Likelihood and cost impact of engineering change requirements for DoD contracts

Likelihood and cost impact of engineering change requirements for DoD contracts There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.Design/methodology/approachUsing the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.FindingsNot every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.Originality/valueThis paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of Defense Analytics and Logistics Emerald Publishing

Likelihood and cost impact of engineering change requirements for DoD contracts

Loading next page...
 
/lp/emerald-publishing/likelihood-and-cost-impact-of-engineering-change-requirements-for-dod-oSzllbh4Ce

References (41)

Publisher
Emerald Publishing
Copyright
© In accordance with section 105 of the US Copyright Act, this work has been produced by a US government employee and shall be considered a public domain work, as copyright protection is not available.
ISSN
2399-6439
DOI
10.1108/jdal-02-2018-0002
Publisher site
See Article on Publisher Site

Abstract

There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.Design/methodology/approachUsing the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.FindingsNot every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.Originality/valueThis paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.

Journal

Journal of Defense Analytics and LogisticsEmerald Publishing

Published: Sep 5, 2018

Keywords: Regression modeling; Contract portfolio management; ECP withhold; Engineering change proposal