Access the full text.
Sign up today, get DeepDyve free for 14 days.
J. Bolten, R. Leonard, M. Arena, Obaid Younossi, J. Sollinger (2008)
Sources of Weapon System Cost Growth: Analysis of 35 Major Defense Acquisition Programs
Distributed Common Ground Station-Navy)
Standard Missile Program (Shipborne guided missiles)
BQM-34 (Firebee, target drone)
C. Kopp (2007)
Boeing GBU-39/B Small Diameter Bomb I / Raytheon GBU-53/B Small Diameter Bomb II
Sensor Fuzed Weapon)
Bruce Harmon, S. Arnold (2013)
Choice of Contract Type and Other Policy Initiatives for Reducing Contract Prices
M. Sullivan (2015)
Defense Acquisitions: Assessments of Selected Weapon Programs
LVSR (Logistics Vehicle System)
(2015)
Operation of the Defense Acquisition System (DoDI 5000.02), Office of the Under Secretary of Defense for Acquisition, Technology, and Logistics
Advanced Special Improvement Models, radio WCMD (Wind Corrected Munitions Dispenser system)
(2018)
2013),Multivariate and Naïve Bayes Text Classification Approach to Cost Growth Risk in. Department of Defense Acquisition Programs, Defense Technical Information
LAIRCM (Large Aircraft Infrared Counter-Measure system)
C. Freeman (2013)
Multivariate and Naive Bayes Text Classification Approach to Cost Growth Risk in Department of Defense Acquisition Programs
Ian Cordell (2017)
Engineering Change Orders and their Impact on DoD Acquisition Contracts
B-52 CONECT (B-52 Stratofortress Combat Network Communications Technology)
H. Miller (2008)
CH-47 Chinook
Larry Holden (1973)
AWACS—Airborne Warning and Control SystemRUSI Journal, 118
AWS (Affordable Weapon System, cruise missile program)
F-15 RMP (F-15 Radar Modernization Program (RMP))
Likelihood and cost impact RIM-66 (SM-2 BLK IVA, Missile Program)
ASLS (Aircraft Structural Life Surveillance program)
PAC-3) Patriot Missile upgrade
AGM-65 (Maverick, air-to-ground tactical missile)
Essentris (Documentation and electronic medical record system)
MTVR (Medium Tactical Vehicle Replacement)
Standoff Land Attack Missile Expanded Response, cruise missile)
MGM-140 (ATACMS, Army Tactical Missile system)
CHCS (Composite Health Care System)
Global Combat Support Systems -Marine Corps)
GQM-163 (Coyote, supersonic sea skimming target)
AEHF (Advanced Extremely High Frequency communication satellites)
(2018)
Ellis is a Cost Analyst at Eglin Air Force Base, Florida. Captain Ellis graduated with a Bachelor of Arts (BA) in Business Finance
Department of defense programs used in the modeling database F/A-18E/F (Super Hornet)
M. Arena, R. Leonard, Sheila Murray, Obaid Younossi (2006)
Historical Cost Growth of Completed Weapon System Programs
ADM-160 MALD (Miniature Air-Launched Decoy)
Ryan Trudelle, E. White, C. Koschnick, J. Ritschel, B. Lucas (2017)
Estimating an acquisition program’s likelihood of staying within cost and schedule bounds, 24
AHLTA (Armed Forces Health Longitudinal Technology Application)
GBU-24 (Paveway III, laser-guided missile)
Tecnología (2010)
AH-64 Apache
MHS (Military Health System)
There appears to be no empirical-based method in the literature for estimating if an engineering change proposal (ECP) will occur or the dollar amount incurred. This paper aims to present an empirically based approach to address this shortfall.Design/methodology/approachUsing the cost assessment data enterprise database, 533 contracts were randomly selected via a stratified sampling plan to build two regression models: one to predict the likelihood of a contract experiencing an ECP and the other to determine the expected median per cent increase in baseline contract cost if an ECP was likely. Both models adopted a stepwise approach. A validation set was placed aside prior to any model building.FindingsNot every contract incurs an ECP; approximately 80 per cent of the contracts in the database did not have an ECP. The likelihood of an ECP and the additional amount incurred appears to be statistically independent of acquisition phase, branch of service, commodity, contract type or any other factor except for the basic contract amount and the number of contract line item numbers; both of these later variables equally affected the contract percentage increase because of an ECP. The combined model overall bested current anecdotal approaches to ECP withhold.Originality/valueThis paper both serves as a published reference point for ECP withholds in the archival forum and presents an empirically based method for determining per cent ECP withhold to use.
Journal of Defense Analytics and Logistics – Emerald Publishing
Published: Sep 5, 2018
Keywords: Regression modeling; Contract portfolio management; ECP withhold; Engineering change proposal
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.