This is because energy demand for climate control and the level of indoor environmental comfort that is achieved are interrelated, such that a higher level of thermal comfort demands higher energy consumption and vice versa [68]. This may be balanced in a nearly zero energy building given an appropriate study of the building’s thermal comfort requirements and potential energy loads, which will lead to an appropriate selection of the type and size of the renewable system. Given that solar energy is the renewable energy that was chosen to cover the building’s energy needs, the presented research aims to simplify and standardise the process of integrating an active solar system into a building in order to ensure that its energy and environmental behaviour complies with legislation and good sustainable urban and building design practices. The originality of this research is based on the fact that, although a number of other design tools/roadmaps can be found in the literature, none of them focuses on building integration. At the same time, the research complements the work and findings of other researchers on the subject [26–30], since it focuses on the sustainable use of building-integrated active solar systems in terms of their energy production potential. Specifically, the proposed toolset, which optimises a building’s massing to harvest as much insolation as possible and promotes electricity production by the application of solar energy, is highly supplemented by the proposed roadmap, given that, in Step 1, the passive energy analysis of the building, or cluster of buildings, aims to confirm the ideal façade orientation for sustainable integration of active solar systems, and also aims to confirm that the selected massing configuration results in the least likely propagation of interfering shadows that could a ect its performance. At the same time, Steps 2–4 deal with the active and passive behavior of the building’s energy and environmental control performance, as well as with its energy production potential, which are dependent on its massing configuration. The research also supplements the work of researchers who have dealt with the creation of design tools that aim to optimise a specific aspect of a building design, or their geometric forms, in order to shape energy-ecient and sustainable architectural solutions [31–38]. This is demonstrated in Step 1 of the methodology, where an initial optimisation of the building’s geometry is proposed. A second prompt for the optimisation of the building’s geometry is referred to in Step 3 of the roadmap subsequent to the system’s integration into the building, and helps to identify possible geometrical issues that could be regulated at that point. Similarly, Steps 2–4 of the proposed roadmap, which outline the energy eciency studies to be performed before and after the integration of the system, extend and improve the work of researchers that have proposed design optimisation tools [40–43]. The final step of the roadmap focuses on that aspect, since it deals with the integration of the selected system into the building and the configuration of the construction details, aiming at the system’s viable and seamless operation. At the same time, it should be noted that, despite the di erence in the subject between this research and the work of other researchers [44–48,50,52–55] dealing with the development of roadmaps for the optimisation of related processes in the field of research and development and in the field of production and manufacturing, the work presented in this paper contributes to the wider field of technology as it proposes a standardisation process that relies on a variety of parameters that need to be approached in an interdisciplinary way by several di erent professionals and researchers. Thus, it contributes to the Appl. Sci. 2019, 9, 2462 12 of 16 minimisation of the study time needed for this kind of application by minimising the economic cost, confirming the contribution to sustainability of the integration of such systems into buildings, and reducing the risk of a potential investment in this type of building. The implementation of the roadmap also resolves issues and speeds up potential research work. Particularly, it was observed that, in the work done by COST Action TU1205—BISTS [58], where five research teams developed five di erent solar