Access the full text.
Sign up today, get DeepDyve free for 14 days.
D. Edwards, Erika Parn, P. Love, H. El-Gohary (2017)
Research note: Machinery, manumission, and economic machinationsJournal of Business Research, 70
F. Berssaneti, M. Carvalho (2015)
Identification of variables that impact project success in Brazilian companiesInternational Journal of Project Management, 33
D. Cruzes, T. Dybå (2011)
Recommended Steps for Thematic Synthesis in Software Engineering2011 International Symposium on Empirical Software Engineering and Measurement
Dongping Cao, Guangbin Wang, Heng Li, M. Skitmore, Ting Huang, Weiyu Zhang (2015)
Practices and effectiveness of building information modelling in construction projects in ChinaAutomation in Construction, 49
E. Pellicer, V. Yepes, Christian Correa, L. Alarcón (2014)
Model for Systematic Innovation in Construction CompaniesJournal of Construction Engineering and Management-asce, 140
Wim Smits, Marc Buiten, T. Hartmann (2017)
Yield-to-BIM: impacts of BIM maturity on project performanceBuilding Research & Information, 45
Igor Martek, M. Hosseini, Asheem Shrestha, D. Edwards, S. Durdyev (2019)
Barriers inhibiting the transition to sustainability within the Australian construction industry: An investigation of technical and social interactionsJournal of Cleaner Production
H. Adnan, Norfashiha Hashim, M. Marhani, Mohd Johari (2013)
Project Management Success for ContractorsWorld Academy of Science, Engineering and Technology, International Journal of Social, Behavioral, Educational, Economic, Business and Industrial Engineering, 7
S. Al-Tmeemy, H. Abdul-Rahman, Z. Harun (2011)
Future criteria for success of building projects in MalaysiaInternational Journal of Project Management, 29
Oluseye Olugboyega, Emmanuel Omopariola, Olusegun Ilori (2019)
Model for Creating Cloud-BIM Environment in AEC Firms: A Grounded Theory ApproachAmerican Journal of Civil Engineering and Architecture, 7
Z. Tsiga, M. Emes, Alan Smith (2016)
Critical Success Factors for Projects in the Space Sector.The Journal of Modern Project Management, 3
Jaman Alzahrani, M. Emsley (2013)
The impact of contractors' attributes on construction project success: A post construction evaluationInternational Journal of Project Management, 31
B. Succar, W. Sher, A. Williams (2012)
Measuring BIM performance: Five metricsArchitectural Engineering and Design Management, 8
A. Chan, Ada Chan (2004)
Key performance indicators for measuring construction successBenchmarking: An International Journal, 11
Chansik Park, Do-Yeop Lee, Oh-Seong Kwon, Xiangyu Wang (2013)
A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection templateAutomation in Construction, 33
Kristen Barlish, K. Sullivan (2012)
How To Measure the Benefits of BIM - A Case Study ApproachAutomation in Construction, 24
Eissa Alreshidi, M. Mourshed, Y. Rezgui (2017)
Factors for effective BIM governanceJournal of building engineering, 10
M. Sun, Xianhai Meng (2009)
Taxonomy for change causes and effects in construction projectsInternational Journal of Project Management, 27
L. Ding, Ying Zhou, B. Akinci (2014)
Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nDAutomation in Construction, 46
Forest Peterson, T. Hartmann, R. Fruchter, M. Fischer (2011)
Teaching construction project management with BIM support: Experience and lessons learnedAutomation in Construction, 20
John Yeung, A. Chan, Daniel Chan, Y. Chiang, Huan Yang (2013)
Developing a Benchmarking Model for Construction Projects in Hong KongJournal of Construction Engineering and Management-asce, 139
(2004)
A set of evaluation criteria for performance measurement performance measurement systems in the construction industry
Fernanda Leite, Asli Akcamete, B. Akinci, G. Atasoy, Semiha Kiziltas (2011)
