Access the full text.
Sign up today, get DeepDyve free for 14 days.
J. Hassanpour, Jamal Rostami, M. Khamehchiyan, A. Bruland, H. Tavakoli (2010)
TBM Performance Analysis in Pyroclastic Rocks: A Case History of Karaj Water Conveyance TunnelRock Mechanics and Rock Engineering, 43
(2017)
2017. Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The art of tunneling in a new world. [In:] Engineering Challenges for Sustainable Underground Use. GeoMEast 2017
(2007)
TBM excavability: prediction and machine-rock interaction
(2014)
The NTNU prediction model for performance
(1998)
Prediction model for performance and costs. Norwegian TBM Tunnelling
M. Mohamed (1991)
Lithostratigraphy and framework of sedimentation of the subsurface Paleogene succession in northern Qatar, Arabian GulfNeues Jahrbuch Fur Geologie Und Palaontologie-monatshefte, 1991
A. Benato, P. Oreste (2015)
Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristicsInternational Journal of Rock Mechanics and Mining Sciences, 74
(2017)
Statistica (data analysis software system)
(2013)
Abu Hamour Drainage Tunnel. First TBM Mined Tunnel in Doha, Qatar
(1998)
Prediction model for performance and costs
A. Ramezanzadeh (2005)
Performance analysis and development of new models for performance prediction of hard rock TBMs in rock mass
A. Salimi, J. Rostami, C. Moormann, A. Delisio (2016)
Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMsTunnelling and Underground Space Technology, 58
L. Breiman, R. Olshen (2017)
Points of Significance: Classification and regression treesNature Methods, 14
N. Barton (2000)
TBM Tunnelling in Jointed and Faulted Rock
(1997)
Development of a force estimation model for rock fragmentation with disccutters through theoretical modeling and physical measurement of crushed zone pressure
E. Avunduk, H. Copur, N. Bilgin, C. Balci, D. Tumac (2012)
Effect of Some Geotechnical Properties On TBM Performance
A. Delisio, Jian Zhao, Jian Zhao (2014)
A new model for TBM performance prediction in blocky rock conditionsTunnelling and Underground Space Technology, 43
J. Stypulkowski, A. Pathak, F. Bernardeau (2016)
Engineering geology for weak rocks of Abu Hamour surface and ground water drainage tunnel Phase-1, Doha, Qatar
J. Hamidi, K. Shahriar, B. Rezai, J. Rostami (2010)
Performance prediction of hard rock TBM using Rock Mass Rating (RMR) systemTunnelling and Underground Space Technology, 25
(2012)
Geomechanics in underground construction : design and construction of tunnels (in Polish). AGH, Kraków
(2014)
The NTNU prediction model for performance. Norwegian Tunnelling Technology, Publication No
(1998)
Report 1B-98 Hard Rock Tunnel Boring -Advance Rate and Cutter Wear
(2017)
Machine Learning Approach to Predicting and Maximizing Penetration Rates in EPB TBMs
(2012)
Geomechanics in underground construction : design and construction of tunnels
(2017)
Machine Learning Approach to Predicting and Maximizing Penetration Rates in EPB TBMs. https:// src.acm.org, access 2017
(2015)
Super-vision of Engineering Geological Activities during Construction of Abu Hamour Surface and Ground Water Drainage Tunnel Phase-1 Doha, Qatar
S. Yagiz (2008)
Utilizing rock mass properties for predicting TBM performance in hard rock conditionTunnelling and Underground Space Technology, 23
Q. Gong, Jian Zhao (2009)
Development of a rock mass characteristics model for TBM penetration rate predictionInternational Journal of Rock Mechanics and Mining Sciences, 46
(2008)
A Fossil Hunting Guide to the Tertiary Formations of Qatar
P. Jain, A. Naithani, T. Singh (2014)
Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps - A case studyJournal of rock mechanics and geotechnical engineering, 6
J. Stypulkowski, F. Bernardeau (2017)
Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The Art of Tunneling in a New World
J. Hassanpour, J. Rostami, Jian Zhao (2011)
A new hard rock TBM performance prediction model for project planningTunnelling and Underground Space Technology, 26
(1995)
RMi, a rock mass characterization system for rock engineering purposes
ReferencesAbu Zeid M.M., 1991. Lithostratigraphy and framework of sedimentation of the subsurface Paleogene succession in northern Qatar. Arabian Gulf. N. Jb. Geol. Paliaiont. Mh.: 191-204.Avunduk E. Copur H., Bilgin N., Balci C., Tumac D., 2012. Effect of Some Geotechnical Properties on TBM Performance.Eurock 2012 ISRM International Symposium, 28-30 May 2012, Stockholm, Sweden.Barton N., 2000. TBM Tunneling In Jointed and Faulted Rock. Balkema, Rotterdam, p. 173.Benato A., Oreste P., 2015. Prediction of penetration per revolution in TBM tunneling as a function of intact rock and rock mass characteristics. Int. J. Rock Mech. Min. Sci. 74, 119-127.http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000349983700013&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=b7bc2757938ac7a7a821505f8243d9f3Bieniawski Z.T., Celada B., Galera J.M., 2007. TBM excavability: prediction and machine-rock interaction. In: Proceedings, Rapid Excavation and Tunneling Conference, pp. 1118-1130.Breiman L., Friedman, J.H., Olshen, R.A., Stone, C.J., 1984. Classification and Regression Trees. Chapman & Hall/CRC.Bruland A., 1998. Prediction model for performance and costs. Norwegian TBM Tunnelling, Publication No. 11. Norwegian Tunnelling Society.Bruland A., 2014. The NTNU prediction model for performance. Norwegian Tunnelling Technology, Publication No. 23. Norwegian Tunnelling Society.Delisio A., Zhao J., 2014. A new model for TBM performance prediction in blocky rock conditions. Tunnel. Undergr. Space Technol. 