systems and proposed viable solutions for their integration into a building, each team applied a di erent and specialised design and manufacturing solution for each system. With the use of the roadmap in similar research works, the process is expected to be completed more quickly given that teams may focus on the performance of the system itself and not on the investigation of building integration processes, since this will be fundamentally resolved by the roadmap. However, in order to implement the roadmap, there is a need for researchers to take a common approach and use common units of measurement, as described in the third step of the methodology. It should further be noted that the implementation of the roadmap by a number of researchers and designers will make possible cross-referencing of the results between di erent applications and case studies, thereby leading to the creation of a database of buildings with integrated active solar systems. This database can then provide researchers and designers with an early picture of the choices they can make in their own studies and applications. Further Research Based on the current research, and with the creation and constant update of the aforementioned database, this roadmap could evolve into a more detailed tool that could provide further information to designers with the presentation of a comparative analysis and data for each design step, which may be based on corresponding design applications in the database. Furthermore, other possible research directions may entail the digitisation of the roadmap and the integration of computational processes in it, within which the designer may insert additional parameters that produce results without the need to use independent computing processes and software. Further research could recheck the roadmap and redefine its steps and parameters based on data and feedback from the implementation of this process in realised projects. Author Contributions: Investigation, C.V.; Methodology, C.V., S.K., A.S. and A.M.; Visualisation, C.V. and A.M.; Writing—Original Draft, C.V.; Writing—Review & Editing, C.V., S.K., A.S. and A.M. Funding: This research received no external funding. Conflicts of Interest: The authors declare that no potential conflicts of interest exist with respect to the research, authorship, and/or publication of this article. Abbreviations BISTS Building Integrated Solar Thermal Systems BIPVS Building Integrated Photovoltaic Systems GHI Global Horizontal Irradiance EU European Union EPBD Energy Performance of Buildings Directive RES Renewable Energy Sources STS Solar Thermal Systems PV Photovoltaics PMMA Polymethylmethacrylate GUUD Geographical Urban Units Delimitation GIS Geographic Information Systems NZEB Nearly Zero Energy Buildings HVAC Heating, ventilation, and air conditioning HyPVT Hybrid Photovoltaic/Solar Thermal CoPVTG Concentrating Photovoltaic/Thermal Glazing FPSTC Flat-plate Solar Thermal Collectors Appl. Sci. 2019, 9, 2462 13 of 16 References 1. Tombazis, A.N. Architectural design: A multifaceted approach. Renew. Energy 1994, 5, 893–899. [CrossRef] 2. Technology Roadmap, Solar Photovoltaic Energy. Int. Energy Agency 2014, 58. Available online: https://www.iea.org/publications/freepublications/publication/TechnologyRoadmapSolarPhotov oltaicEnergy_2014edition.pdf (accessed on 1 June 2015). 3. Yang, Y.; Wang, Q.; Xiu, D.; Zhao, Z.; Sun, Q. A building integrated solar collector: All-ceramic solar collector. Energy Build. 2013, 62, 15–17. [CrossRef] 4. Koroneos, C.; Spachos, T.; Moussiopoulos, N. Exergy analysis of renewable energy sources. Renew. Energy 2003, 28, 295–310. [CrossRef] 5. Painuly, J. Barriers to renewable energy penetration; a framework for analysis. Renew. Energy 2001, 24, 73–89. [CrossRef] 6. The 2020 Climate and Energy Package. European Commission Climate Action. 2009. Available online: http://ec.europa.eu/clima/policies/package/index_en.htm (accessed on 1 June 2015). 7. Climate Action. 2014. Available online: https://europa.eu/european-union/topics/climate-action_en (accessed on 26 April 2018). 8. Kalogirou, S.A. Building integration of solar renewable energy systems towards zero or nearly zero energy buildings. Int. J. Low Carbon Technol. 2013, 10, 379–385. [CrossRef] 9. Energy Performance of Buildings Directive (2018/844/EU); EU: Brussels, Belgium, 2018; pp. 75–91. 