Analysis of modeling effort and impact of different levels of detail in building information modelsAutomation in Construction, 20
A.J. Shenhar, R.M. Wideman (1996)
Improving project management: linking success criteria to project type
R. Sebastian, Léon Berlo (2010)
Tool for Benchmarking BIM Performance of Design, Engineering and Construction Firms in The NetherlandsArchitectural Engineering and Design Management, 6
M. Antwi-Afari, Heng Li, Erika Parn, D. Edwards (2018)
Critical success factors for implementing building information modelling (BIM): A longitudinal reviewAutomation in Construction
D. Sarkar, H. Raghavendra, Mitul Ruparelia (2015)
Role of Key Performance Indicators for evaluating the usage of BIM as tool for Facility Management of Construction ProjectsInternational Journal of Civil and Structural Engineering, 5
A. Travaglini, M. Radujković, M. Mancini (2014)
Building Information Modelling (BIM) and Project Management: a Stakeholders PerspectiveOrganization, technology and management in construction: An international journal, 6
R. Eadie, H. Odeyinka, M. Browne, C. McKeown, Michael Yohanis (2013)
An analysis of the drivers for adopting building information modellingJ. Inf. Technol. Constr., 18
G. Locatelli, D. Invernizzi, N. Brookes (2017)
Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projectsTransportation Research Part A-policy and Practice, 98
M. Parsanejad, Hiroaki Matsukawa, E. Teimoury (2012)
A Comparative Framework for Measuring Project Success, 7
Hongyang Li, Xiaoling Zhang, S. Ng, M. Skitmore (2018)
Quantifying stakeholder influence in decision/evaluations relating to sustainable construction in China – A Delphi approachJournal of Cleaner Production, 173
S. Zanjirchi, M. Moradi (2012)
Construction project success analysis from stakeholders theory perspectiveAfrican Journal of Business Management, 6
(2012)
The study of dynamic stakeholder management in sustainable construction project
A. Chan, David Scott, Edmond Lam (2002)
Framework of Success Criteria for Design/Build ProjectsJournal of Management in Engineering, 18
Pedro Ribeiro, A. Paiva, J. Varajão, C. Dominguez (2013)
Success evaluation factors in construction project management — some evidence from medium and large Portuguese companiesKSCE Journal of Civil Engineering, 17
A. Ghaffarianhoseini, J. Tookey, Amirhosein Ghaffarianhoseini, N. Naismith, S. Azhar, Olia Efimova, K. Raahemifar (2017)
Building Information Modelling (BIM) uptake: Clear benefits, understanding its implementation, risks and challengesRenewable & Sustainable Energy Reviews, 75
M. Hosseini, Mehran Namzadi, R. Rameezdeen, S. Banihashemi, N. Chileshe (2016)
Barriers to BIM adoption: Perceptions from Australian small and medium-sized enterprises (SMEs)
M. Khalfan (2015)
Building information model and supply chain integration: A reviewJournal of Economics, Business and Management, 3
Yi Tan, Yongze Song, Xin Liu, Xiangyu Wang, Jack Cheng (2017)
A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platformsAutomation in Construction, 79
A. Hope, Jonas Ebbesen (2013)
Re-imagining the Iron Triangle: Embedding Sustainability into Project Constraints
(2007)
BMC Medical Research Methodology
BMC Medical Research Methodology, 8
Zedan Hatush, M. Skitmore (1997)
Evaluating contractor prequalification data: selection criteria and project success factorsConstruction Management and Economics, 15
P. Love, J. Matthews, I. Simpson, Andrew Hill, O. Olatunji (2014)
A benefits realization management building information modeling framework for asset ownersAutomation in Construction, 37
D. Migilinskas, V. Popov, Virgaudas Juocevičius, L. Ustinovichius (2013)
The Benefits, Obstacles and Problems of Practical Bim ImplementationProcedia Engineering, 57
M. Hosseini, Erika Parn, D. Edwards, E. Papadonikolaki, Mehran Oraee (2018)
Roadmap to Mature BIM Use in Australian SMEs: Competitive Dynamics PerspectiveJournal of Management in Engineering
