Access the full text.
Sign up today, get DeepDyve free for 14 days.
When opened in 1981, the Humber Bridge became the world's longest span at 1410 m, a record it held for 17 years. Internal cable inspections of the two older major UK suspension bridges from 2004 to 2006 revealed unexpected levels of corrosion and broken wires. Following this discovery the Humber Bridge Board commissioned the development of a pro-active maintenance strategy which led to an internal inspection of the cables in 2009. Although only a few broken wires were found, there was extensive corrosion present which confirmed the need to minimize future deterioration and monitor the cable condition. A cable dehumidification system has been designed and installed on the bridge to prolong the life of the cables, and this sets new standards in terms of speed, quality and safety of the installation of the largest retrofitted system in the world. An acoustic monitoring system has also been installed which is the largest acoustic monitoring system currently fitted on a suspension bridge.
Bridge Structures – IOS Press
Published: Jan 1, 2011
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.