The 1960s saw the construction of two major suspension bridges in the UK. With a span of 1006 m, the Forth Road Bridge was a traditional design, whereas the M48 Severn Bridge at 988 m span was a highly innovative design using a steel box deck for stiffening. After nearly 40 years of heavy use the owners of Forth Road Bridge decided to carry out an internal inspection of their cables, which revealed unexpected results of corrosion, broken wires and a loss of strength. A review of how these problems were addressed and solved around the world was undertaken and cable dehumidification was seen as the best option. Installation of the Forth dehumidification system is nearing completion and sets new standards in terms of its method of installation, efficiency, and web-based control system. An inspection of the Severn Bridge cables followed the Forth inspections and somewhat worse results were revealed, which prompted the need to urgently install a cable dehumidification system. A partial system was rapidly designed and installed on the most deteriorated sections of the main cables, followed by a full system on the remainder of the cables. The full system is now commissioned and operating.
Bridge Structures – iospress
Published: Jan 1, 2009
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.