Asheem Shrestha, J. Tamošaitienė, Igor Martek, M. Hosseini, David Edwards (2019)
A Principal-Agent Theory Perspective on PPP Risk AllocationSustainability
Erika Parn, D. Edwards (2017)
Conceptualising the FinDD API plug-in: A study of BIM-FM integrationAutomation in Construction, 80
A. Alashwal, Nurfarhana Fareed, K. Al-Obaidi (2017)
Determining Success Criteria and Success Factors for International Construction Projects for Malaysian ContractorsAustralasian Journal of Construction Economics and Building, 17
Hong Xiao, D. Proverbs (2003)
Factors influencing contractor performance: an international investigationEngineering, Construction and Architectural Management, 10
Behnam Neyestani (2016)
Effectiveness of Quality Management System (QMS) on Construction Projects
Wai Han, A. Yusof, S. Ismail, Ng Aun (2011)
Reviewing the Notions of Construction Project SuccessInternational Journal of Biometrics, 7
Badiru Yusuf, K. Ali, M. Embi (2016)
Building Information Modeling as a Process of Systemic Changes for Collaborative Education in Higher InstitutionProcedia - Social and Behavioral Sciences, 219
International Journal of Economics and Management Engineering, 74
Zhexiong Shang, Zhigang Shen (2014)
Critical Success Factors (CSFs) of BIM Implementation for Collaboration based on System AnalysisComputing in Civil and Building Engineering
Weisheng Lu, Yi Peng, Q. Shen, Heng Li (2013)
Generic Model for Measuring Benefits of BIM as a Learning Tool in Construction TasksJournal of Construction Engineering and Management-asce, 139
Dino Zuppa, R. Issa, P. Suermann (2009)
BIM's Impact on the Success Measures of Construction ProjectsComputing in Civil Engineering
(2011)
The cost of not doing BIM: education and professional development
P. Love, I. Simpson, Andrew Hill, C. Standing (2013)
From justification to evaluation: Building information modeling for asset ownersAutomation in Construction, 35
S. Hughes, D. Tippett, W. Thomas (2004)
Measuring Project Success in the Construction IndustryEngineering Management Journal, 16
E. Westerveld (2003)
The Project Excellence Model®: linking success criteria and critical success factorsInternational Journal of Project Management, 21
Reijo Miettinen, S. Paavola (2014)
Beyond the BIM utopia: Approaches to the development and implementation of building information modelingAutomation in Construction, 43
T. Cooke‐Davies (2002)
The “real” success factors on projectsInternational Journal of Project Management, 20
Yu-Cheng Lin, Cheng-Ping Lin, Hsin-Tzu Hu, Yu-Chih Su (2018)
Developing final as-built BIM model management system for owners during project closeout: A case studyAdv. Eng. Informatics, 36
Liisa Lehtiranta, S. Kärnä, Juha-Matti Junnonen, P. Julin (2012)
The role of multi-firm satisfaction in construction project successConstruction Management and Economics, 30
R. Atkinson (1999)
Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteriaInternational Journal of Project Management, 17
Luong Nguyen, Tsunemi Watanabe (2017)
The Impact of Project Organizational Culture on the Performance of Construction ProjectsSustainability, 9
D. Bryde, Martí Broquetas, Jurgen Volm (2013)
The project benefits of Building Information Modelling (BIM)International Journal of Project Management, 31
Jing Du, Rui Liu, R. Issa (2014)
BIM Cloud Score: Benchmarking BIM PerformanceJournal of Construction Engineering and Management-asce, 140
Jongsung Won, Ghang Lee (2016)
How to tell if a BIM project is successful: A goal-driven approachAutomation in Construction, 69
A. Shenhar, J. Renier, Max Wideman (2001)
Improving PM: Linking Success Criteria to Project Type A paper presented to the Southern Alberta Chapter, Project Management Institute, Symposium "Creating Canadian Advantage through Project Management", Calgary, May 1996.
