Conception of the Track System for „Dębieńsko 1” Mining Plant

Conception of the Track System for „Dębieńsko 1” Mining Plant AbstractThis article presents two concepts of site development for the „Dębieńsko 1” mining plant including plans for the track system. The first plan was created in 2013 year and mainly assumed the renovation of railway infrastructure, without changing its shape and configuration. In 2014 year it was resigned from realization of the first conception and there was proposed the second plan. It included changes in the existing track system and project of the new system of excavated raw material haulage. This system is successfully using in the USA and provides the better work productivity of a shunting locomotive. In this article also were indicated the advantages and the disadvantages of solutions proposed in the two projects of site development plans. It was denoted the project that has ultimately been chosen with the justification of choice. http://www.deepdyve.com/assets/images/DeepDyve-Logo-lg.png Management Systems in Production Engineering de Gruyter

Conception of the Track System for „Dębieńsko 1” Mining Plant

Loading next page...
 
/lp/de-gruyter/conception-of-the-track-system-for-d-bie-sko-1-mining-plant-HgnbG2h0x0
Publisher
de Gruyter
Copyright
© 2018
eISSN
2450-5781
DOI
10.2478/mspe-10-03-2016
Publisher site
See Article on Publisher Site

Abstract

AbstractThis article presents two concepts of site development for the „Dębieńsko 1” mining plant including plans for the track system. The first plan was created in 2013 year and mainly assumed the renovation of railway infrastructure, without changing its shape and configuration. In 2014 year it was resigned from realization of the first conception and there was proposed the second plan. It included changes in the existing track system and project of the new system of excavated raw material haulage. This system is successfully using in the USA and provides the better work productivity of a shunting locomotive. In this article also were indicated the advantages and the disadvantages of solutions proposed in the two projects of site development plans. It was denoted the project that has ultimately been chosen with the justification of choice.

Journal

Management Systems in Production Engineeringde Gruyter

Published: Sep 1, 2016