Operational Verification of a Ship Main Power System Element Choice – Case Study AbstractThe article refers to results and conclusions on post-emergency repairs of a turbo-charging system of a DEUTZ engine of the SBV 8M 628 type of 1715 kW – the main power unit of a cement carrier. The failure of the turbocharger led to severing of a part of the exhaust outlet valve head. In order to determine the cause of the turbocharger fault, parametric identification of the reference state of the turbocharging system interacting with the ship main power engine has been carried out. The post-emergency servicing of the turbocharger comprised mounting a new blade rim of expansive instruments of smaller capacity than the so far used. Control measurement results of the power system after the replacement of the turbocharger turbine nozzle have been presented. Limitations of correct engine operation have been noted in the range of maximum load with continuous power (MCR). A range of corrective maintenance servicing of fuel equipment has been presented. Using the values of measured torque at the propeller shaft, incorrect interaction between the shaft and the main engine has been noted. A new propeller, adequate to the design operational parameters of the engine characteristics, has been chosen and mounted. The correctness of turbine expansive instrument replacement has been verified by correct interaction between the elements of the power system: propeller – main engine – turbocharging system. Thus, a wider range of economically acceptable ship operation has been obtained. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Journal of KONES de Gruyter

Operational Verification of a Ship Main Power System Element Choice – Case Study

Journal of KONES , Volume 26 (4): 8 – Dec 1, 2019

Loading next page...
 
/lp/de-gruyter/operational-verification-of-a-ship-main-power-system-element-choice-1GiY0I9ZX8

References

References for this paper are not available at this time. We will be adding them shortly, thank you for your patience.

Publisher
de Gruyter
Copyright
© 2019 Andrzej Adamkiewicz et al., published by Sciendo
eISSN
2354-0133
DOI
10.2478/kones-2019-0120
Publisher site
See Article on Publisher Site

Abstract

AbstractThe article refers to results and conclusions on post-emergency repairs of a turbo-charging system of a DEUTZ engine of the SBV 8M 628 type of 1715 kW – the main power unit of a cement carrier. The failure of the turbocharger led to severing of a part of the exhaust outlet valve head. In order to determine the cause of the turbocharger fault, parametric identification of the reference state of the turbocharging system interacting with the ship main power engine has been carried out. The post-emergency servicing of the turbocharger comprised mounting a new blade rim of expansive instruments of smaller capacity than the so far used. Control measurement results of the power system after the replacement of the turbocharger turbine nozzle have been presented. Limitations of correct engine operation have been noted in the range of maximum load with continuous power (MCR). A range of corrective maintenance servicing of fuel equipment has been presented. Using the values of measured torque at the propeller shaft, incorrect interaction between the shaft and the main engine has been noted. A new propeller, adequate to the design operational parameters of the engine characteristics, has been chosen and mounted. The correctness of turbine expansive instrument replacement has been verified by correct interaction between the elements of the power system: propeller – main engine – turbocharging system. Thus, a wider range of economically acceptable ship operation has been obtained.