43, 440-452.Gong Q.M., Zhao J., 2009. Development of a rock mass characteristics model for TBM penetration rate prediction. Int. J. Rock Mech. Mining. Sci. 46 (1), 8-18.http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000263101100002&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=b7bc2757938ac7a7a821505f8243d9f310.1016/j.ijrmms.2008.03.003Hamidi J.K., Shahriar K., Rezai B., Rostami J., 2010. Performance prediction of hard rock TBM using rock mass rating (RMR) system. Tunn.http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000278296900005&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=b7bc2757938ac7a7a821505f8243d9f3Hassanpour J., Rostami J., Khamehchiyan M., Bruland A., Tavakoli H.R., 2010. TBM performance analysis in pyroclastic rocks, a case history of Karaj Water Conveyance Tunnel (KWCT). J. Rock Mech. Rock Eng. 4, 427-445.http://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcApp=PARTNER_APP&SrcAuth=LinksAMR&KeyUT=WOS:000281783600005&DestLinkType=FullRecord&DestApp=ALL_WOS&UsrCustomerID=b7bc2757938ac7a7a821505f8243d9f310.1007/s00603-009-0060-2Hassanpour J., Rostami J., Zhao J., 2011. A new hard rock TBM performance prediction model for project planning. Tunnel. Undergr. Space Technol. 26, 595-603.Jain P., Naithani A.K., Singh .TN., 2014. Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps - a case study. Int. J. Rock Mech. Geo. Eng. 6 (1), 36-47.10.1016/j.jrmge.2013.11.003LeBlanc J., 2008. A Fossil Hunting Guide to the Tertiary Formations of Qatar. Middle East. First Edition, March 2008. Maher J.A., 2017. Machine Learning Approach to Predicting and Maximizing Penetration Rates in EPB TBMs. https://src.acm.org, access 2017.NTNU, 1998. Report 1B-98 Hard Rock Tunnel Boring - Advance Rate and Cutter Wear. Department of Civil and Transport Engineering, Trondheim, Norway.Palmstrom A., 1995. RMi, a rock mass characterization system for rock engineering purposes. Chapter 7, Ph.D. thesis, Oslo University, Norway.Pathak A.K., Stypulkowski J.B, Bernardeau F.G., 2015. Super-vision of Engineering Geological Activities during Construction of Abu Hamour Surface and Ground Water Drainage Tunnel Phase-1 Doha, Qatar. [In:] InternationalConference on Engineering Geology in New Millennium at IIT, New Delhi 27-29 Oct 2015. Special Publication, J. of .EG. October 2015, pp. 467-486.Ramezanzadeh A., 2005. Performance analysis and Development of new models for performance prediction of hard rock TBMs in rock mass. Ph.D. thesis, INSA, Lyon, France.Rostami J., 1997. Development of a force estimation model for rock fragmentation with disccutters through theoretical modeling and physical measurement of crushed zone pressure, Ph.D. thesis, Colorado School of Mines, Golden, Colorado, USA, p. 249.Salimi A., Rostami J., Moormann C., Delisio A., 2016. Application of nonlinear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs. Tunn Undergr Space.Stypulkowski J.B., Siyam A.A.F.M., Bernardeau F.G., Al Kuwari N.G., 2013. Abu Hamour Drainage Tunnel. First TBM Mined Tunnel in Doha, Qatar. [In] The First Arabian Tunnelling Conference & Exhibition, Dubai, pp. 300-314.Stypulkowski J.B., Bernardeau F.G., Jakubowski J., 2017. Abu Hamour Tunnel Phase I the First TBM Tunnel in Qatar: The art of tunneling in a new world. [In:] Engineering Challenges for Sustainable Underground Use. GeoMEast 2017. Springer, Cham.Tajduś A., Cała M., Tajduś K., 2012. Geomechanics in underground construction : design and construction of tunnels (in Polish). AGH, Kraków.Tibco Software Inc., 2017. Statistica (data analysis software system), version 13.Yagiz S., 2008. Utilizing rock mass properties for predicting TBM performance in hard rock condition. Tunn. Undergr. Space Technol. 23 (3), 326-339.
Archives of Mining Sciences – de Gruyter
Published: Dec 20, 2017
You can share this free article with as many people as you like with the url below! We hope you enjoy this feature!
Read and print from thousands of top scholarly journals.
Already have an account? Log in
Bookmark this article. You can see your Bookmarks on your DeepDyve Library.
To save an article, log in first, or sign up for a DeepDyve account if you don’t already have one.
Copy and paste the desired citation format or use the link below to download a file formatted for EndNote
Access the full text.
Sign up today, get DeepDyve free for 14 days.
All DeepDyve websites use cookies to improve your online experience. They were placed on your computer when you launched this website. You can change your cookie settings through your browser.