10. Directive (EU) 2018/2001 of the European Parliament and of the Council on the Promotion of the Use of Energy from Renewable Sources, 208AD. Available online: https://eur-lex.europa.eu/legal-content/EN/TXT/? uri=CELEX%3A32018L2001 (accessed on 2 May 2019). 11. Renewable Energy Statistics, Eurostat. 2019. Available online: https://ec.europa.eu/eurostat/statistics-expla ined/index.php/Renewable_energy_statistics#Wind_power_becomes_the_most_important_renewable_s ource_of_electricity (accessed on 15 March 2019). 12. Song, J.; Zhu, Y.; Tong, K.; Yang, Y.; Reyes-Belmonte, M.A. A note on the optic characteristics of daylighting system via PMMA fibers. Sol. Energy 2016, 136, 32–34. [CrossRef] 13. González-Pardo, A.; Cesar Chapa, S.; Gonzalez-Aguilar, J.; Romero, M. Optical performance of vertical heliostat fields integrated in building façades for concentrating solar energy uses. Sol. Energy 2013, 97, 447–459. [CrossRef] 14. Hestnes, A.G. Building Integration Of Solar Energy Systems. Sol. Energy 1999, 67, 181–187. [CrossRef] 15. Bougiatioti, F.; Michael, A. The architectural integration of active solar systems. Building applications in the Eastern Mediterranean region. Renew. Sustain. Energy Rev. 2015, 47, 966–982. [CrossRef] 16. Michael, A.; Bougiatioti, F.; Oikonomou, A. Less Could Be More: Architectural Integration of Active Solar Systems in Existing Urban Centres. In Proceedings of the 7th Mediterranean Conference and Exhibition on Power Generation, Transmission, Distribution and Energy Conversion (MedPower 2010), Aghia Napa, Cyprus, 7–10 November 2010; IET: Rautistrasse, Zürich, 2011. 17. K.D.P. 119/2016. The Laws that Regulate the Energy Eciency of Buildings, Cyprus. 2016. Available online: http://www.cea.org.cy/wp-content/uploads/2017/01/kdp-119-2016.pdf (accessed on 18 April 2018). 18. Hagemann, I.B. Solar Design in Architecture and Urban planning. In Proceedings of the Urban Planning-Sustainable Cities, Tokyo, Japan, 2005; pp. 1–10. 19. Vale, B.; Vale, R. Green Architecture: Design for a Sustainable Future; Thames & Hudson Ltd.: London, UK, 1991; ISBN 978-0500341179. 20. Philokyprou, M.; Savvides, A.; Michael, A.; Malaktou, E. Examination and assessment of the environmental characteristics of vernacular rural settlements. Three case studies in Cyprus. In Proceedings of the 5th International Conference on Vernacular Heritage, Sustainability and Earthen Architecture, Valencia, Spain, 11–13 September 2014; Taylor & Francis Group: Didcot, UK, 2014; pp. 613–618. 21. Knudstrup, M.-A.; Ring Hansen, H.T.; Brunsgaard, C. Approaches to the design of sustainable housing with low CO2 emission in Denmark. Renew. Energy 2009, 34, 2007–2015. [CrossRef] 22. Michael, A.; Phocas, M. Construction Design and Sustainability in Architecture: Integrating Environmental Education into Architectural Studies. J. Renew. Energy Power Q. 2012, 190–195. [CrossRef] 23. Phocas, M.; Michael, A.; Fokaides, P. Integrated Interdisciplinary Design: The Environment as Part of Architectural Education. Renew. Energy Power Q. J. 2011, 9, 937–941. [CrossRef] Appl. Sci. 2019, 9, 2462 14 of 16 24. Hui, S.C. Low energy building design in high density urban cities. Renew. Energy 2001, 24, 627–640. [CrossRef] 25. Vassiliades, C.; Michael, A.; Savvides, A.; Kalogirou, S. Improvement of passive behaviour of existing buildings through the integration of active solar energy systems. Energy 2018, 163, 1178–1192. [CrossRef] 26. Vassiliades, C. Building Integration of Active Solar Systems: Addressing all Scales of Intervention and Ensuring their Active and Passive Integration Viability in the Eastern Mediterranean Region. Ph.D. Thesis, University of Cyprus, Nicosia, Cyprus, 2018. 27. Lobaccaro, G.; Frontini, F.; Masera, G.; Poli, T. SolarPW: A New Solar Design Tool to Exploit Solar Potential in Existing Urban Areas. Energy Procedia 2012, 30, 1173–1183. [CrossRef] 28. Lobaccaro, G.; Frontini, F. Solar Energy in Urban Environment: How Urban Densification A ects Existing Buildings. Energy Procedia 2014, 48, 1559–1569. [CrossRef] 29. Lobaccaro, G.; Fiorito, F.; Masera, G.; Poli, T. District geometry simulation: A study for the optimization of solar facades in urban canopy layers. Energy Procedia 2012, 30, 1163–1172. [CrossRef] 30. Amado, M.; Poggi, F. Solar urban planning: A parametric approach. Energy Procedia 2014, 48, 539–1548. [CrossRef] 31. Attia, S.; Gratia, E.; De Herde, A.; Hensen, J.L.M. Simulation-based decision support tool for early stages of zero-energy building design. Energy Build. 