Z. Prostějovská, J. Tomankova (2017)
Project management: how to assess a project’s successBit Numerical Mathematics, 7
M. Sambasivan, Y. Soon (2007)
Causes and effects of delays in Malaysian construction industryInternational Journal of Project Management, 25
M. Manavazhi, Dinesh Adhikari (2002)
Material and equipment procurement delays in highway projects in NepalInternational Journal of Project Management, 20
Visuth Chovichien, T. Nguyen (2013)
LIST OF INDICATORS AND CRITERIA FOR EVALUATING CONSTRUCTION PROJECT SUCCESS AND THEIR WEIGHT ASSIGNMENT
Y. Chen, Yangbing Zhang, Jun Liu, Peng Mo (2012)
Interrelationships among Critical Success Factors of Construction Projects Based on the Structural Equation ModelJournal of Management in Engineering, 28
R. Takim, A. Akintoye (2005)
PERFORMANCE INDICATORS FOR SUCCESSFUL CONSTRUCTION PROJECT PERFORMANCE
Zhipeng Zhou, J. Irizarry, Qiming Li (2013)
Applying advanced technology to improve safety management in the construction industry: a literature reviewConstruction Management and Economics, 31
(1997)
The causes and effects of construction delays on completion cost of housing projects in Nigeria
C. Roberts, Erika Parn, D. Edwards, C. Aigbavboa (2018)
Digitalising asset management: concomitant benefits and persistent challenges, 36
Shahrzad Khosravi, H. Afshari (2011)
A Success Measurement Model for Construction Projects
B. Ozorhon, Ugur Karahan (2017)
Critical Success Factors of Building Information Modeling ImplementationJournal of Management in Engineering, 33
E. Poirier, S. Staub-French, D. Forgues (2015)
Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-researchAutomation in Construction, 58
Ghang Lee, Jongsung Won (2015)
Goal-driven method for sustainable evaluation of BIM project success level
E. Papadonikolaki, R. Vrijhoef, J. Wamelink (2015)
BIM adoption in integrated Supply Chains: A multiple case study
R. Takim, M. Harris, A. Nawawi (2013)
Building Information Modeling (BIM): A New Paradigm for Quality of Life Within Architectural, Engineering and Construction (AEC) IndustryProcedia - Social and Behavioral Sciences, 101
T. Williams (2016)
Identifying Success Factors in Construction Projects: A Case StudyProject Management Journal, 47
T. Hartmann, H. Meerveld, N. Vossebeld, A. Adriaanse (2012)
Aligning building information model tools and construction management methodsAutomation in Construction, 22
(2016)
BIM benefits-maturity relationship awareness among UK construction clients
A. Al‐Momani (2000)
Construction delay: a quantitative analysisInternational Journal of Project Management, 18
Oluseye Olugboyega, A. Windapo (2019)
A Building Information Modelling-Integrated Model of Construction Project Performance IndicatorsThe Construction Industry in the Fourth Industrial Revolution
Md Masrom, M. Rahim, S. Mohamed, Goh Chen, R. Yunus (2015)
Successful criteria for large infrastructure projects in MalaysiaProcedia Engineering, 125
Y. Yong, N. Mustaffa (2017)
Critical Success Factors for Malaysian Construction Projects: An Investigative Review, 4
(2019)
Framework for managing BIM benefits: a benefits breakdown hierarchy approach
A. Aibinu, G. Jagboro (2002)
The effects of construction delays on project delivery in Nigerian construction industryInternational Journal of Project Management, 20
Erika Parn, D. Edwards, M. Sing (2018)
Origins and probabilities of MEP and structural design clashes within a federated BIM modelAutomation in Construction, 85
Y. Al-Saeed, D. Edwards, Stephen Scaysbrook (2020)
Automating construction manufacturing procedures using BIM digital objects (BDOs)Construction Innovation: Information, Process, Management, 20
A. Grilo, R. Jardim-Gonçalves (2010)
Value proposition on interoperability of BIM and collaborative working environmentsAutomation in Construction, 19
A. Fevolden, Lars Coenen, Teis Hansen, Antje Klitkou (2017)
The Role of Trials and Demonstration Projects in the Development of a Sustainable BioeconomySustainability, 9
