Access the full text.
Sign up today, get DeepDyve free for 14 days.
AbstractIn the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.
Management Systems in Production Engineering – de Gruyter
Published: Dec 1, 2017
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.