2012, 49, 2–15. [CrossRef] 32. Caldas, L.G.; Norford, L.K. A design optimization tool based on a genetic algorithm. Autom. Constr. 2002, 11, 173–184. [CrossRef] 33. Turrin, M.; von Buelow, P.; Stou s, R. Design explorations of performance driven geometry in architectural design using parametric modeling and genetic algorithms. Adv. Eng. Inf. 2011, 25, 656–675. [CrossRef] 34. Caldas, L. GENE_ARCH: An Evolution-Based Generative Design System for Sustainable Architecture. In Intelligent Computing in Engineering and Architecture-EG-ICE 2006; Smith, I.F.C., Ed.; Springer: Berlin/Heidelberg, Germany, 2006; pp. 109–118. 35. Kämpf, J.H.; Robinson, D. Optimisation of building form for solar energy utilisation using constrained evolutionary algorithms. Energy Build. 2010, 42, 807–814. [CrossRef] 36. Charron, R.; Athienitis, A. The Use of Genetic Algorithms for a Net-Zero Energy Solar Home Design Optimisation Tool. In Proceedings of the PLEA2006, Geneva, Switzerland, 6–8 September 2006. Available online: https://www.researchgate.net/publication/241734123 (accessed on 11 October 2018). 37. Østergård, T.; Jensen, R.L.; Maagaard, S.E. Building simulations supporting decision making in early design—A review. Renew. Sustain. Energy Rev. 2016, 61, 187–201. [CrossRef] 38. Wang, W.; Rivard, H.; Zmeureanu, R. Floor shape optimization for green building design. Adv. Eng. Inf. 2006, 20, 363–378. [CrossRef] 39. Vallet, F.; Eynard, B.; Millet, D.; Mahut, S.G.; Tyl, B.; Bertoluci, G. Using eco-design tools: An overview of experts’ practices. Des. Stud. 2013, 34, 345–377. [CrossRef] 40. Huang, W.; Lam, H.N. Using genetic algorithms to optimize controller parameters for HVAC systems. Energy Build. 1997, 26, 277–282. [CrossRef] 41. Granlund, M.P.; Hasan, A.; Sirén, K.; Palonen, M.; Siren, K. A Genetic Algorithm for Optimization of Building Envelope and HVAC System Parameters. In Proceedings of the Eleventh International IBPSA Conference, Glasgow, Scotland, 27–30 July 2009. Available online: https://www.researchgate.net/publication/252429941 (accessed on 11 October 2018). 42. Hamdy, M.; Hasan, A.; Siren, K. Optimum design of a house and its HVAC systems using simulation-based optimisation. Int. J. Low Carbon Technol. 2010, 5, 120–124. [CrossRef] 43. Attia, S.; Hamdy, M.; O’Brien, W.; Carlucci, S. Assessing gaps and needs for integrating building performance optimization tools in net zero energy buildings design. Energy Build. 2013, 60, 110–124. [CrossRef] 44. Garlan, D. Software Architecture: A Roadmap, Pittsburgh. 2000. Available online: http://citeseerx.ist.psu.ed u/viewdoc/download?doi=10.1.1.571.8735&rep=rep1&type=pdf (accessed on 11 October 2018). 45. Srinivasan, M.K.; Sarukesi, K.; Keshava, A.; Revathy, P. eCloudIDS—Design Roadmap for the Architecture of Next-Generation Hybrid Two-Tier Expert Engine-Based IDS for Cloud Computing Environment; Springer: Berlin/Heidelberg, Germany, 2012; pp. 358–371. 46. Jennings, N.R.; Wooldridge, M. A Roadmap of Agent Research and Development. Auton. Agents Multi-Agent Syst. 1998, 1, 7–38. Available online: https://link.springer.com/content/pdf/10.1023/A:1010090405266.pdf (accessed on 11 October 2018). [CrossRef] Appl. Sci. 2019, 9, 2462 15 of 16 47. Embedded Systems Design: The ARTIST Roadmap for Research and Development; Bouyssounouse, B.; Sifakis, J. (Eds.) Springer: Berlin/Heidelberg, Germany, 2005; ISBN 9783540319733. 48. Corallo, A.; Margherita, A.; Scalvenzi, M.; Storelli, D. Building a process-based organization: The design roadmap at Superjet International. Knowl. Process Manag. 2010, 17, 49–61. [CrossRef] 49. Kim, K.; Lee, K. Collaborative product design processes of industrial design and engineering design in consumer product companies. Des. Stud. 2016, 46, 226–260. [CrossRef] 50. Daim, T.U.; Oliver, T. Implementing technology roadmap process in the energy services sector: A case study of a government agency. Technol. Forecast. Soc. Chang. 2008, 75, 687–720. [CrossRef] 51. Lu, H.; You, H.; Lu, H.; You, H. Roadmap Modeling and Assessment Approach for Defense Technology System of Systems. Appl. Sci. 2018, 8, 908. [CrossRef] 52. Frazier, F.W.E. Direct Digital Manufacturing of Metallic Components: Vision and Roadmap. In Proceedings of the 21st International Solid Freeform Fabrication Symposium, Austin, TX, USA, 9–11 August 2010; pp. 9–11. Available online: http://sffsymposium.engr.utexas.edu/Manuscripts/2010/2010-60-Frazier.pdf (accessed on 11 October 2018). 