Get 20M+ Full-Text Papers For Less Than $1.50/day. Start a 14-Day Trial for You or Your Team.

Learn More →

Model for estimating productivity for the manufacture of aluminium formworks used for the construction of housing with the concrete wall constructive method

Model for estimating productivity for the manufacture of aluminium formworks used for the... In this article, the feasibility of using a model of estimating overall productivity in the production of aluminium formworks in a factory located in the City of Rio de Janeiro, Brazil, for the building of popular housing 'my home, my life' program developed by the Brazilian Government is evaluated. It stands out, that the concept of overall productivity, considers the productive and unproductive times, when production is stopped for some reason. The proposed model is composed of the process productivity and idleness functions. Process productivity involves all production activities of the products studied in this article. The idleness function includes all events that cause production to stop at the factory. The data collected during the production were processed via Monte Carlo simulation, using Palisade Corporation's @Risk 7.6.1 software. The results revealed that the proposed model was successful, indicating that it can be used in industry. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png International Journal of Productivity and Quality Management Inderscience Publishers

Model for estimating productivity for the manufacture of aluminium formworks used for the construction of housing with the concrete wall constructive method

Loading next page...
 
/lp/inderscience-publishers/model-for-estimating-productivity-for-the-manufacture-of-aluminium-nnh7HMCn8t

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
Inderscience Publishers
Copyright
Copyright © Inderscience Enterprises Ltd
ISSN
1746-6474
eISSN
1746-6482
DOI
10.1504/ijpqm.2023.128595
Publisher site
See Article on Publisher Site

Abstract

In this article, the feasibility of using a model of estimating overall productivity in the production of aluminium formworks in a factory located in the City of Rio de Janeiro, Brazil, for the building of popular housing 'my home, my life' program developed by the Brazilian Government is evaluated. It stands out, that the concept of overall productivity, considers the productive and unproductive times, when production is stopped for some reason. The proposed model is composed of the process productivity and idleness functions. Process productivity involves all production activities of the products studied in this article. The idleness function includes all events that cause production to stop at the factory. The data collected during the production were processed via Monte Carlo simulation, using Palisade Corporation's @Risk 7.6.1 software. The results revealed that the proposed model was successful, indicating that it can be used in industry.

Journal

International Journal of Productivity and Quality ManagementInderscience Publishers

Published: Jan 1, 2023

There are no references for this article.