A. Shenhar, D. Dvir, Ofer Levy, A. Maltz (2001)
Project Success: A Multidimensional Strategic ConceptLong Range Planning, 34
Jongsung Won, Ghang Lee, C. Dossick, J. Messner (2013)
Where to Focus for Successful Adoption of Building Information Modeling within OrganizationJournal of Construction Engineering and Management-asce, 139
S. Shirowzhan, S. Sepasgozar, D. Edwards, Heng Li, Chen Wang (2020)
BIM compatibility and its differentiation with interoperability challenges as an innovation factorAutomation in Construction
S. Hajiagha, Maryam Shokouhinia, S. Hashemi (2016)
Success Criteria in Oil, Gas and Petrochemical Projects
(2015)
Building Information Modeling in Project Management: Necessities, Challenges and Outcomes☆Procedia - Social and Behavioral Sciences, 210
Lela Zimmer (2006)
Qualitative meta-synthesis: a question of dialoguing with texts.Journal of advanced nursing, 53 3
A. Chan, D. Ho, C. Tam (2001)
Design and Build Project Success Factors: Multivariate AnalysisJournal of Construction Engineering and Management-asce, 127
A. Fazli, Sajad Fathi, M. Enferadi, Mayram Fazli, Behrooz Fathi (2014)
Appraising Effectiveness of Building Information Management (BIM) in Project ManagementProcedia Technology, 16
Lijuan Chen, Hanbin Luo (2014)
A BIM-based construction quality management model and its applicationsAutomation in Construction, 46
P. Eriksson (2015)
Partnering in engineering projects: Four dimensions of supply chain integrationJournal of Purchasing and Supply Management, 21
Dongping Cao, Heng Li, Guangbin Wang (2014)
Impacts of Isomorphic Pressures on BIM Adoption in Construction ProjectsJournal of Construction Engineering and Management-asce, 140
P. Tuohy, G. Murphy (2015)
Closing the gap in building performance: learning from BIM benchmark industriesArchitectural Science Review, 58
S. Babu (2015)
Critical Success Factors InfluencingPerformance of Construction ProjectsInternational Journal of Innovative Research in Science, Engineering and Technology, 4
Research into project success (PS) has a long pedigree as has research into the impact of building information modelling (BIM) on projects. Yet, despite the many revealed advantages BIM is known to deliver to projects, the relationship between the level of BIM application within a project, BIM's ability to impact a project at that level and the consequent effectiveness and range of success factors BIM is able to bestow across levels remains unmapped. Given the importance of evaluating the success of BIM-based construction projects (BBCPs) and the necessity to ensure the continual improvement of the BIM process, there is a need to identify the relationship between the level of BIM employed on a project and the specific PS factors that BIM is able to impact at that level.Design/methodology/approachThis study puts forward a conceptual model for evaluating the success of BBCPs. A thematic synthesis approach is taken, using Scopus and other databases, and retrieving relevant articles from some 50 journals.FindingsEight success criteria for BBCPs were extracted and categorised according to BIM's ability to impact them across four levels of project application. Mapping BIM's variable impact at these four levels against the eight success factors produces a model for evaluating the PS of BBCPs. The model posits that the success of a BBCP is a function of the extent to which BIM is applied to the project. Moreover, the findings indicate that an increase in the number of PS criteria (PSC) for a BBCP is a derivative of BIM effectiveness, and not BIM impact.Originality/valueThis work constitutes seminal research to examine the concept of PS and PSC for BBCPs with the view to developing a model for evaluating the PS of BBCPs.
Smart and Sustainable Built Environment Market – Emerald Publishing
Published: Nov 12, 2021
Keywords: BIM-Based construction projects; BIM; Project success; BIM impacts; BIM effectiveness
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.