53. Putnik, G.; Sluga, A.; ElMaraghy, H.; Teti, R.; Koren, Y.; Tolio, T.; Hon, B. Scalability in manufacturing systems design and operation: State-of-the-art and future developments roadmap. CIRP Ann. 2013, 62, 751–774. [CrossRef] 54. Tate, D.; Nordlund, M. A Design Process Roadmap as a General Tool for Structuring and Supporting Design Activities. In Proceedings of the Second World Conference Integrated Design & Process Technology (IDPT-Vol. 3), Society for Design and Process Science, Austin, Texas, 1–4 December 1996; pp. 97–104. Available online: http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.473.8676&rep=rep1&type=pdf (accessed on 11 October 2018). 55. Martin-Moe, S.; Lim, F.J.; Wong, R.L.; Sreedhara, A.; Sundaram, J.; Sane, S.U. A new roadmap for biopharmaceutical drug product development: Integrating development, validation, and quality by design. J. Pharm. Sci. 2011, 100, 3031–3043. [CrossRef] 56. Zhang, Z.; Ou, J.; Li, D.; Zhang, S.; Zhang, Z.; Ou, J.; Li, D.; Zhang, S. Optimization Design of Coupling Beam Metal Damper in Shear Wall Structures. Appl. Sci. 2017, 7, 137. [CrossRef] 57. Alturki, A.; Gable, G.G.; Bandara, W. A Design Science Research Roadmap. In Proceedings of the International Conference on Design Science Research in Information Systems, Milwaukee, WI, USA, 5–6 May 2011; Springer: Berlin/Heidelberg, Germany, 2011; pp. 107–123. Available online: https://eprints.qut.edu.au/42496/7/42496.p df (accessed on 11 October 2018). 58. Kalogirou, S.A.; Palombo, A.; Pugsley, A.; Zacharopoulos, A.; Besheer, A.; Krstic-Furundzic, A.; Enesca, A.; Dută, A.; Savvides, A.; Ford, A.; et al. Building Integrated Solar Thermal Systems, Design and Applications Handbook; Kalogirou, S.A., Ed.; COST Oce: Brussels, Belgium, 2017; ISBN 978-9963-697-22-9. 59. Li, L.; Qu, M.; Peng, S. Performance evaluation of building integrated solar thermal shading system: Building energy consumption and daylight provision. Energy Build. 2016, 113, 189–201. [CrossRef] 60. Savvides, A.; Vassiliades, C.; Michael, A. Geometrical Optimization of the Urban Fabric in order to Ensure the Viability of Building Integration of Active Solar Systems. In Proceedings of the First International Conference on Building Integrated Renewable Energy Systems, Dublin, Ireland, 6–9 March 2017; Kalogirou, S., Kennedy, D., Eds.; p. 12. 61. Savvides, A.; Vassiliades, C.; Michael, A.; Kalogirou, S. Siting and building-massing considerations for the urban integration of active solar energy systems. Renew. Energy 2019, 135, 963–974. [CrossRef] 62. Light and lighting—Basic Terms and Criteria for Specifying Lighting Requirements; EN 12665: Brussels, Belgium, 2011; pp. 3–48. 63. Carlucci, S.; Causone, F.; De Rosa, F.; Pagliano, L. A review of indices for assessing visual comfort with a view to their use in optimization processes to support building integrated design. Renew. Sustain. Energy Rev. 2015, 47, 1016–1033. [CrossRef] 64. TRNRSYS. 2019. Available online: http://www.trnsys.com/ (accessed on 04 May 2019). 65. Vassiliades, C.; Savvides, A.; Michael, A. Investigation of Sun Protection Issues of Building Envelopes via Active Energy Production Systems. In Proceedings of the Euro Elecs 2015, Guimarães, Portugal, 21–23 July 2015; Bragança, L., Yuba, A.N., Engel de Alvarez, C., Eds.; pp. 697–706. Appl. Sci. 2019, 9, 2462 16 of 16 66. Vassiliades, C.; Michael, A.; Savvides, A.; Kalogirou, S. Environmental Assessment of the Integration of Active Solar Energy Systems on Building Envelopes in Southern Europe. In Proceedings of the 10th International Conference on Sustainable Energy and Environmental Protection (SEEP 2017), Bled, Slovenia, 27–30 June 2017; Krope, J., Olabi, A.G., Goricanec, ˇ D., Božicnik, ˇ S., Eds.; University of Maribor Press: Bled, Slovenia, 2017; pp. 179–190. 67. Seiferlein, K.E. Annual Energy Review 2007; USDOE Energy Information Administration (EIA): Washington, DC, USA, 2008. [CrossRef] 68. Simmonds, P. Thermal Comfort and Optimal Energy Use. ASHRAE Trans. 1993, 99, 1037–1048. © 2019 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).

Journal

Applied SciencesMultidisciplinary Digital Publishing Institute

Published: Jun 17, 2019